Home / Calculators / Building Permit Fee Calculator

Greensboro, North Carolina Building Permit Cost Calculator

Estimates permit cost in Greensboro from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum permit fee
Flat fee $85.00
$85.00
○New construction column, general construction cost of $50,000
Flat fee $264.50
$264.50
○New construction column, general construction cost of $100,000
Flat fee $427.00
$427.00
○New construction, cost $100,000 to $500,000
$427.00 base plus $3.25 x 250 = $1,239.50
$1,239.50
○New construction, cost $500,000 and above
$1,727.00 base plus $1.15 x 250 = $2,014.50
$2,014.50
Valuation rate, new single-family heated area
$75.00 per heated square foot
see rule
○Valuation rate, garage or unfinished basement
$30.00 x 2,000 = $60,000.00
$60,000.00
○State licensed contractors, added to all residential permits
Flat fee $10.00
$10.00
○Worked example printed on the schedule: new residential, general construction cost $143,000, state-licensed contractor
Flat fee $576.75
$576.75
○Demolition permit
Flat fee $85.00
$85.00
Work begun before securing a permit
Double the permit fee
see rule
How this jurisdiction calculates the fee

Valuation-based. The permit fee is read off the City of Greensboro Building Permit Fee Schedule (Document #1005, dated 12/19/24) against the general construction cost - the total construction cost less the plumbing, mechanical and electrical work, which are permitted and paid for separately - rounded up to the next whole $1,000. New homes and detached garages are read from the new-construction column; residential alterations and additions are read from the lower Residential Alt/Add column. For residential new construction the city sets the valuation from its Contractor Residential New Construction Pricing Schedule (effective 01/01/2016): $75.00 per heated square foot, $30.00 per square foot for a garage, unfinished basement or unfinished bonus room, and $15.00 per square foot for decks and porches. A minimum permit fee applies to every permit and state-licensed contractors add $10.00 to residential permits.

Source: published fee schedule · Verified 9/15/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum permit fee
Flat fee $85.00
$85.00
○Valuation rate for decks and porches, used to set the construction value
$15.00 x 2,000 = $30,000.00
$30,000.00
○Residential Alt/Add column, construction value up to $11,000
Flat fee $85.00
$85.00
○Residential Alt/Add column, construction value $12,000
Flat fee $88.00
$88.00
○Residential Alt/Add column, construction value $25,000
Flat fee $127.00
$127.00
○Residential Alt/Add column, construction value $50,000
Flat fee $202.00
$202.00
○Residential addition or alteration, value $100,000 to $500,000
$302.00 base plus $2.00 x 250 = $802.00
$802.00
○State licensed contractors, added to all residential permits
Flat fee $10.00
$10.00
Work begun before securing a permit
Double the permit fee
see rule
How this jurisdiction calculates the fee

Valuation-based, from the City of Greensboro Building Permit Fee Schedule (Document #1005, dated 12/19/24). A deck is residential work whose construction value the city sets from its Contractor Residential New Construction Pricing Schedule at $15.00 per square foot of deck or porch; that value, rounded up to the next whole $1,000, is then read off the Residential Alt/Add column of the fee schedule. Above $11,000 of value that column adds $3.00 per $1,000. Almost every residential deck lands at the minimum permit fee. State-licensed contractors add $10.00 to residential permits, and the fee is doubled if work starts before the permit is issued.

Source: published fee schedule · Verified 9/15/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

100 Amp. Service
$74.00 ea.
see rule
200 Amp. Service
$99.00 ea.
see rule
400 Amp. Service
$131.00 ea.
see rule
Over 400 Amp. Service
$0.10 each additional amp
see rule
Panel
$10.00 ea.
see rule
Outlets (receptacles, switches, etc.)
$0.30 ea.
see rule
Lighting Fixtures
$0.30 ea.
see rule
Water Heater
$10.00 ea.
see rule
Clothes Dryer
$10.00 ea.
see rule
Range, Oven, Cook top
$10.00 ea.
see rule
Residential Swimming Pool
$65.00 ea.
see rule
Spa, Hot tub, Hydromassage tub
$20.00 ea.
see rule
Temporary Cut-in
$85.00 ea.
see rule
Low Voltage
$20.00 ea.
see rule
Add Underground Inspection
$45.00 Ea.
see rule
○Minimum Permit Fee
Flat fee $85.00
$85.00
○Extra Inspection Fee, First Follow-up
Flat fee $45.00
$45.00
More than 3 Insp.on Crawl Space House
$45.00 ea. Inspection
see rule
More Than 4 Insp. on Slab House
$45.00 ea. Inspection
see rule
How this jurisdiction calculates the fee

Electrical permit fees are charged per unit of work, by service size and by device, fixture, appliance or item of equipment, and are subject to a minimum permit fee.

Source: published fee schedule · Verified 9/25/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Roof covering replacement costing $40,000 or less with no structural work - no permit and therefore no permit fee
Flat fee $0.00
$0.00
○Where a permit is triggered: minimum permit fee
Flat fee $85.00
$85.00
○Where a permit is triggered: Residential Alt/Add column, construction value $50,000
Flat fee $202.00
$202.00
○Where a permit is triggered: residential alteration or repair, value $100,000 to $500,000
$302.00 base plus $2.00 x 250 = $802.00
$802.00
○State licensed contractors, added to all residential permits
Flat fee $10.00
$10.00
Work begun before securing a permit
Double the permit fee
see rule
How this jurisdiction calculates the fee

Greensboro charges no permit fee for an ordinary roof replacement because no permit is required for one. The city requires a building permit for all structural construction and for any work costing more than $40,000; at $40,000 or less a permit is required only for listed categories, one of which is the addition of roofing, expressly excluding replacement. A reroof therefore triggers a permit and a fee only where it costs more than $40,000 or where load-bearing structure (for example damaged decking or framing) is repaired or replaced. In that case the fee is valuation-based from the Building Permit Fee Schedule (Document #1005, dated 12/19/24), read off the Residential Alt/Add column against the construction cost rounded up to the next whole $1,000, with a minimum permit fee and a $10.00 addition for state-licensed contractors.

Source: published fee schedule · Verified 9/15/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum permit fee (new homes and detached garages)
Flat fee $85.00
$85.00
○New construction column, construction value $11,000 or less
Flat fee $98.75
$98.75
○New construction column, construction value $25,000
Flat fee $158.25
$158.25
○New construction column, construction value $50,000
Flat fee $264.50
$264.50
○Residential Alt/Add column, construction value up to $11,000
Flat fee $85.00
$85.00
○State licensed contractors, added to all residential permits
Flat fee $10.00
$10.00
Work begun before securing a permit
Double the permit fee
see rule
How this jurisdiction calculates the fee

Valuation-based, from the City of Greensboro Building Permit Fee Schedule (Document #1005, dated 12/19/24). Greensboro requires a building permit any time you cover new ground, which includes an accessory building, so a storage building or shed is permitted and the fee is read off the fee schedule against the construction cost rounded up to the next whole $1,000. Detached garages and new homes are read from the new-construction column; the schedule carries no separate line for storage buildings or sheds and no published per-square-foot valuation rate for them, so the construction cost is the amount stated on the permit application (or, for work the city values itself, the International Code Council Building Valuation Data referenced by the fee calculation worksheet). A minimum permit fee applies and state-licensed contractors add $10.00 to residential permits.

Source: published fee schedule · Verified 9/15/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Water Heater, all kinds
$7.00 ea.
see rule
Water Storage Tank
$7.00 ea.
see rule
Gas Connection for Water Heater Replacement
$10.00 ea
see rule
Water Line - Existing House
$7.00 ea.
see rule
Water Softener Unit
$7.00 ea.
see rule
Backflow Preventer
$15.00 ea.
see rule
○Minimum Permit/Inspection Fee
Flat fee $85.00
$85.00
○Extra Inspection Fee, First Follow-up
Flat fee $45.00
$45.00
More than 3 Insp. on Crawl Space House
$45.00 ea.
see rule
More than 4 Insp. on a Slab House
$45.00 ea.
see rule
How this jurisdiction calculates the fee

Plumbing permit fees are charged per unit of work and are subject to a minimum permit/inspection fee. The fees apply to old work as well as new, and apply when it is necessary for any reason to set, reset or replace any fixture, hot water storage tank, or water heater.

Source: published fee schedule · Verified 9/25/2026

See the full write-up: Greensboro building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.