Plan Quantity
Defined in the standard specifications of 3 state transportation agencies. Each definition below is the agency’s own text, with the section it comes from — they do not all say the same thing, and on a contract the difference is the point.
Definitions are quoted from state-authored public specification books. This page carries no I-Code-derived terms.
The quantity listed on the bid schedule paid for as specified in 109.01.B.
Section 101 — GENERAL, ABBREVIATIONS, AND DEFINITIONS →Original contract quantity of a pay item.
Section 101 — Terms, Format, and Definitions →The quantity of a contract item shown on the bid item list and the plans. Plans. The project plans and standard drawings that show the location, character, and dimensions of the prescribed work, including layouts, profiles, cross sections, and other details. Project Plans. A set of plans addressing the work required for the project. At the time of advertisement, the project plans may include the following: a vicinity map, a summary of quantities, notes, signing information, traffic control plans, and detailed drawings. Standard Drawings. An approved set of drawings showing standard details of construction and materials for the work on a project. Predecessor. An activity that is defined by schedule logic to precede another activity. A predecessor may control the start or finish date of its successor. Section 101 10 Project. The specific section of highway on which construction is to be performed under the contract. Project Control Number (PCN). A number generated by the Department for project tracking.
Section 101 — ABBREVIATIONS AND DEFINITIONS →