B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Estimate & calculate
CalculatorsChecklists
PricingLog in
Home / Utah Permits / Riverton

Building Permits in Riverton, Utah

City in Salt Lake County
Verified July 2026
See Riverton's fees, required documents and inspection sequence: free for 14 days, no card required.Sign inStart free trial

Adopted Construction Codes

CodeEditionAdoption
IBC — International Building CodeSTATE-REF: "The most recent version of the International Building Code(s) adopted by the state of Utah, including building, residential, plumbing, electrical, mechanical, administrative, energy, conservation, fuel, gas, and existing buildings code, and any adopted appendices" (15.10.010)Riverton City Code 15.10.010; history: Code 1997 §§ 9-5-31, 15-50-102; Ord. 4-4-00-1; Ord. 6-21-05-1; Ord. 10-07; Ord. 19-05 (passage and effective dates not printed) · source ↗
IEBC — International Existing Building CodeSTATE-REF: "existing buildings code" within the most recent version adopted by the state of Utah (15.10.010)Riverton City Code 15.10.010; history: Code 1997 §§ 9-5-31, 15-50-102; Ord. 4-4-00-1; Ord. 6-21-05-1; Ord. 10-07; Ord. 19-05 (passage and effective dates not printed) · source ↗
IECC — International Energy Conservation CodeFLOATING: 2009 Edition of the International Energy Conservation Code named in 15.50.010, "and any subsequent editions"Riverton City Code 15.50.010; history: Code 1997 § 15-50-105; Ord. 10-07 (passage and effective dates not printed) · source ↗
IFC — FLOATING: 2009 Edition of the International Fire Code named in 15.20.010, "and any subsequent editions"Riverton City Code 15.20.010, 15.20.020; history: Code 1997 § 10-1-50; Ord. 1-25-05-1; Ord. 10-07 (passage and effective dates not printed) · source ↗
IMC — International Mechanical CodeFLOATING: 2009 Edition of the International Mechanical Code named in 15.30.010, "and any subsequent editions"Riverton City Code 15.30.010; history: Code 1997 § 15-50-104; Ord. 4-4-00-1; Ord. 10-07 (passage and effective dates not printed) · source ↗
IPC — International Plumbing CodeFLOATING: 2009 Edition of the International Plumbing Code named in 15.25.010, "and any subsequent editions"Riverton City Code 15.25.010; history: Code 1997 §§ 9-5-61, 15-50-101; Ord. 4-4-00-1; Ord. 6-21-05-1; Ord. 10-07 (passage and effective dates not printed) · source ↗
IRC — International Residential CodeSTATE-REF: "residential ... code" within the most recent version adopted by the state of Utah (15.10.010)Riverton City Code 15.10.010; history: Code 1997 §§ 9-5-31, 15-50-102; Ord. 4-4-00-1; Ord. 6-21-05-1; Ord. 10-07; Ord. 19-05 (passage and effective dates not printed) · source ↗
NEC — National Electrical Code (NFPA 70)FLOATING: 2008 Edition of the National Electrical Code named in 15.15.010, "and any subsequent editions"Riverton City Code 15.15.010; history: Code 1997 §§ 9-5-40, 15-50-109; Ord. 4-4-00-1; Ord. 6-21-05-1; Ord. 10-07 (passage and effective dates not printed) · source ↗
How much does a permit cost in Riverton? →
Published fee amounts by permit type, how Riverton calculates them, plan review and surcharges — quoted from the official fee schedule.
Permit checklists by project →
Deck, fence, shed, water heater and more — whether Riverton requires a permit, what to submit, which inspections it publishes, and what it charges. Every line quoted from a Riverton document.

Permit Requirements

building permit
Riverton specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
deck permit
Riverton specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
electrical permit
Riverton specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
fence permit
Riverton specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
reroof permit
Riverton specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
retaining wall permit
Riverton specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
shed permit
Riverton specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
water heater permit
Riverton specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial

Building Department

Building department website ↗

Phone: 801-208-3138

Permit fee schedule ↗ · fee schedule checked August 2026

Riverton publishes two documents that together set building fees: the adopted citywide Fee Schedule (Fiscal Year 2026-2027), whose Building section lists flat permit fees and per-square-foot valuation rules, and a separate Modified Building Fee Schedule reproducing a 1994 Modified UBC Table 1-A valuation-to-fee table used to convert valuation into the permit fee. All valuations are calculated using current ICC Valuation Tables. Several Building line items carry old effective dates (many are March 5, 2019; some are marked "Date Unknown"), and the Modified Building Fee Schedule PDF is served with a December 2019 cache stamp, so the table itself is stale even though the fee schedule that references it is current.

Ask BuildSpec AI about Riverton

Get a plain-English answer grounded in this page’s verified data — e.g. “Do I need a permit for a 180 sq ft shed in Riverton?”

Ask Code AI →
Have a specific address?

Get a printable permit report for any address — jurisdiction, adopted codes, exemption rules, and who to call, on one page.

Get an Address Report →

Related on BuildSpec

Utah adopted codes →Utah DOT specifications →Code calculators →
Riverton, Utah Building Permits & Codes | BuildSpec