Home / Calculators / Building Permit Fee Calculator

Durham, North Carolina Building Permit Cost Calculator

Estimates permit cost in Durham from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

New residential dwelling, up to 1200 sq. ft. gross area
$146.00 building permit fee plus $146.00 plan review fee
see rule
New residential dwelling, 1201 to 1800 sq. ft.
$325.00 building permit fee plus $146.00 plan review fee
see rule
New residential dwelling, 1801 to 2400 sq. ft.
$400.00 building permit fee plus $146.00 plan review fee
see rule
New residential dwelling, 2401 to 3000 sq. ft.
$456.00 building permit fee plus $146.00 plan review fee
see rule
New residential dwelling, 3001 to 3600 sq. ft.
$537.00 building permit fee plus $146.00 plan review fee
see rule
New residential dwelling, 3601 to 4200 sq. ft.
$650.00 building permit fee plus $146.00 plan review fee
see rule
New residential dwelling, 4201 to 5000 sq. ft.
$740.00 building permit fee plus $146.00 plan review fee
see rule
New residential dwelling, 5001 sq. ft. and over
$810.00 building permit fee plus $146.00 plan review fee
see rule
New multi-family residential building, first unit
$300.00 building permit fee plus $450.00 plan review fee
see rule
New multi-family residential building, each additional unit per building
$150.00, no additional plan review fee
see rule
Residential addition, 0 to $10,000.00, no footing (add $50.00 if footing required)
$125.00 building permit fee plus $125.00 plan review fee
see rule
Residential addition, $10,001.00 and over, no footing (add $50.00 if footing required)
$250.00 building permit fee plus $125.00 plan review fee
see rule
Interior renovation, 0 to $10,000.00
$125.00 building permit fee plus $125.00 plan review fee
see rule
Interior renovation, $10,001.00 and over
$250.00 building permit fee plus $125.00 plan review fee
see rule
Nonresidential, 0 to $5000.00
$104.00 building permit fee plus $104.00 plan review fee
see rule
Nonresidential, $5001.00 to $50,000.00
$104.00 plus $7.80 per thousand or fraction thereof over $5,000.00, plus $104.00 plan review fee
see rule
Nonresidential, $50,001 to $100,000.00
$456.00 plus $6.60 per thousand or fraction thereof over $50,000.00, plus $230.00 plan review fee
see rule
Nonresidential, $100,001.00 to $500,000.00
$786.00 plus $4.32 per thousand or fraction thereof over $100,000.00, plus $400.00 plan review fee
see rule
Nonresidential, over $500,000.00
$2513.00 plus $1.25 per thousand or fraction thereof over $500,000.00, plus $1300.00 plan review fee
see rule
○Homeowner's Recovery Fund
Flat fee $10.00
$10.00
○Change of Occupancy Permit where no building permit is otherwise required and no construction is necessary
Flat fee $50.00
$50.00
○Reinspection, not ready for inspection
Flat fee $100.00
$100.00
○Second reinspection
Flat fee $100.00
$100.00
○Third reinspection
Flat fee $200.00
$200.00
○Fourth reinspection
Flat fee $300.00
$300.00
Work begun without a permit
Double Fee
see rule
Voiding of permits · add-on
15% of permit cost (no maximum) — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

New residential dwellings are charged a building permit fee tiered by gross floor area together with a flat plan review fee, multifamily buildings are charged per unit, and nonresidential work is charged on construction cost. Residential additions and interior renovations are charged by project cost, with an extra charge where a footing is required. The plan review fee must be paid at the time of plan submittal. The schedule took effect July 1, 2018 and includes the technology surcharge.

Source: published fee schedule · Verified 10/1/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Residential decks (single and two-family)
Flat fee $100.00
$100.00
Residential addition, 0 to $10,000.00, no footing (add $50.00 if footing required)
$125.00 building permit fee plus $125.00 plan review fee
see rule
Residential addition, $10,001.00 and over, no footing (add $50.00 if footing required)
$250.00 building permit fee plus $125.00 plan review fee
see rule
○Re-Stamp Plans or replacement copy of Digital Plans
Flat fee $20.00
$20.00
○Reinspection, not ready for inspection
Flat fee $100.00
$100.00
○Second reinspection
Flat fee $100.00
$100.00
○Third reinspection
Flat fee $200.00
$200.00
○Fourth reinspection
Flat fee $300.00
$300.00
Work begun without a permit
Double Fee
see rule
Voiding of permits · add-on
15% of permit cost (no maximum) — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Schedule F of the Building Permit Fee Schedule charges a flat miscellaneous building permit fee for a residential deck serving a single-family or two-family dwelling. A deck built as part of an addition is charged instead under the addition schedule by project cost. The schedule took effect July 1, 2018 and includes the technology surcharge.

Source: published fee schedule · Verified 10/1/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○New residential dwelling, 100 amp to 200 amp service
Flat fee $156.00
$156.00
○New residential dwelling, 400 amp service
Flat fee $187.00
$187.00
○Outlets on general-purpose branch circuits, 1 to 10 outlets
Flat fee $21.00
$21.00
Outlets on general-purpose branch circuits, each additional outlet
$.83
see rule
○Fixtures, 1 to 10 fixtures
Flat fee $21.00
$21.00
Fixtures, each additional fixture
$.83
see rule
○Electric water heaters or boilers, branch circuit
Flat fee $10.90
$10.90
○Dryers and dishwashers, branch circuit
Flat fee $10.90
$10.90
○Service equipment, up to 100 amperes
Flat fee $34.00
$34.00
○Service equipment, each additional 100 amperes or fraction thereof
Flat fee $6.97
$6.97
○Feeders, each feeder up to 100 amps
Flat fee $10.90
$10.90
○Transformers, dry or liquid type, up to 45 KVA
Flat fee $33.00
$33.00
○Solar panel inspections, residential
Flat fee $100.00
$100.00
○Temporary Service Connection, residential
Flat fee $100.00
$100.00
○Minimum electrical permit fee
Flat fee $65.00
$65.00
○Minimum fee for any permit requiring a rough-in inspection, residential
Flat fee $100.00
$100.00
○Minimum fee for any permit requiring a rough-in inspection, commercial
Flat fee $150.00
$150.00
○Surcharge added for each plumbing, electrical or mechanical application submitted on paper rather than electronically
Flat fee $5.00
$5.00
○Reinspection, not ready for inspection
Flat fee $100.00
$100.00
Work begun without a permit
Double Fee
see rule
Voiding of permits · add-on
15% of permit cost (no maximum) — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

The Electrical Permit Fee Schedule charges new dwellings a flat fee by service size and charges other work by counts of outlets, fixtures, motors, branch circuits, feeders and service equipment, subject to a minimum permit fee. A surcharge is added for each electrical application submitted on paper rather than electronically. The schedule took effect July 1, 2018 and includes the technology surcharge.

Source: published fee schedule · Verified 9/30/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Fence or wall meeting Unified Development Ordinance standards, outside a designated flood plain
No building permit required and no fee
see rule
Commercial fence or wall under 6 feet that is not a swimming pool guard and does not affect fire department access
No building permit required and no fee
see rule
Fence or wall on property located in a designated flood plain
Permit required; no fence-specific fee published
see rule
Fence or wall used as a pool barrier on a parcel with a single family dwelling
Permit required; no fence-specific fee published
see rule
How this jurisdiction calculates the fee

Durham publishes no fence permit fee, because no building permit is required to build a fence or wall within the Durham city or county limits unless the property is located in a designated flood plain. Height, location and style standards in the Unified Development Ordinance still apply, with a maximum of 8 feet in a side or rear yard and 4 feet in a front yard, and a variance from the Board of Adjustment is required for a fence taller than allowed by right. A permit is required where the fence or wall is used as a pool barrier on a parcel with a single family dwelling. A commercial fence or wall under 6 feet requires no building permit at all unless it is a swimming pool guard or affects fire department access. | 2026-09-30 (lane B run 1822) PARTIAL READ, NOTHING CHANGED. The cited source_url durhamnc.gov/303/Fences-Walls could NOT be read this pass: it returns HTTP 429 to curl and serves a Cloudflare "Performing security verification" interstitial to headless Chromium (Ray ID a43219e89853d6bc), which this lane does not solve. That is a block, not a finding, and the same host read cleanly for the Durham electrical row in this same batch. This row stores permit thresholds in words and no dollar amounts, so nothing on it was left unverified by the block; the fee document it points at, DocumentCenter/View/2706 Building-Permits, was fetched and read in full and is still footed "Effective 7/1/18 - Includes Technology Surcharge". The eight-year age of the Durham schedule remains the open human question run 1754 recorded and run 1799 confirmed; it is not new.

Source: published fee schedule · Verified 9/30/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Residential Reroofing (addition)
Flat fee $75.00
$75.00
○Commercial Roofing/Reroofing, $0-$20,000
Flat fee $100.00
$100.00
○Commercial Roofing/Reroofing, over $20,000
Flat fee $150.00
$150.00
How this jurisdiction calculates the fee

Residential reroofing that adds roofing is charged a flat miscellaneous permit fee; commercial roofing and reroofing is charged by project cost. | 2026-09-24 (lane B run 1728) VERIFIED, SUCCESSOR HUNT INCONCLUSIVE - RE-CHECK. All three stored figures were confirmed present verbatim in the cited document today ("Residential Reroofing (addition)...$75.00"; "Commercial Roofing/Reroofing $0-$20,000...$100.00; Over $20,000...$150.00"). THE DOCUMENT IS OLD: it is headed Schedule A and states "Effective 7/1/18 - Includes Technology Surcharge". A successor could NOT be ruled out this pass because every durhamnc.gov HTML page (302/Fee-Schedules, 635/Permits-and-Fees, 1119/Building-Permits) returns a Cloudflare 403 to direct clients and is disallowed by robots.txt to the WebFetch fallback, while the DocumentCenter PDF path itself serves normally. A Durham "Development Services Fee and Payments Menu Effective July 2025" exists at DocumentCenter/View/34642 and was NOT examined. AN EIGHT-YEAR-OLD FEE SCHEDULE IS NOW THE OLDEST-DATED SOURCE IN THIS ROTATION AND IS A HIGH-PROBABILITY SUPERSESSION. Next pass: read DocumentCenter/View/34642 and reconcile.

Source: published fee schedule · Verified 9/24/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Public Works Commercial or Retaining Wall Building Permit Plan Review (includes the 4% technology surcharge)
Flat fee $546.00
$546.00
○Public Works Residential Building Permit Plan Review (includes the 4% technology surcharge)
Flat fee $436.80
$436.80
Building and Safety building permit fee for a retaining wall
No separate line item published in the Building Permit Fee Schedule
see rule
○Reinspection, not ready for inspection
Flat fee $100.00
$100.00
Work begun without a permit
Double Fee
see rule
Voiding of permits · add-on
15% of permit cost (no maximum) — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

A building permit is required for a retaining wall in Durham even though no building permit is required for an ordinary fence or wall. The Building Permit Fee Schedule publishes no separate line item for retaining walls, so no flat retaining wall permit fee exists and the Building and Safety fee is derived from the general schedules by project cost. A separate Public Works plan review fee for a retaining wall building permit is published in the City of Durham Reference Guide for Development, effective July 1, 2020 and including the 4 percent technology surcharge. Retaining wall building permits are reviewed and approved by Engineering only after the construction drawings for the project have been approved.

Source: published fee schedule · Verified 10/1/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Accessory building, no footing
$50.00 building permit fee plus $50.00 plan review fee
see rule
Accessory building, footing
$100.00 building permit fee plus $50.00 plan review fee
see rule
Plans review re-review, first re-review
No charge
see rule
○Plans review re-review, second re-review
Flat fee $200.00
$200.00
○Plans review re-review, each re-review thereafter
Flat fee $300.00
$300.00
○Reinspection, not ready for inspection
Flat fee $100.00
$100.00
○Second reinspection
Flat fee $100.00
$100.00
○Third reinspection
Flat fee $200.00
$200.00
○Fourth reinspection
Flat fee $300.00
$300.00
Work begun without a permit
Double Fee
see rule
Voiding of permits · add-on
15% of permit cost (no maximum) — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Schedule C of the Building Permit Fee Schedule charges a flat building permit fee and a flat plan review fee for an accessory building, with the permit fee depending on whether a footing is required. A building permit is required to place or build any accessory structure such as a storage building, detached carport, garage or pool house, and two copies of a site plan must be provided. Where the building is greater than 12 feet in length on a side, structural drawings and an application with a plot plan must also be submitted. The schedule took effect July 1, 2018 and includes the technology surcharge.

Source: published fee schedule · Verified 10/1/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Fixture replacement, no change to rough-in, 1-4 fixtures
Flat fee $65.00
$65.00
○Fixture replacement, no change to rough-in, 5 fixtures and over, per fixture
Flat fee $6.86
$6.86
○Electric water heater (permit required)
Flat fee $65.00
$65.00
○Additions, residential and nonresidential, building sewer and water
Flat fee $65.00
$65.00
○Additions, residential and nonresidential, 1-7 fixtures
Flat fee $94.00
$94.00
○Additions, residential and nonresidential, 8-15 fixtures
Flat fee $119.00
$119.00
○Additions, residential and nonresidential, over 15 fixtures, per fixture
Flat fee $7.90
$7.90
○New residential construction, one and two family and townhouse, all dwellings
Flat fee $170.00
$170.00
○Work not listed but having a water or sewer connection
Flat fee $65.00
$65.00
○Surcharge added for each plumbing, electrical or mechanical application submitted on paper rather than electronically
Flat fee $5.00
$5.00
○Reinspection, not ready for inspection
Flat fee $100.00
$100.00
○Reinspection, 4 or more code items found
Flat fee $100.00
$100.00
○Second reinspection
Flat fee $100.00
$100.00
○Third reinspection
Flat fee $200.00
$200.00
○Fourth reinspection
Flat fee $300.00
$300.00
Work begun without a permit
Double Fee
see rule
Voiding of permits · add-on
15% of permit cost (no maximum) — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Fixture replacement with no change to the rough-in is charged by fixture count, with the electric water heater listed at a flat fee; other plumbing work is charged by project category and fixture count. | 2026-09-25 (lane B run 1754) HELD, CITED DOCUMENTS NOT READABLE, BUT THE CARRIED-FORWARD SUCCESSOR QUESTION FROM RUN 1728 IS ANSWERED. durhamnc.gov's DocumentCenter returned HTTP 403 to curl and to headless Chromium and HTTP 429 to the WebFetch fallback for both /View/1010/Plumbing-Permits-PDF and /View/2706/Building-Permits-PDF, so no figure was verified and none altered. RUN 1728 FLAGGED "DocumentCenter/View/34642 - read it and reconcile" AS THE HIGHEST-PRIORITY ITEM IN THE ROTATION. IT WAS READ TODAY AND IT IS NOT THE SUCCESSOR. /View/34642 is the "Development Services Fees and Payment Menu", effective July 1, 2026, a PLANNING fee menu; it carries no plumbing fee lines at all and states explicitly that "Fees for building permits, electrical, mechanical, plumbing, and multi-trade permits are on the Inspections Department web page." So the 2018-dated Schedule A that these rows rest on is still un-superseded as far as any reachable Durham document shows, and that specific next-pass instruction is now closed. WHAT REMAINS: the Durham Inspections Department fee page itself has never been read - durhamnc.gov HTML pages 403 every client and are disallowed to WebFetch by robots.txt. HUMAN ACTION: a person with a browser should open the Durham Inspections Department fee page and reconcile it against the 2018 Schedule A. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98), AND THIS IS THE FIRST PASS IN WHICH THIS LANE HAS ACTUALLY READ THE DURHAM DOCUMENTS. durhamnc.gov's DocumentCenter returned HTTP 200 to a plain client for both /View/1010 (Plumbing Permits) and /View/2706 (Building Permits), where it 403'd curl and headless Chromium and 429'd WebFetch in runs 1728 and 1754. Both were read in full with pdftotext -layout. ALL FIFTEEN STORED FIGURES RE-READ VERBATIM, including the $6.86 per-fixture rate for replacements of five fixtures and over, plus the double-fee rule for work begun without a permit and the 15 percent voiding charge. NO SUPERSESSION, AND THE AGE IS CONFIRMED NOT REPAIRED: both documents are still footed "Effective 7/1/18—Includes Technology Surcharge", eight years old, and run 1754 already closed the successor hunt negatively by reading /View/34642 and finding it to be the Development Services planning fee menu, which carries no plumbing line and states that trade permit fees live on the Inspections Department page. HUMAN ACTION UNCHANGED: ask Durham whether the 2018 Schedule A is still in force, or find the schedule that replaced it.

Source: published fee schedule · Verified 9/28/2026

See the full write-up: Durham building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.