Standard Drawings
Defined in the standard specifications of 3 state transportation agencies. Each definition below is the agency’s own text, with the section it comes from — they do not all say the same thing, and on a contract the difference is the point.
Definitions are quoted from state-authored public specification books. This page carries no I-Code-derived terms.
Drawings approved for repetitive use, showing details to be used where appropriate. Standard Specifications. A book of specifications approved for general application and repetitive use. State. The State of Alabama, the party of the first part to the contract, acting by and through the
Section 101 — DEFINITION OF TERMS →An approved set of drawings showing standard details of construction and materials for the work on a project. Predecessor. An activity that is defined by schedule logic to precede another activity. A predecessor may control the start or finish date of its successor. Section 101 10 Project. The specific section of highway on which construction is to be performed under the contract. Project Control Number (PCN). A number generated by the Department for project tracking.
Section 101 — ABBREVIATIONS AND DEFINITIONS →Detailed drawings for specific items of Work approved for repetitive use.
Section 101 — Abbreviations, Symbols, T erms, and Definitions →