San Diego County, California Building Permit Cost Calculator
Estimates permit cost in San Diego County from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Valuation $1 to $50,000 $374.00 for the first $10,000 plus $1.00 per additional $1,000 | see rule |
Valuation $50,001 to $100,000 $414.50 for the first $50,000 plus $4.50 per additional $1,000 | see rule |
Valuation $100,001 to $500,000 $639.50 for the first $100,000 plus $3.50 per additional $1,000 | see rule |
Valuation $500,001 to $1,000,000 $2,039.50 for the first $500,000 plus $3.00 per additional $1,000 | see rule |
Valuation over $1,000,000 $3,539.50 for the first $1,000,000 plus $2.00 per additional $1,000 | see rule |
How this jurisdiction calculates the fee
San Diego County charges building permits from a stepped valuation table set out in the Building Construction Permit Fees schedule (form PDS 613). Each valuation band has a base amount plus a marginal rate per additional $1,000 of valuation, and the marginal rate steps down as valuation rises, so large projects pay a lower rate at the margin. A plan review fee is charged separately from the permit fee, and many project types are listed with their own paired plan review and permit amounts rather than being valued. The fee schedule is adopted by the Board of Supervisors and the version referenced here is PDS 613 revision 07/06/2026, effective 07/10/2026. State-mandated items such as the strong motion (SMIP) surcharge and the SB 1473 building standards administration fee are collected in addition to these amounts but are handled in the schedule notes rather than as table lines.
Source: published fee schedule · Verified 9/15/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Miscellaneous over-the-counter permit (patio, carport, canopy, stairs and similar), permit fee Flat fee $521.00 | $521.00 |
○Miscellaneous over-the-counter permit, plan review fee Flat fee $405.00 | $405.00 |
Valuation $1 to $50,000 (if valued as building work) $374.00 for the first $10,000 plus $1.00 per additional $1,000 | see rule |
How this jurisdiction calculates the fee
PDS 613 does not carry a standalone deck line. A permit-required deck is charged either from the valuation table for the building permit and plan review, or, where it is counter-issued alongside a patio or minor structure, at the miscellaneous over-the-counter rate that groups patios, carports, canopies, fences, re-roofs, stairs and similar work into one paired plan review plus permit amount. Which path applies depends on whether the deck needs engineering. Fee schedule PDS 613 revision 07/06/2026, effective 07/10/2026.
Source: published fee schedule · Verified 9/15/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Electrical only permit Flat fee $392.00 | $392.00 |
○Plumbing only permit Flat fee $392.00 | $392.00 |
○Mechanical only permit Flat fee $392.00 | $392.00 |
○Photovoltaic roof mount, applied online Flat fee $292.00 | $292.00 |
How this jurisdiction calculates the fee
San Diego County charges a single flat fee for a standalone electrical permit rather than counting outlets and fixtures the way Los Angeles County does. The same flat amount applies to plumbing-only and mechanical-only permits, which makes the schedule simple to read. Where the electrical work is part of a larger construction project, the electrical scope is folded into the valuation-based building permit and this standalone fee does not apply. Solar photovoltaic roof-mount permits applied for online are charged at their own lower rate. Fee schedule PDS 613 revision 07/06/2026, effective 07/10/2026.
Source: published fee schedule · Verified 9/15/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Fence 6 ft or less (or open fence to 8 ft with top 2 ft barbed/razor wire) Flat fee $0.00 | $0.00 |
○Fence, miscellaneous over-the-counter permit fee Flat fee $521.00 | $521.00 |
○Fence, plan review fee Flat fee $405.00 | $405.00 |
○Retaining wall over-the-counter permit fee (if the wall also retains soil) Flat fee $691.00 | $691.00 |
How this jurisdiction calculates the fee
A fence needing a permit is charged as a miscellaneous over-the-counter permit in PDS 613, grouped with patios, carports, canopies, re-roofs and stairs, at a fixed plan review fee plus a fixed permit fee rather than by valuation. Engineered masonry walls or walls that also retain soil move to the retaining wall line, which is priced separately. Fee schedule PDS 613 revision 07/06/2026, effective 07/10/2026.
Source: published fee schedule · Verified 9/15/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Re-roof, miscellaneous over-the-counter permit fee Flat fee $521.00 | $521.00 |
○Re-roof, plan review fee Flat fee $405.00 | $405.00 |
○Photovoltaic roof mount, applied online Flat fee $292.00 | $292.00 |
How this jurisdiction calculates the fee
Re-roofs are handled as a miscellaneous over-the-counter permit in the PDS 613 schedule, grouped with minor single-family remodel or repair with no structural change, patios, carports, canopies, fences, stairs, radio towers and antennas. Rather than being valued, the work is charged a fixed plan review fee plus a fixed permit fee. That makes the price predictable regardless of the size of the roof, which is unusual among California counties. Fee schedule PDS 613 revision 07/06/2026, effective 07/10/2026.
Source: published fee schedule · Verified 9/15/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Wall retaining 3 ft or less of soil and 6 ft or less total height Flat fee $0.00 | $0.00 |
○Retaining wall, over-the-counter permit fee Flat fee $691.00 | $691.00 |
○Retaining wall, plan review fee Flat fee $329.00 | $329.00 |
Valuation $1 to $50,000 (if engineered and valued) $374.00 for the first $10,000 plus $1.00 per additional $1,000 | see rule |
How this jurisdiction calculates the fee
PDS 613 carries a dedicated retaining wall line issued over the counter, priced as a fixed plan review fee plus a fixed permit fee rather than by valuation. This is a distinct and higher permit amount than the general miscellaneous over-the-counter category, reflecting the structural review involved. Engineered walls that fall outside County standard details go to full plan review and are charged from the valuation table instead, and any associated grading is a separate permit. Fee schedule PDS 613 revision 07/06/2026, effective 07/10/2026.
Source: published fee schedule · Verified 11/5/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Shed 120 sq ft or less Flat fee $0.00 | $0.00 |
Valuation $1 to $50,000 $374.00 for the first $10,000 plus $1.00 per additional $1,000 | see rule |
○Miscellaneous over-the-counter permit fee (if counter-issued) Flat fee $521.00 | $521.00 |
○Miscellaneous over-the-counter plan review fee Flat fee $405.00 | $405.00 |
How this jurisdiction calculates the fee
PDS 613 has no dedicated shed or accessory building line. An exempt shed costs nothing. A shed over 120 square feet is priced as building construction from the stepped valuation table, producing a permit fee off the valuation bands plus a separate plan review fee; small-value projects therefore land at the bottom of the first band. Fee schedule PDS 613 revision 07/06/2026, effective 07/10/2026.
Source: published fee schedule · Verified 11/5/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Like-for-like replacement by a licensed CA plumbing contractor Flat fee $0.00 | $0.00 |
○Plumbing only permit (owner-installed or type change) Flat fee $392.00 | $392.00 |
○Electrical only permit (if a circuit is added for tankless) Flat fee $392.00 | $392.00 |
○Mechanical only permit Flat fee $392.00 | $392.00 |
How this jurisdiction calculates the fee
Where the exemption does not apply, a water heater is permitted as a standalone plumbing permit at the flat plumbing-only rate in PDS 613; there is no separate water heater line item in the schedule. A tank-to-tankless conversion that adds a dedicated electrical circuit or upsizes the gas line will typically need an electrical or mechanical permit as well, each at its own flat rate. Fee schedule PDS 613 revision 07/06/2026, effective 07/10/2026.
Source: published fee schedule · Verified 11/6/2026
See the full write-up: San Diego County building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.