Home / Calculators / Building Permit Fee Calculator

Modesto, California Building Permit Cost Calculator

Estimates permit cost in Modesto from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○ADU or small dwelling up to 1,200 sq ft
Flat fee $2,429.00
$2,429.00
○Dwelling up to 5,000 sq ft
Flat fee $3,560.00
$3,560.00
○Addition 500 sq ft or less
Flat fee $1,896.00
$1,896.00
○Residential remodel, no structural review
Flat fee $881.00
$881.00
○Garage
Flat fee $954.00
$954.00
○General plan maintenance recovery
$0.55 x 250 = $137.50
$137.50
How this jurisdiction calculates the fee

Modesto does not use a valuation table. The Building Safety Division fee schedule sets flat per-permit fees by project category and building size, and each residential fee expressly bundles the mechanical, plumbing and electrical work into the one number. Custom dwellings and ADUs are priced by size band; tract housing is split into a one-time master plan review per development plus a per-production-home fee; additions and remodels have their own flat fees, with anything over the top band converting to a deposit against actual cost. Everything is due at time of application. On top of the project fee the city adds the state green building standards (CalGreen/SB 1473-type) fee scaled to permit valuation, a general plan maintenance recovery charge of $0.55 per $1,000 of valuation, and the residential Strong Motion Instrumentation (SMIP) tax of $2.00; extra plan review or inspection beyond what the flat fee covers is billed hourly ($233/hr non-structural, $255/hr structural, $216/hr inspection). Schedule effective July 1, 2025 through June 30, 2026. ADOPTION STATUS UNRESOLVED: this schedule's own printed term expired on June 30, 2026, but as of September 9, 2026 the city's Development Fee Schedule page still lists the Fiscal Year 25-26 Building Safety Division document as the current schedule and publishes no FY 2026-27 successor, so the figures above are those of the only Building Safety schedule the city publishes. Confirm the amount being collected with the Building Safety Division.

Source: published fee schedule · Verified 9/15/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Improvements: decks, patio enclosures and covers, carports, covered porch (residential)
Flat fee $498.00
$498.00
○Commercial minor improvements incl. decks, up to 500 sq ft
Flat fee $1,331.00
$1,331.00
○Plan review, structural
Flat fee $255.00
$255.00
○Green building standards fee, $1 to $25,000 valuation
Flat fee $1.00
$1.00
How this jurisdiction calculates the fee

Decks are not valuation-priced. The fee schedule folds decks into a single flat 'Improvements' permit fee that also covers patio enclosures and covers, carports and covered porches - one price regardless of size - and it is due at time of application. Commercial minor improvements including decks fall into a much higher flat category. Add the valuation-scaled green building standards fee, the $0.55 per $1,000 general plan maintenance recovery and the $2.00 residential SMIP tax; structural plan review beyond the flat fee is billed at $255.00 per hour. Effective July 1, 2025 to June 30, 2026. ADOPTION STATUS UNRESOLVED: this schedule's own printed term expired on June 30, 2026, but as of September 9, 2026 the city's Development Fee Schedule page still lists the Fiscal Year 25-26 Building Safety Division document as the current schedule and publishes no FY 2026-27 successor, so the figures above are those of the only Building Safety schedule the city publishes. Confirm the amount being collected with the Building Safety Division.

Source: published fee schedule · Verified 9/15/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Mechanical/plumbing/electrical - minor (residential and small commercial)
Flat fee $242.00
$242.00
○Mechanical/plumbing/electrical - commercial/industrial
Flat fee $1,021.00
$1,021.00
○Electrical photovoltaic - residential
Flat fee $333.00
$333.00
○Electrical photovoltaic - commercial (deposit)
Flat fee $1,098.00
$1,098.00
○Reinspection
Flat fee $216.00
$216.00
How this jurisdiction calculates the fee

Modesto prices standalone electrical work as a flat trade permit rather than per fixture or per circuit. Residential and small-commercial work - new lighting and outlet circuitry, service changes, HVAC replacements, plumbing repairs and similar - all fall into one 'Mechanical Plumbing Electrical - Minor' flat fee, per the division's endnote. Larger commercial systems go to the commercial/industrial category, and residential photovoltaic has its own flat fee while commercial PV is taken as a deposit against actual cost. Add the green building standards fee on valuation, the $0.55 per $1,000 general plan maintenance recovery and the $2.00 residential SMIP tax; extra inspections are $216.00 per hour. Effective July 1, 2025 to June 30, 2026. ADOPTION STATUS UNRESOLVED (re-checked 2026-09-10): this schedule's own printed term expired on June 30, 2026, but the city's Development Fee Schedule page still lists the Fiscal Year 25-26 Building Safety Division document as the current schedule and publishes no FY 2026-27 successor, so the figures above are those of the only Building Safety schedule the city publishes. Every figure above was re-read from that document today and is unchanged. Confirm the amount being collected with the Building Safety Division.

Source: published fee schedule · Verified 9/15/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum fee permit (governing charge - no dedicated fence fee published)
Flat fee $242.00
$242.00
○Plan review, non-structural
Flat fee $233.00
$233.00
○Plan review, structural
Flat fee $255.00
$255.00
○Inspection
Flat fee $216.00
$216.00
How this jurisdiction calculates the fee

The Building Safety Division fee schedule publishes no dedicated fence permit fee. A fence over 7 feet that needs a permit is handled under the schedule's catch-all Minimum Fee Permit, which the division's own endnote says exists to cover small projects that do not fit elsewhere in the fee schedule (and is non-refundable), with any additional plan review or inspection billed hourly at $233.00 (non-structural), $255.00 (structural) or $216.00 (inspection). The $0.55 per $1,000 general plan maintenance recovery and the green building standards fee apply on the declared valuation. Effective July 1, 2025 to June 30, 2026. ADOPTION STATUS UNRESOLVED: this schedule's own printed term expired on June 30, 2026, but as of September 9, 2026 the city's Development Fee Schedule page still lists the Fiscal Year 25-26 Building Safety Division document as the current schedule and publishes no FY 2026-27 successor, so the figures above are those of the only Building Safety schedule the city publishes. Confirm the amount being collected with the Building Safety Division.

Source: published fee schedule · Verified 9/15/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Re-roofing, residential
Flat fee $349.00
$349.00
○Re-roofing, commercial
Flat fee $558.00
$558.00
○Green building standards fee, $1 to $25,000 valuation
Flat fee $1.00
$1.00
○Strong motion tax, residential
Flat fee $2.00
$2.00
○Reinspection
Flat fee $216.00
$216.00
How this jurisdiction calculates the fee

Reroofing is a flat per-permit fee, split residential versus commercial, with no valuation math and no separate plan check charge - the flat fee covers the standard inspections. Add the green building standards fee based on the valuation you declare ($1.00 at $1 to $25,000 of valuation), the $0.55 per $1,000 general plan maintenance recovery, and the $2.00 residential SMIP tax. Any additional or out-of-sequence inspection is billed at $216.00 per hour. Effective July 1, 2025 to June 30, 2026. ADOPTION STATUS UNRESOLVED: this schedule's own printed term expired on June 30, 2026, but as of September 9, 2026 the city's Development Fee Schedule page still lists the Fiscal Year 25-26 Building Safety Division document as the current schedule and publishes no FY 2026-27 successor, so the figures above are those of the only Building Safety schedule the city publishes. Confirm the amount being collected with the Building Safety Division.

Source: published fee schedule · Verified 9/15/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum fee permit (governing charge - no dedicated retaining wall fee published)
Flat fee $242.00
$242.00
○Plan review, structural
Flat fee $255.00
$255.00
○Inspection / reinspection
Flat fee $216.00
$216.00
○General plan maintenance recovery
$0.55 x 250 = $137.50
$137.50
How this jurisdiction calculates the fee

There is no retaining wall line in the Building Safety Division fee schedule. A permitted wall is charged under the catch-all Minimum Fee Permit for small projects the schedule does not name, with structural plan review of the engineering billed on top at the hourly rate and inspections at the hourly inspection rate; the schedule's endnote also allows the Chief Building Official to apply hourly charges for service beyond what the base permit covers. Add the $0.55 per $1,000 general plan maintenance recovery, the green building standards fee based on valuation, and the $2.00 residential SMIP tax. Effective July 1, 2025 to June 30, 2026. ADOPTION STATUS UNRESOLVED: this schedule's own printed term expired on June 30, 2026, but as of September 9, 2026 the city's Development Fee Schedule page still lists the Fiscal Year 25-26 Building Safety Division document as the current schedule and publishes no FY 2026-27 successor, so the figures above are those of the only Building Safety schedule the city publishes. Confirm the amount being collected with the Building Safety Division.

Source: published fee schedule · Verified 9/15/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Accessory building 120 to 500 sq ft
Flat fee $654.00
$654.00
○Accessory building over 500 sq ft (charged as garage)
Flat fee $954.00
$954.00
○Commercial accessory building 500 sq ft or less
Flat fee $654.00
$654.00
○Minimum fee permit (small projects not in the schedule)
Flat fee $242.00
$242.00
How this jurisdiction calculates the fee

Sheds are flat-fee, not valuation-based, and only once they exceed the 120 sq ft exemption. The schedule sets one price for accessory buildings from 120 to 500 sq ft and routes anything larger to the garage fee. Add the green building standards fee scaled to declared valuation, the $0.55 per $1,000 general plan maintenance recovery and the $2.00 residential SMIP tax. Effective July 1, 2025 to June 30, 2026. ADOPTION STATUS UNRESOLVED: this schedule's own printed term expired on June 30, 2026, but as of September 9, 2026 the city's Development Fee Schedule page still lists the Fiscal Year 25-26 Building Safety Division document as the current schedule and publishes no FY 2026-27 successor, so the figures above are those of the only Building Safety schedule the city publishes. Confirm the amount being collected with the Building Safety Division.

Source: published fee schedule · Verified 9/15/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Water heater replacement
Flat fee $139.00
$139.00
○Mechanical/plumbing/electrical - minor (if bundled with other work)
Flat fee $242.00
$242.00
○Strong motion tax, residential
Flat fee $2.00
$2.00
○Green building standards fee, $1 to $25,000 valuation
Flat fee $1.00
$1.00
How this jurisdiction calculates the fee

Water heater replacement is its own flat, one-price permit in the residential section of the fee schedule, cheaper than the general minor mechanical/plumbing/electrical permit, and it is due at time of application. There is no per-fixture or valuation math. The $2.00 residential SMIP tax, the $0.55 per $1,000 general plan maintenance recovery and the $1.00 green building standards fee at the lowest valuation band apply on top; a reinspection is billed at the $216.00 hourly rate. Effective July 1, 2025 to June 30, 2026. ADOPTION STATUS UNRESOLVED: this schedule's own printed term expired on June 30, 2026, but as of September 9, 2026 the city's Development Fee Schedule page still lists the Fiscal Year 25-26 Building Safety Division document as the current schedule and publishes no FY 2026-27 successor, so the figures above are those of the only Building Safety schedule the city publishes. Confirm the amount being collected with the Building Safety Division.

Source: published fee schedule · Verified 9/15/2026

See the full write-up: Modesto building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.