B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
PricingLog in

B. Progress Estimate

Defined in the MichiganDOT standard specifications. This is the agency’s own text, with the section it comes from.

Definitions are quoted from state-authored public specification books. This page carries no I-Code-derived terms.

Michigan · MDOT

Estimate made as the work progresses showing estimated work performed and materials furnished upon which periodic payments are made. Estimated Pile Length. Length shown on the p lans used as a guide for estimating the w ork and ordering t est piles if the n ominal pile driving resistance is shown on the p lans. Estimated Pile Tip Elevation. Elevation shown on the p lans, estimated for piles to develop the n ominal pile driving resistance.

Section 101 — Terms, Format, and Definitions
← All defined terms|Browse state DOT specifications →