UFC 3-740-05 Construction Cost Estimating

Methods, procedures, and formats for preparation of construction cost estimates for DoD projects.

What This Publication Covers

Ch. 1
General

Purpose and applicability of DoD construction cost estimating across the project life cycle.

Ch. 2
Estimate Types

Parametric, budgetary, and detailed estimates keyed to design phase (planning, 35%, 65%, 95%, final).

Ch. 3
Estimating Methods

Quantity takeoff, unit pricing, crew-based productivity, and the use of MII (MCACES) as the DoD standard estimating system.

Ch. 4
Markups & Contingency

Overhead, profit, escalation, contingency, and SIOH factors.

Ch. 5
Review & Validation

Independent government estimate procedures, reconciliation with bids, and documentation.

U.S. government publication β€” public domain. Outline for orientation; the full text is in the PDF at USACE.

Open PDF β†—
πŸ›οΈ

Read UFC 3-740-05 at USACE

The USACE publications server only allows its PDFs to be framed on its own site, so the copy below opens at the source. It is a public-domain federal document β€” free, no account, no paywall. BuildSpec members read it inline here instead.

Open UFC 3-740-05 (PDF) β†—