B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Riverside County, California Building Permit Cost Calculator

Estimates permit cost in Riverside County from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Single family detached dwelling (deposit)
Flat fee $6,472.45
$6,472.45
○Additional dwelling unit / ADU (deposit)
Flat fee $6,472.45
$6,472.45
○Single family addition (deposit)
Flat fee $3,601.37
$3,601.37
○Commercial new building (deposit)
Flat fee $13,984.84
$13,984.84
○Industrial new building (deposit)
Flat fee $19,554.83
$19,554.83
○Residential pool (fixed)
Flat fee $999.30
$999.30
How this jurisdiction calculates the fee

Riverside County Building and Safety uses a fixed-fee-plus-deposit schedule rather than a pure valuation table. Each permit type in form 284-035 is marked either Fixed, meaning the published number is what you pay, or Deposit, meaning the published number is an initial payment against which actual plan check and inspection time is billed and reconciled at issuance. New dwellings, additions, accessory buildings and grading are deposit items; small trade and miscellaneous permits are fixed. The schedule states that additional surcharges and mandated fees apply on top based on permit type, specifically naming S.M.I. (strong motion instrumentation), a processing fee, a microfilm fee, an LMS technology surcharge and a green building fee. The version referenced here is form 284-035, effective July 22, 2026.

Source: published fee schedule · Verified 9/15/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Deck, County standard (fixed)
Flat fee $586.60
$586.60
○Patio cover, solid, County standard (fixed)
Flat fee $586.60
$586.60
○Single family addition (deposit, for engineered work)
Flat fee $3,601.37
$3,601.37
How this jurisdiction calculates the fee

Riverside County gives decks built to a County standard detail a fixed permit fee, the same amount charged for a solid patio cover built to County standard. Because it is a fixed fee rather than a deposit, the amount published is what you pay for the base permit, with the County's stated surcharges (strong motion, processing, microfilm, LMS technology and green building fees) added on top at issuance. A custom or engineered deck outside the standard details moves into deposit-based plan check. Form 284-035, effective July 22, 2026.

Source: published fee schedule · Verified 9/15/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Residential electrical permit (fixed)
Flat fee $448.20
$448.20
○Residential plumbing permit (fixed)
Flat fee $274.30
$274.30
○Commercial solar, 0 to 50 kW (maximum)
Flat fee $1,000.00
$1,000.00
How this jurisdiction calculates the fee

Riverside County charges a residential electrical permit as a single fixed fee rather than counting outlets, fixtures or devices, which makes it simple but relatively expensive for a small job compared with per-device counties. The published amount is the base permit; the County's stated surcharges (strong motion instrumentation, processing, microfilm, LMS technology and green building fees) are added at issuance based on permit type. Solar photovoltaic is handled separately, with commercial systems from 0 to 50 kW capped at a maximum fee. Form 284-035, effective July 22, 2026.

Source: published fee schedule · Verified 9/15/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Fence 7 ft or less in height
Flat fee $0.00
$0.00
○Fence over 7 ft (fixed)
Flat fee $635.40
$635.40
○Retaining wall, County standard (deposit), if the wall also retains soil
Flat fee $473.30
$473.30
How this jurisdiction calculates the fee

Riverside County charges a fence over 7 feet a single fixed permit fee rather than valuing the work, so the cost is the same regardless of fence length. Standard County surcharges (strong motion, processing, microfilm, LMS technology and green building fees) are added at issuance. A masonry wall that retains soil is charged instead under the retaining wall line, which is deposit based. Form 284-035, effective July 22, 2026.

Source: published fee schedule · Verified 11/6/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Reroof (fixed)
Flat fee $335.50
$335.50
○Roof work under 25% of existing roof area, once in 12 months
Flat fee $0.00
$0.00
○Residential plumbing permit (fixed), for comparison
Flat fee $274.30
$274.30
How this jurisdiction calculates the fee

Riverside County charges reroofing a single fixed permit fee, so the amount does not scale with roof area or valuation. It is one of the lower fixed fees in the schedule. The County's standard surcharges (strong motion instrumentation, processing, microfilm, LMS technology and green building fees) are added on top at issuance based on permit type. Form 284-035, effective July 22, 2026.

Source: published fee schedule · Verified 9/15/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Block wall 3 ft or less from grade with no surcharge
Flat fee $0.00
$0.00
○Retaining wall, County standard (deposit)
Flat fee $473.30
$473.30
○Grading, single family new dwelling (deposit), if earth is moved
Flat fee $2,554.77
$2,554.77
How this jurisdiction calculates the fee

Retaining walls built to a County standard detail are charged on a deposit basis, meaning the published amount is an initial payment against actual plan check and inspection time, reconciled at issuance. Engineered walls outside the standard details go through full plan check and can exceed the deposit. Grading associated with the wall is permitted and charged separately, and the County's standard surcharges (strong motion, processing, microfilm, LMS technology, green building) are added on top. Form 284-035, effective July 22, 2026.

Source: published fee schedule · Verified 9/15/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Shed 120 sq ft or less with no utilities
Flat fee $0.00
$0.00
○Accessory building, 1,000 sq ft (deposit)
Flat fee $1,628.78
$1,628.78
○Single family addition (deposit), for comparison
Flat fee $3,601.37
$3,601.37
How this jurisdiction calculates the fee

Riverside County prices accessory buildings on a deposit basis, with the published schedule keying the deposit to structure size; the schedule lists a deposit amount for a 1,000-square-foot accessory building. Because it is a deposit rather than a fixed fee, actual plan check and inspection time is billed against it and reconciled at issuance, so the final cost can differ from the published number. Standard County surcharges are added on top. Form 284-035, effective July 22, 2026.

Source: published fee schedule · Verified 11/4/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Residential plumbing permit (fixed) - governs water heater replacement
Flat fee $274.30
$274.30
○Residential electrical permit (fixed), if a circuit is added for tankless
Flat fee $448.20
$448.20
How this jurisdiction calculates the fee

The Riverside County fee schedule does not carry a dedicated water heater line item. A water heater replacement is permitted under the residential plumbing permit, which is a fixed fee covering the plumbing scope rather than a per-fixture charge. Because there is no specific water heater amount published, the governing figure is the residential plumbing permit fee, with the County's standard surcharges (strong motion, processing, microfilm, LMS technology and green building fees) added at issuance. A tank-to-tankless conversion that adds a dedicated circuit or upsizes the gas line will typically also need the residential electrical permit. Form 284-035, effective July 22, 2026.

Source: published fee schedule · Verified 9/15/2026

See the full write-up: Riverside County building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.