B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Estimate & calculate
CalculatorsChecklists
PricingLog in
Home / Utah Permits / West Jordan

Building Permits in West Jordan, Utah

City in Salt Lake County
Verified July 2026
See West Jordan's fees, required documents and inspection sequence: free for 14 days, no card required.Sign inStart free trial

Adopted Construction Codes

CodeEditionAdoption
IBC — International Building CodeFLOATING: 2015 edition named in 10-1-2(A); appendix clause 10-1-2(B) reads "2015 (or subsequent) edition"West Jordan City Code 10-1-2; history: Ord. 10-16 (6-23-2010); Ord. 13-25 (7-31-2013); Ord. 17-59 (10-25-2017); Ord. 21-11 passed 3-24-2021; effective date not printed · source ↗
IEBC — International Existing Building CodeFLOATING: 2015 edition named in 10-1-11; later State-enacted editions deemed automatically adoptedWest Jordan City Code 10-1-11; history: Ord. 10-16 (6-23-2010); Ord. 13-25 (7-31-2013); Ord. 17-59 (10-25-2017); Ord. 21-11 passed 3-24-2021; effective date not printed · source ↗
IECC — International Energy Conservation CodeFLOATING: 2015 edition named in 10-1-8; later State-enacted editions deemed automatically adoptedWest Jordan City Code 10-1-8; history: Ord. 10-16 (6-23-2010); Ord. 13-25 (7-31-2013); Ord. 17-59 (10-25-2017); Ord. 21-11 passed 3-24-2021; effective date not printed · source ↗
IFC — FLOATING: 2024 edition named in 10-1-7(A); clause also states the most current edition is automatically adopted when effective under Utah lawWest Jordan City Code 10-1-7; history through Ord. 19-11 (2-27-2019); Ord. 21-11 (3-24-2021); Ord. 26-15 passed 3-10-2026; effective date not printed · source ↗
IMC — International Mechanical CodeFLOATING: 2015 edition named in 10-1-3(A); later State-enacted editions deemed automatically adoptedWest Jordan City Code 10-1-3; history: Ord. 10-16 (6-23-2010); Ord. 12-10 (4-25-2012, eff. 7-1-2012); Ord. 13-25 (7-31-2013); Ord. 17-59 (10-25-2017); Ord. 21-11 passed 3-24-2021; effective date of latest not printed · source ↗
IPC — International Plumbing CodeFLOATING: 2015 edition named in 10-1-5(A); later State-enacted editions deemed automatically adoptedWest Jordan City Code 10-1-5; history: Ord. 10-16 (6-23-2010); Ord. 12-10 (4-25-2012, eff. 7-1-2012); Ord. 13-25 (7-31-2013); Ord. 17-59 (10-25-2017); Ord. 21-11 passed 3-24-2021; effective date of latest not printed · source ↗
IRC — International Residential CodeFLOATING: 2015 edition named in 10-1-10; later State-enacted editions deemed automatically adoptedWest Jordan City Code 10-1-10; history: 2001 Code 18-2-901; Ord. 10-16 (6-23-2010); Ord. 13-25 (7-31-2013); Ord. 17-59 (10-25-2017); Ord. 21-11 passed 3-24-2021; effective date not printed · source ↗
How much does a permit cost in West Jordan? →
Published fee amounts by permit type, how West Jordan calculates them, plan review and surcharges — quoted from the official fee schedule.
Permit checklists by project →
Deck, fence, shed, water heater and more — whether West Jordan requires a permit, what to submit, which inspections it publishes, and what it charges. Every line quoted from a West Jordan document.

Permit Requirements

building permit
West Jordan specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
electrical permit
West Jordan specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
retaining wall permit
West Jordan specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
shed permit
West Jordan specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial
water heater permit
West Jordan specifics
Fees, required documents and the inspection sequence is available to BuildSpec members. Sign inStart free 14-day trial

Building Department

Building department website ↗

Phone: 801-569-5050

Apply online — West Jordan permit portal ↗

Permit fee schedule ↗ · fee schedule checked August 2026

West Jordan building permit fees come from a stepped valuation table in the FY2027 Consolidated Fee Schedule (Res. 26-021, effective through June 30, 2027), starting at a $60.50 base fee for valuations of $1 to $2,000 and rising to a $6,803.00 base plus $3.80 per additional $1,000 above $1,000,000. Valuation is set from the ICC Building Valuation Data current as of July 1 each year. Plan review is added at 40% of the permit fee for residential and 65% for multi-family and non-residential, plus a 1% state surcharge and a $12 permit processing fee. Building permit amounts are unchanged from the FY2026 schedule. Note that the schedule states a $150 minimum for the residential solar building permit in its body text and a $100 minimum in its appendix.

Ask BuildSpec AI about West Jordan

Get a plain-English answer grounded in this page’s verified data — e.g. “Do I need a permit for a 180 sq ft shed in West Jordan?”

Ask Code AI →
Have a specific address?

Get a printable permit report for any address — jurisdiction, adopted codes, exemption rules, and who to call, on one page.

Get an Address Report →

Related on BuildSpec

Utah adopted codes →Utah DOT specifications →Code calculators →