B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Ontario, California Building Permit Cost Calculator

Estimates permit cost in Ontario from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Building permit base fee, valuation $1 to $2,000
$30.00 plus $3.90 for each additional $100 above $500
see rule
Building permit base fee, valuation $2,001 to $25,000
$89.00 plus $18.00 for each additional $1,000
see rule
Building permit base fee, valuation $25,001 to $50,000
$507.00 plus $13.00 for each additional $1,000
see rule
Building permit base fee, valuation $100,001 to $500,000
$1,288.00 plus $7.00 for each additional $1,000
see rule
Building permit base fee, valuation over $1,000,001
$7,273.00 plus $4.73 for each additional $1,000
see rule
Building plan check fee · add-on
80.00% of permit fee (40.00% for tract or duplicate buildings) — select the permit fee line above to calculate
see rule
○Building permit issuance fee
Flat fee $50.00
$50.00
How this jurisdiction calculates the fee

Ontario prices building permits from a valuation-bracket table in the Citywide Fee Schedule: you determine the construction valuation, find the bracket, and pay the listed base amount plus a per-increment charge within the bracket. Building plan check is a flat 80 percent of the permit fee for standard projects, dropping to 40 percent for tract/duplicate buildings where a master plan has already been reviewed, and a separate permit issuance fee applies. SUPERSESSION 2026-09-10: this row cited the Citywide Fee Schedule as of July 1, 2025, which still returns HTTP 200 but is no longer the schedule the city links from its Revenues, Taxes and Fees page; the current document is the FY 2026-27 Citywide Fee Schedule as of July 1, 2026, whose Building lines were adopted by Resolution No. 2025-181 with an effective date of 8/22/2026 - eight days after this row was last verified. Every valuation bracket rose: the $2,001-$25,000 base went from $76.00 to $89.00, $25,001-$50,000 from $430.00 to $507.00 and $100,001-$500,000 from $1,192.50 to $1,288.00. The $47.50 minimum permit fee and the earthquake-surcharge multipliers previously carried here are NOT restated: neither appears anywhere in the current or the prior Citywide Fee Schedule, and the Building Department Fees page they came from is no longer reachable.

Source: published fee schedule · Verified 11/6/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Electrical permit issuance
Flat fee $50.00
$50.00
○Electrical outlets/switches/fixtures, first 15 fixtures
Flat fee $201.60
$201.60
○Additional fixtures
Flat fee $12.21
$12.21
○Service, 600 volts or less and not over 200 amperes
Flat fee $257.31
$257.31
○Service, 600 volts or less, over 200 to 1,000 amperes
Flat fee $300.54
$300.54
○Service, over 600 volts or over 1,000 amperes
Flat fee $1,030.00
$1,030.00
○Subpanel
Flat fee $246.73
$246.73
How this jurisdiction calculates the fee

Ontario charges electrical permits as a flat permit issuance fee plus a count-based fixture/outlet schedule and separate service-size lines, rather than any valuation percentage. SUPERSESSION 2026-09-10: this row cited the Citywide Fee Schedule as of July 1, 2025, which still returns HTTP 200 but is no longer linked from the city's Revenues, Taxes and Fees page. In the FY 2026-27 Citywide Fee Schedule as of July 1, 2026 (Building lines adopted by Resolution No. 2025-181, effective 8/22/2026) three things changed: the electrical permit issuance fee fell from $105.02 to $50.00; the outlet/switch/fixture bundle still costs $201.60 but now buys only the FIRST 15 FIXTURES instead of the first 20, so a 20-fixture job costs $61.05 more than the stored figures implied; and the single flat Electrical Permit Fee - Commercial of $554.00 has been REMOVED and replaced by service-size-banded lines. Plan check where required is 80 percent of the permit fee.

Source: published fee schedule · Verified 11/6/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Governing bracket, valuation $1 to $2,000
$30.00 plus $3.90 for each additional $100 above $500
see rule
Governing bracket, valuation $2,001 to $25,000
$89.00 plus $18.00 for each additional $1,000
see rule
Governing bracket, valuation $25,001 to $50,000
$507.00 plus $13.00 for each additional $1,000
see rule
Building plan check fee · add-on
80.00% of permit fee — select the permit fee line above to calculate
see rule
○Building permit issuance fee
Flat fee $50.00
$50.00
How this jurisdiction calculates the fee

There is no flat reroof, fence, wall or shed permit fee in the Ontario schedule; these are priced from the valuation-bracket building permit table, plus building plan check at 80 percent of the permit fee where drawings are required, plus the building permit issuance fee. SUPERSESSION 2026-09-10: this row cited the Citywide Fee Schedule as of July 1, 2025, which still returns HTTP 200 but is no longer linked from the city's Revenues, Taxes and Fees page. The governing brackets below are from the FY 2026-27 Citywide Fee Schedule as of July 1, 2026, Building lines adopted by Resolution No. 2025-181 effective 8/22/2026, and every bracket rose. The $47.50 minimum permit fee and the microfilming and earthquake-surcharge figures previously carried here are NOT restated: none of them appears in the current or the prior Citywide Fee Schedule, and the Building Department Fees page they came from is no longer reachable. Ontario's permit FAQ (unchanged) still requires a permit for concrete block walls over 3 feet from grade, block pilasters over 3 feet, chain link fences over 3 feet, open or screened wrought iron fences and gates over 3 feet, and retaining walls over 2 feet measured from the bottom of the footing.

Source: published fee schedule · Verified 11/6/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Governing bracket, valuation $1 to $2,000
$30.00 plus $3.90 for each additional $100 above $500
see rule
Governing bracket, valuation $2,001 to $25,000
$89.00 plus $18.00 for each additional $1,000
see rule
Governing bracket, valuation $25,001 to $50,000
$507.00 plus $13.00 for each additional $1,000
see rule
Building plan check fee · add-on
80.00% of permit fee — select the permit fee line above to calculate
see rule
○Building permit issuance fee
Flat fee $50.00
$50.00
How this jurisdiction calculates the fee

There is no flat reroof, fence, wall or shed permit fee in the Ontario schedule; these are priced from the valuation-bracket building permit table, plus building plan check at 80 percent of the permit fee where drawings are required, plus the building permit issuance fee. SUPERSESSION 2026-09-10: this row cited the Citywide Fee Schedule as of July 1, 2025, which still returns HTTP 200 but is no longer linked from the city's Revenues, Taxes and Fees page. The governing brackets below are from the FY 2026-27 Citywide Fee Schedule as of July 1, 2026, Building lines adopted by Resolution No. 2025-181 effective 8/22/2026, and every bracket rose. The $47.50 minimum permit fee and the microfilming and earthquake-surcharge figures previously carried here are NOT restated: none of them appears in the current or the prior Citywide Fee Schedule, and the Building Department Fees page they came from is no longer reachable. Ontario's permit FAQ (unchanged) still requires a permit for concrete block walls over 3 feet from grade, block pilasters over 3 feet, chain link fences over 3 feet, open or screened wrought iron fences and gates over 3 feet, and retaining walls over 2 feet measured from the bottom of the footing.

Source: published fee schedule · Verified 11/6/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Governing bracket, valuation $1 to $2,000
$30.00 plus $3.90 for each additional $100 above $500
see rule
Governing bracket, valuation $2,001 to $25,000
$89.00 plus $18.00 for each additional $1,000
see rule
Governing bracket, valuation $25,001 to $50,000
$507.00 plus $13.00 for each additional $1,000
see rule
Building plan check fee · add-on
80.00% of permit fee — select the permit fee line above to calculate
see rule
○Building permit issuance fee
Flat fee $50.00
$50.00
How this jurisdiction calculates the fee

There is no flat reroof, fence, wall or shed permit fee in the Ontario schedule; these are priced from the valuation-bracket building permit table, plus building plan check at 80 percent of the permit fee where drawings are required, plus the building permit issuance fee. SUPERSESSION 2026-09-10: this row cited the Citywide Fee Schedule as of July 1, 2025, which still returns HTTP 200 but is no longer linked from the city's Revenues, Taxes and Fees page. The governing brackets below are from the FY 2026-27 Citywide Fee Schedule as of July 1, 2026, Building lines adopted by Resolution No. 2025-181 effective 8/22/2026, and every bracket rose. The $47.50 minimum permit fee and the microfilming and earthquake-surcharge figures previously carried here are NOT restated: none of them appears in the current or the prior Citywide Fee Schedule, and the Building Department Fees page they came from is no longer reachable. Ontario's permit FAQ (unchanged) still requires a permit for concrete block walls over 3 feet from grade, block pilasters over 3 feet, chain link fences over 3 feet, open or screened wrought iron fences and gates over 3 feet, and retaining walls over 2 feet measured from the bottom of the footing.

Source: published fee schedule · Verified 11/6/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Governing bracket, valuation $1 to $2,000
$30.00 plus $3.90 for each additional $100 above $500
see rule
Governing bracket, valuation $2,001 to $25,000
$89.00 plus $18.00 for each additional $1,000
see rule
Governing bracket, valuation $25,001 to $50,000
$507.00 plus $13.00 for each additional $1,000
see rule
Building plan check fee · add-on
80.00% of permit fee — select the permit fee line above to calculate
see rule
○Building permit issuance fee
Flat fee $50.00
$50.00
How this jurisdiction calculates the fee

There is no flat reroof, fence, wall or shed permit fee in the Ontario schedule; these are priced from the valuation-bracket building permit table, plus building plan check at 80 percent of the permit fee where drawings are required, plus the building permit issuance fee. SUPERSESSION 2026-09-10: this row cited the Citywide Fee Schedule as of July 1, 2025, which still returns HTTP 200 but is no longer linked from the city's Revenues, Taxes and Fees page. The governing brackets below are from the FY 2026-27 Citywide Fee Schedule as of July 1, 2026, Building lines adopted by Resolution No. 2025-181 effective 8/22/2026, and every bracket rose. The $47.50 minimum permit fee and the microfilming and earthquake-surcharge figures previously carried here are NOT restated: none of them appears in the current or the prior Citywide Fee Schedule, and the Building Department Fees page they came from is no longer reachable. Ontario's permit FAQ (unchanged) still requires a permit for concrete block walls over 3 feet from grade, block pilasters over 3 feet, chain link fences over 3 feet, open or screened wrought iron fences and gates over 3 feet, and retaining walls over 2 feet measured from the bottom of the footing.

Source: published fee schedule · Verified 11/6/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Water heater including vent (plumbing)
Flat fee $240.00
$240.00
○Plumbing permit issuance fee
Flat fee $50.00
$50.00
○Plumbing, first 5 fixtures and vents (new and alterations)
Flat fee $215.73
$215.73
○Each additional fixture and vent
Flat fee $30.07
$30.07
○Gas piping systems, first 5 outlets
Flat fee $178.01
$178.01
How this jurisdiction calculates the fee

Ontario charges a flat per-appliance plumbing fee for a water heater, taken from the Plumbing portion of the Citywide Fee Schedule, added to a flat plumbing permit issuance fee. No valuation calculation applies. SUPERSESSION 2026-09-10, AND THIS IS THE LARGEST SINGLE CHANGE FOUND IN THIS ROW SET: this row cited the Citywide Fee Schedule as of July 1, 2025, which still returns HTTP 200 but is no longer linked from the city's Revenues, Taxes and Fees page. In the FY 2026-27 Citywide Fee Schedule as of July 1, 2026 (Resolution No. 2025-181, effective 8/22/2026) the water-heater-including-vent line went from $40.63 to $240.00, a near six-fold increase; the plumbing permit issuance fee fell from $110.96 to $50.00; and the fixture bundle still costs $215.73 but now buys only the FIRST 5 fixtures and vents instead of the first 15. A standalone water heater permit is therefore about $290.00 rather than about $150.00.

Source: published fee schedule · Verified 11/6/2026

See the full write-up: Ontario building permit cost