San Francisco, California Building Permit Cost Calculator
Estimates permit cost in San Francisco from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Valuation $1 to $2,000 - plan review fee $181 for the first $500 plus $8.60 for each additional $100 or fraction thereof, to and including $2,000 | see rule |
Valuation $1 to $2,000 - permit issuance fee $206 for the first $500 plus $4 for each additional $100 or fraction thereof, to and including $2,000 | see rule |
Valuation $2,001 to $50,000 - plan review fee $310 for the first $2,000 plus $28.35 for each additional $1,000 or fraction thereof, to and including $50,000 | see rule |
Valuation $2,001 to $50,000 - permit issuance fee $266 for the first $2,000 plus $8.56 for each additional $1,000 or fraction thereof, to and including $50,000 | see rule |
Valuation $50,001 to $200,000 - plan review fee $1,617 for the first $50,000 plus $15.60 for each additional $1000 or fraction thereof, to and including $200,000 | see rule |
Valuation $50,001 to $200,000 - permit issuance fee $677 for the first $50,000 plus $4.83 for each additional $1000 or fraction thereof, to and including $200,000 | see rule |
○Valuation $200,001 to $500,000 - plan review fee $4,011.00 for the first $200,000.00, plus 50 x $13.31 for $50,000.00 over (rounded up per "or fraction thereof") = $4,676.50 | $4,676.50 |
○Valuation $200,001 to $500,000 - permit issuance fee $1,402.00 for the first $200,000.00, plus 50 x $4.21 for $50,000.00 over (rounded up per "or fraction thereof") = $1,612.50 | $1,612.50 |
○Valuation $500,001 to $1,000,000 - plan review fee $250,000.00 is within the first $500,000.00, so the base $8,003.00 applies | $8,003.00 |
○Valuation $500,001 to $1,000,000 - permit issuance fee $250,000.00 is within the first $500,000.00, so the base $2,666.00 applies | $2,666.00 |
○Valuation $1,000,001 to $5,000,000 - plan review fee $250,000.00 is within the first $1,000,000.00, so the base $12,950.00 applies | $12,950.00 |
○Valuation $1,000,001 to $5,000,000 - permit issuance fee $250,000.00 is within the first $1,000,000.00, so the base $4,481.00 applies | $4,481.00 |
○Valuation $5,000,001 to $50,000,000 - plan review fee $250,000.00 is within the first $5,000,000.00, so the base $44,171.00 applies | $44,171.00 |
○Valuation $5,000,001 to $50,000,000 - permit issuance fee $250,000.00 is within the first $5,000,000.00, so the base $16,211.00 applies | $16,211.00 |
○Valuation $50,000,001 to $100,000,000 - plan review fee $250,000.00 is within the first $50,000,000.00, so the base $161,876.00 applies | $161,876.00 |
○Valuation $50,000,001 to $100,000,000 - permit issuance fee $250,000.00 is within the first $50,000,000.00, so the base $86,181.00 applies | $86,181.00 |
○Valuation $100,000,001 to $200,000,000 - plan review fee $250,000.00 is within the first $100,000,000.00, so the base $331,339.00 applies | $331,339.00 |
○Valuation $100,000,001 to $200,000,000 - permit issuance fee $250,000.00 is within the first $100,000,000.00, so the base $173,272.00 applies | $173,272.00 |
○Valuation $200,000,001 and up - plan review fee $250,000.00 is within the first $200,000,000.00, so the base $644,458.00 applies | $644,458.00 |
○Valuation $200,000,001 and up - permit issuance fee $250,000.00 is within the first $200,000,000.00, so the base $455,407.00 applies | $455,407.00 |
○Surcharge on alteration permits for R3 (one/two-family dwelling) and E3 (licensed day care) buildings constructed prior to 1979, for interior lead safe work practices Flat fee $5.00 | $5.00 |
How this jurisdiction calculates the fee
The building permit fee is the plan review fee plus the permit issuance fee, each calculated from the total valuation of the project. These fees apply to all building permits issued on and after July 12, 2026. They do not include fees required by other departments such as Public Works, Planning, Fire or Public Health, and they do not include plumbing, electrical or mechanical permit fees unless stated in the other fee tables.
Source: published fee schedule · Verified 11/10/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
How this jurisdiction calculates the fee
Fees for an Over-the-Counter exterior residential permit run 3 to 4.5% of construction cost.
Source: published fee schedule · Verified 8/4/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Category 1, General Wiring, Residential Buildings up to 10,000 sq. ft. - Up to 10 outlets and/or devices (1 inspection) Flat fee $305.00 | $305.00 |
○Category 1 - 11 to 20 outlets and/or devices (up to 2 inspections) Flat fee $450.00 | $450.00 |
○Category 1 - Up to 40 outlets and/or devices, includes up to 200 Amp service upgrade (up to 3 inspections) Flat fee $580.00 | $580.00 |
○Category 1 - More than 40 outlets and/or devices (up to 4 inspections) Flat fee $740.00 | $740.00 |
○Category 1 - Buildings of 5,000 to 10,000 sq. ft. area (up to 5 inspections) Flat fee $1,289.00 | $1,289.00 |
○Category 2, General Wiring, Nonresidential Buildings & Residential Buildings over 10,000 sq. ft. - Up to 5 outlets and/or devices (up to 2 inspections) Flat fee $480.00 | $480.00 |
○Category 2 - Areas up to 2,500 sq. ft. (up to 4 inspections) Flat fee $915.00 | $915.00 |
○Category 3, Service Distribution and Utilization Equipment - 225 amps rating or less (includes 2 inspections) Flat fee $450.00 | $450.00 |
○Category 3 - 250 to 500 amps Flat fee $709.00 | $709.00 |
○Category 5, Miscellaneous - Solar Photovoltaic Systems, 10 KW rating or less Flat fee $320.00 | $320.00 |
○Category 5 - Solar Photovoltaic Systems, each additional 10 KW (up to 2 inspections) Flat fee $259.00 | $259.00 |
○Hourly permit issuance/inspection rate for installations not covered by the fee schedule - regular inspections Flat fee $519.00 | $519.00 |
○Hourly permit issuance/inspection rate - off-hours inspections Flat fee $555.00 | $555.00 |
○Re-inspection or additional inspection per Section 108A.8 Flat fee $259.00 | $259.00 |
How this jurisdiction calculates the fee
Electrical permit fees are flat category fees set in San Francisco Building Code Fee Schedule Table 1A-E, Electrical Permit Issuance and Inspection, and apply to all permits issued on and after July 12, 2026. The applicant itemizes the proposed scope of work and selects the applicable category and amount; a permit may draw on more than one category. Category 1 covers general wiring in residential buildings up to 10,000 square feet and is priced by the number of outlets and/or devices, with each step allowing a stated number of inspections; Category 2 covers general wiring in nonresidential buildings and residential buildings over 10,000 square feet and is priced by outlet count for small jobs and by floor area above that; Category 3 covers service distribution and utilization equipment by amperage or kVA rating; Category 4 covers fire warning and controlled devices; and Category 5 covers miscellaneous installations including solar photovoltaic systems, signs, security and data systems. For fee calculation, appliances and utilization equipment each count as one outlet or device in addition to receptacles, switches and light outlets. A separate permit is required for each structure, condominium unit, existing dwelling unit (except in R3 occupancies), common area, commercial office floor or individual tenant space. Installations not covered by the schedule are billed at hourly issuance/inspection rates.
Source: published fee schedule · Verified 11/5/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
How this jurisdiction calculates the fee
Fees for an Over-the-Counter exterior residential permit run 3 to 4.5% of construction cost.
Source: published fee schedule · Verified 8/4/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Single-family homes and duplexes $514 and up | see rule |
All other building types $714 and up | see rule |
How this jurisdiction calculates the fee
The City's Apply for a reroofing permit page sets the cost at $514 and up for single-family homes and duplexes and $714 and up for all other building types, while Fee Schedule Table 1A-G, Inspections, Surveys and Reports, sets the re-roofing permit fee at $320 for single-family homes and duplexes and $556 for all others. Additional fees apply depending on the project, and the permit fee for street space is included in the reroofing permit fee.
Source: published fee schedule · Verified 11/10/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Shed within the exemption (120 sq. ft. or less, 10 feet or less in height, one per lot or yard, non-habitable storage or playhouse use) No building permit and no building permit fee | see rule |
Building permit exceeding the exemption, total valuation $1 to $2,000 - plan review fee $181 for the first $500 plus $8.60 for each additional $100 or fraction thereof, to and including $2,000 | see rule |
Building permit exceeding the exemption, total valuation $1 to $2,000 - permit issuance fee $206 for the first $500 plus $4 for each additional $100 or fraction thereof, to and including $2,000 | see rule |
Building permit exceeding the exemption, total valuation $2,001 to $50,000 - plan review fee $310 for the first $2,000 plus $28.35 for each additional $1,000 or fraction thereof, to and including $50,000 | see rule |
Building permit exceeding the exemption, total valuation $2,001 to $50,000 - permit issuance fee $266 for the first $2,000 plus $8.56 for each additional $1,000 or fraction thereof, to and including $50,000 | see rule |
How this jurisdiction calculates the fee
There is no permit fee for a shed that meets San Francisco's exemption: a detached, single-story storage shed, playhouse or comparable accessory structure of 120 square feet or less and no more than 10 feet high, one per lot or yard, needs no building permit and therefore attracts no building permit fee. A shed that exceeds those limits, or that is used for anything beyond non-habitable storage or a children's playhouse, requires a building permit with plans, which is priced from the general building permit fee table rather than from any shed-specific line: the building permit fee is the plan review fee plus the permit issuance fee, each calculated from the total valuation of the project on a sliding scale. Electrical lights and outlets in an otherwise exempt shed require a separate electrical permit, priced from the electrical permit table.
Source: published fee schedule · Verified 11/5/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Boiler Maintenance Program - Permit to operate or renew (certificate issued), Online; renewal required for water heaters when alteration or replacement permits are issued Flat fee $145.00 | $145.00 |
○Boiler Maintenance Program - Permit to operate or renew (certificate issued), In-House Flat fee $221.00 | $221.00 |
○Category 1P - Single Residential Unit: water service, sewer replacement, single plumbing fixture installation, shower pan installation, or a single kitchen or bathroom remodel (maximum two inspections) Flat fee $290.00 | $290.00 |
○Category 1M - Single Residential Unit: mechanical gas appliance (furnace, hydronic heat, heat pump) (maximum two inspections) Flat fee $290.00 | $290.00 |
○Category 2PA - Plumbing installation for residential construction with 6 or less dwelling units or guest rooms; without underground plumbing installation (maximum three inspections) Flat fee $549.00 | $549.00 |
○Category 8 - New Boiler installations over 200k Btu Flat fee $580.00 | $580.00 |
○Category 11P/M - Miscellaneous Flat fee $320.00 | $320.00 |
○Hourly issuance/inspection rate for installations not covered by the fee categories - regular inspections Flat fee $519.00 | $519.00 |
○Hourly issuance/inspection rate - off-hour inspections Flat fee $555.00 | $555.00 |
○Re-inspection or additional inspection per Section 108A.8 Flat fee $259.00 | $259.00 |
How this jurisdiction calculates the fee
Plumbing and mechanical permit fees are flat category fees set in San Francisco Building Code Fee Schedule Table 1A-C, Plumbing/Mechanical Issuance and Inspection Fees, and apply to all permits issued on and after July 12, 2026. The applicant itemizes the scope of work and selects the applicable category; a permit may include more than one category and each is charged separately. The table prices categories by dwelling-unit count and by type of installation rather than by individual appliance, and it does not name water heaters in any of its permit categories, so a water heater replacement is charged under whichever category matches the scope of work, with installations not covered by the listed categories billed at the hourly issuance/inspection rate. The table's Boiler Maintenance Program separately requires a permit to operate, or renewal of one, for water heaters when alteration or replacement permits are issued.
Source: published fee schedule · Verified 11/5/2026
See the full write-up: San Francisco building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.