General building work permit checklist — Draper, Utah

Assembled from Draper’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Draper requires a permit for general building work.

When a permit is not required

Draper's zoning-side building permit ordinance (9-5-120) lists no exemptions; it requires a complete application, fees and a scaled plot plan for any building permit, and states the permit expires if construction does not commence within 180 days (extensions available). Draper does not publish its own list of exempt work, relying instead on the state-adopted construction code.

What Draper publishes for this permit

  • 14 submittal documents to include with the application
  • 1 process step from application to final
  • 1 published fee line from the city's fee schedule
  • Checked against Draper's documents on November 5, 2026

Loading the full checklist…

Sources

Other permits Draper publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Draper permit requirementsDraper permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Draper before you build.