Oxnard, California Building Permit Cost Calculator
Estimates permit cost in Oxnard from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit fee, valuation $1 to $750 Flat fee $31.50 | $31.50 |
Building permit fee, valuation $3,001 to $37,500 $97.88 plus 1.240% of valuation over $3,000 | see rule |
Building permit fee, valuation $75,001 to $150,000 $855.68 plus 0.650% of valuation over $75,000 | see rule |
Building plan review · add-on 85% of the building permit fee — select the permit fee line above to calculate | see rule |
○Permit issuance fee Flat fee $45.00 | $45.00 |
General Plan Maintenance fee · add-on 0.24% of building permit valuation — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Oxnard prices general building permits off a valuation-based sliding table (Table 1 of the Community Development fee schedule, 'Fees Charged to Developers,' fees revised July 18, 2025 under Resolution Nos. 15,164 and 14,314). You compute the project's construction valuation, find the bracket, and pay the base amount plus the stated percentage of valuation above the bracket floor. On top of the permit fee Oxnard adds building plan review at 85 percent of the building permit fee (which covers the first three plan submittals), accessibility plan review at 20 percent of the permit fee where applicable, a flat permit issuance fee, a 5 percent Permit Center Improvement surcharge on processing fees, a General Plan Maintenance fee of 0.24 percent of valuation, plus the two California statewide add-ons: SMIP (Strong Motion Instrumentation) at $13.00 per $100,000 of valuation residential / $28.00 per $100,000 for other occupancies, and the SB 1473 green building standards fee at $4.00 per $100,000 of valuation with a $1.00 minimum. Every permit is subject to a floor equal to one half hour of inspection time. SUPERSESSION CHECK 2026-09-10: the cited July 18, 2025 edition still returns HTTP 200 but has been superseded by "Fees Charged Developers, Fees Revised July 18, 2026" (Effective July 18, 2026), at https://www.oxnard.gov/wp-content/uploads/b100-fees-charged-to-dev-7-18-2026.pdf. Every building-permit figure recorded here was re-read in the 2026 edition and is UNCHANGED; the only differences between the two editions are the development impact fees (traffic and park), which are not stored here and which decreased slightly. Provenance repointed to the 2026 edition.
Source: published fee schedule · Verified 11/6/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Governing bracket, valuation $751 to $3,000 $31.50 plus 2.95% of valuation over $750 | see rule |
Governing bracket, valuation $3,001 to $37,500 $97.88 plus 1.240% of valuation over $3,000 | see rule |
Building plan review add-on · add-on 85% of the building permit fee — select the permit fee line above to calculate | see rule |
○Inspection hourly rate / reinspection Flat fee $147.00 | $147.00 |
How this jurisdiction calculates the fee
Oxnard publishes no dedicated flat fee for a deck permit. The governing amounts are the valuation-based Table 1 building permit brackets: you supply the deck's construction valuation and pay the corresponding bracket amount, plus 85 percent of that amount for plan review, the permit issuance fee, the 5 percent Permit Center Improvement surcharge, the 0.24 percent General Plan Maintenance fee and the state SMIP and SB 1473 surcharges. A small deck normally lands in the $751-$3,000 or $3,001-$37,500 brackets. No permit can total less than one half hour of inspection time, and the inspection hourly rate is $147.00. Schedule revised July 18, 2025 (Resolution Nos. 15,164 and 14,314). SUPERSESSION CHECK 2026-09-10: the cited July 18, 2025 edition still returns HTTP 200 but has been superseded by "Fees Charged Developers, Fees Revised July 18, 2026" (Effective July 18, 2026), at https://www.oxnard.gov/wp-content/uploads/b100-fees-charged-to-dev-7-18-2026.pdf. Every building-permit figure recorded here was re-read in the 2026 edition and is UNCHANGED; the only differences between the two editions are the development impact fees (traffic and park), which are not stored here and which decreased slightly. Provenance repointed to the 2026 edition.
Source: published fee schedule · Verified 11/6/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○New single-family / two-family dwelling electrical $0.08 x 2,000 = $152.00 | $152.00 |
○New multi-family (3+ units) electrical $0.06 x 2,000 = $122.00 | $122.00 |
○Garages and carports electrical $0.03 x 2,000 = $62.00 | $62.00 |
○Photovoltaic system, single-family Flat fee $96.05 | $96.05 |
Electrical plan review · add-on 60% of the total permit fee — select the permit fee line above to calculate | see rule |
○Permit issuance fee Flat fee $45.00 | $45.00 |
How this jurisdiction calculates the fee
Oxnard prices electrical permits two ways. New residential construction is charged per square foot of the area served -- a per-square-foot rate that differs for single/two-family, multi-family and garages/carports. Non-residential and alteration work is charged on a unit-fee schedule (per outlet, per fixture, per apparatus). Rooftop photovoltaic on a single-family home has its own flat fee. Electrical plan review, where required, is 60 percent of the total permit fee. Standard add-ons apply: permit issuance fee, 5 percent Permit Center Improvement surcharge, and the SB 1473 state fee. Fees revised July 18, 2025 (Resolution Nos. 15,164 and 14,314). SUPERSESSION CHECK 2026-09-10: the cited July 18, 2025 edition still returns HTTP 200 but has been superseded by "Fees Charged Developers, Fees Revised July 18, 2026" (Effective July 18, 2026), at https://www.oxnard.gov/wp-content/uploads/b100-fees-charged-to-dev-7-18-2026.pdf. Every building-permit figure recorded here was re-read in the 2026 edition and is UNCHANGED; the only differences between the two editions are the development impact fees (traffic and park), which are not stored here and which decreased slightly. Provenance repointed to the 2026 edition.
Source: published fee schedule · Verified 11/6/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Governing bracket, valuation $1 to $750 Flat fee $31.50 | $31.50 |
Governing bracket, valuation $751 to $3,000 $31.50 plus 2.95% of valuation over $750 | see rule |
Governing bracket, valuation $3,001 to $37,500 $97.88 plus 1.240% of valuation over $3,000 | see rule |
○Inspection hourly rate Flat fee $147.00 | $147.00 |
How this jurisdiction calculates the fee
Oxnard publishes no flat fence or wall permit fee. Fences and block walls exceeding the exemption heights are permitted as building work priced from the Table 1 valuation brackets, plus 85 percent plan review where drawings are required, the permit issuance fee, the 5 percent Permit Center Improvement surcharge, the 0.24 percent General Plan Maintenance fee, and the state SMIP and SB 1473 surcharges. Low-valuation wall permits routinely bottom out at the minimum, which is one half hour of inspection time at $147.00 per hour. Fees revised July 18, 2025. SUPERSESSION CHECK 2026-09-10: the cited July 18, 2025 edition still returns HTTP 200 but has been superseded by "Fees Charged Developers, Fees Revised July 18, 2026" (Effective July 18, 2026), at https://www.oxnard.gov/wp-content/uploads/b100-fees-charged-to-dev-7-18-2026.pdf. Every building-permit figure recorded here was re-read in the 2026 edition and is UNCHANGED; the only differences between the two editions are the development impact fees (traffic and park), which are not stored here and which decreased slightly. Provenance repointed to the 2026 edition.
Source: published fee schedule · Verified 11/6/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Governing bracket, valuation $3,001 to $37,500 $97.88 plus 1.240% of valuation over $3,000 | see rule |
Governing bracket, valuation $751 to $3,000 $31.50 plus 2.95% of valuation over $750 | see rule |
○Permit issuance fee Flat fee $45.00 | $45.00 |
SB 1473 green building standards fee $4.00 per $100,000 valuation, $1.00 minimum | see rule |
How this jurisdiction calculates the fee
Oxnard publishes no flat reroof permit fee. The reroof is priced from the same valuation-based Table 1 building permit schedule using the roofing contract value, then layered with the standard add-ons: permit issuance fee, the 5 percent Permit Center Improvement surcharge, the 0.24 percent General Plan Maintenance fee, SMIP at $13.00 per $100,000 residential valuation, and the SB 1473 fee of $4.00 per $100,000 with a $1.00 minimum. Single-family reroofs qualify for Oxnard's Express permit path, which avoids a plan check, so the 85 percent building plan review fee generally does not apply. Fees revised July 18, 2025. SUPERSESSION CHECK 2026-09-10: the cited July 18, 2025 edition still returns HTTP 200 but has been superseded by "Fees Charged Developers, Fees Revised July 18, 2026" (Effective July 18, 2026), at https://www.oxnard.gov/wp-content/uploads/b100-fees-charged-to-dev-7-18-2026.pdf. Every building-permit figure recorded here was re-read in the 2026 edition and is UNCHANGED; the only differences between the two editions are the development impact fees (traffic and park), which are not stored here and which decreased slightly. Provenance repointed to the 2026 edition.
Source: published fee schedule · Verified 11/6/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Governing bracket, valuation $3,001 to $37,500 $97.88 plus 1.240% of valuation over $3,000 | see rule |
Governing bracket, valuation $37,501 to $75,000 $525.68 plus 0.880% of valuation over $37,500 | see rule |
Building plan review add-on · add-on 85% of the building permit fee — select the permit fee line above to calculate | see rule |
○Additional plan review hourly rate Flat fee $212.00 | $212.00 |
How this jurisdiction calculates the fee
No dedicated retaining wall fee is published. The wall is permitted as building work using the Table 1 valuation brackets, plus building plan review at 85 percent of the permit fee (engineered retaining walls essentially always trigger plan review), the permit issuance fee, the 5 percent Permit Center Improvement surcharge, the 0.24 percent General Plan Maintenance fee, and the state SMIP and SB 1473 surcharges. Additional plan review beyond the three included submittals runs $212.00 per hour with a half-hour minimum. Fees revised July 18, 2026. SUPERSESSION CHECK 2026-09-10: the July 18, 2025 edition still returns HTTP 200 but has been superseded by "Fees Charged Developers, Fees Revised July 18, 2026" (Effective July 18, 2026). Every figure recorded here was re-read in the 2026 edition and is UNCHANGED; the only differences between editions are the development impact fees, which are not stored here. Provenance repointed to the 2026 edition.
Source: published fee schedule · Verified 11/6/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Governing bracket, valuation $3,001 to $37,500 $97.88 plus 1.240% of valuation over $3,000 | see rule |
Governing bracket, valuation $37,501 to $75,000 $525.68 plus 0.880% of valuation over $37,500 | see rule |
Building plan review add-on · add-on 85% of the building permit fee — select the permit fee line above to calculate | see rule |
○Permit issuance fee Flat fee $45.00 | $45.00 |
How this jurisdiction calculates the fee
There is no dedicated shed permit fee in the Oxnard schedule. A shed over 120 square feet is permitted as a building using the Table 1 valuation brackets plus 85 percent plan review, the permit issuance fee, the 5 percent Permit Center Improvement surcharge, the 0.24 percent General Plan Maintenance fee and the state SMIP and SB 1473 surcharges. Minimum total permit fee equals one half hour of inspection time at the $147.00 hourly rate. Fees revised July 18, 2026. SUPERSESSION CHECK 2026-09-10: the July 18, 2025 edition still returns HTTP 200 but has been superseded by "Fees Charged Developers, Fees Revised July 18, 2026" (Effective July 18, 2026). Every figure recorded here was re-read in the 2026 edition and is UNCHANGED; the only differences between editions are the development impact fees, which are not stored here. Provenance repointed to the 2026 edition.
Source: published fee schedule · Verified 11/6/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Water heater (Table 4, plumbing) Flat fee $16.01 | $16.01 |
○Each plumbing fixture Flat fee $12.39 | $12.39 |
○Permit issuance fee Flat fee $45.00 | $45.00 |
○Inspection hourly rate (sets the minimum fee) Flat fee $147.00 | $147.00 |
Plumbing plan review when required · add-on 60% of the total permit fee — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Oxnard charges a flat per-appliance plumbing fee for a water heater, taken from Table 4 of the Community Development fee schedule, rather than a valuation calculation. That per-unit fee is added to the flat permit issuance fee, and the total is subject to the 5 percent Permit Center Improvement surcharge and the SB 1473 state green building fee ($1.00 minimum). Because the individual appliance fee is small, a standalone water heater permit is governed by the schedule's minimum: the total permit fee cannot be less than one half hour of inspection time, and the inspection rate is $147.00 per hour. Plumbing plan review, when required, is 60 percent of the total permit fee. Fees revised July 18, 2026. SUPERSESSION CHECK 2026-09-10: the July 18, 2025 edition still returns HTTP 200 but has been superseded by "Fees Charged Developers, Fees Revised July 18, 2026" (Effective July 18, 2026). Every figure recorded here was re-read in the 2026 edition and is UNCHANGED; the only differences between editions are the development impact fees, which are not stored here. Provenance repointed to the 2026 edition.
Source: published fee schedule · Verified 11/6/2026
See the full write-up: Oxnard building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.