Chattanooga, Tennessee Building Permit Cost Calculator
Estimates permit cost in Chattanooga from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Total Valuation $1,000.00 and less No fee, unless inspection is required, in which case a $40.00 fee for each inspection shall be charged | see rule |
Total Valuation $1,001.00 to $50,000.00 $25.00 for the first $1,000.00 plus $5.75 for each additional thousand or fraction thereof, to and including $50,000.00 | see rule |
Total Valuation $50,001.00 to $100,000.00 $295.00 for the first $50,000.00 plus $4.75 for each additional thousand or fraction thereof, to and including $100,000.00 | see rule |
Total Valuation $100,000.00 to $500,000.00 $525.00 for the first $100,000.00 plus $3.75 for each additional thousand or fraction thereof, to and including $500,000.00 | see rule |
Total Valuation $500,001.00 and up $1,925.00 for the first $500,000.00 plus $2.75 for each additional thousand or fraction thereof | see rule |
Plan Checking Fee · add-on 30% of Building Permit Fee — select the permit fee line above to calculate | see rule |
Building Permit Plan Revision Fee · add-on 5% of Plan Review Fee — select the permit fee line above to calculate | see rule |
Fire & Life Safety Inspection and Plans Review · add-on 20% of Building Permit Fee — select the permit fee line above to calculate | see rule |
○Re-inspections (Bldg., Plumbing, Gas, Mechanical, Electrical, Fire and Signs) Flat fee $50.00 | $50.00 |
○Permit Transfer Flat fee $50.00 | $50.00 |
○Certificate of Occupancy (New Facility) Flat fee $15.00 | $15.00 |
Work started before the permit is obtained (Section 109.2.3) Fees doubled | see rule |
How this jurisdiction calculates the fee
The building permit fee is a non-refundable fee calculated from the total valuation of the work, using the bracket base amount plus a per-thousand rate on the remainder, as enacted at Chattanooga City Code Part II, Chapter 10, Section 10-3(j)(f), Section 109.2 by Ordinance No. 13929, effective January 1, 2023. Where work is started before the permit is obtained, the fees are doubled (Section 109.2.3).
Source: published fee schedule · Verified 9/15/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Total Valuation $1,000.00 and less No fee, unless inspection is required, in which case a $40.00 fee for each inspection shall be charged. | see rule |
Total Valuation $1,001.00 to $50,000.00 $25.00 for the first $1,000.00 plus $5.75 for each additional thousand or fraction thereof, to and including $50,000.00 | see rule |
Total Valuation $50,001.00 to $100,000.00 (City Code Section 10-3, adopted Section 109.2) $295.00 for the first $50,000.00 plus $4.75 for each additional thousand or fraction thereof, to and including $100,000.00 | see rule |
Total Valuation $50,001.00 to $100,000.00 (conflicting figure published on the chattanooga.gov Residential Building Permit page) $306.75 for the first $50,000.00 plus $4.75 for each additional thousand or fraction thereof, to and including $100,000.00 | see rule |
Total Valuation $100,000.00 to $500,000.00 (City Code Section 10-3) $525.00 for the first $100,000.00 plus $3.75 for each additional thousand or fraction thereof, to and including $500,000.00 | see rule |
Total Valuation $100,000.00 to $500,000.00 (conflicting figure on the chattanooga.gov Residential Building Permit page) $544.25 for the first $100,000.00 plus $3.75 for each additional thousand or fraction thereof, to and including $500,000.00 | see rule |
Total Valuation $500,001.00 and up (City Code Section 10-3) $1,925.00 for the first $500,000.00 plus $2.75 for each additional thousand or fraction thereof | see rule |
Total Valuation $500,001.00 and up (conflicting figure on the chattanooga.gov Residential Building Permit page) $2,044.25 for the first $500,000.00 plus $2.75 for each additional thousand or fraction thereof | see rule |
Plan Checking Fee · add-on 30% of Building Permit Fee — select the permit fee line above to calculate | see rule |
Fire & Life Safety Inspection and Plans Review · add-on 20% of Building Permit Fee — select the permit fee line above to calculate | see rule |
○Re-inspections (Bldg., Plumbing, Gas, Mechanical, Electrical, Fire and Signs) Flat fee $50.00 | $50.00 |
○Certificates of Completion Flat fee $25.00 | $25.00 |
Work started before obtaining the permit (Section 109.2.3) The fees specified shall be doubled | see rule |
How this jurisdiction calculates the fee
A deck is permitted as a building permit in Chattanooga: a Residential Building Permit where the work alters the existing footprint, or a Residential Repair Replace/Alteration Permit where an existing deck is being replaced. Chattanooga City Code Section 10-3 amends Section 109.2 of the adopted building code by adopting a single non-refundable fee schedule for all building permits, based on total valuation, with a base amount for each valuation bracket plus a per-thousand rate on the remainder. A plan checking fee and a fire and life safety review fee are charged as percentages of the building permit fee, and the fee is doubled where work starts before the permit is obtained.
Source: published fee schedule · Verified 9/15/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○For issuing permit Flat fee $40.00 | $40.00 |
Electrical services, 600 volts or less $20.00 plus $4.00 per 100 amps | see rule |
○Electrical services over 600 volts, per KVA ($400.00 min.) Flat fee $0.40 | $0.40 |
○Temporary Service, Complete, 100 amps or less Flat fee $35.00 | $35.00 |
Temporary Service, Complete, greater than 100 amps $35.00 plus $8.00 per 100 amps | see rule |
○Feeder and branch circuits (new or alterations to existing), 0—30 amp Flat fee $4.00 | $4.00 |
○Feeder and branch circuits (new or alterations to existing), 31—100 amp Flat fee $8.00 | $8.00 |
○Feeder and branch circuits (new or alterations to existing), larger, per 100 amp Flat fee $16.00 | $16.00 |
○Transformers, 100 KVA or less Flat fee $25.00 | $25.00 |
Transformers, over 100 KVA $25.00 plus $0.10 per KVA over 100 | see rule |
○Internally wired signs, 25 sq. ft. or less Flat fee $40.00 | $40.00 |
○Internally wired signs, over 25 square feet $40.00 base plus $0.40 x 2,000 = $840.00 | $840.00 |
○Neon transformers (enclosed or separate), per transformer Flat fee $40.00 | $40.00 |
○Approval of non-listed or non-labeled equipment, per engineer letter Flat fee $25.00 | $25.00 |
○Approval of signs and showcases, per sign or showcase Flat fee $25.00 | $25.00 |
○Re-inspection fee Flat fee $50.00 | $50.00 |
○Double Fee, minimum Flat fee $70.00 | $70.00 |
○Double Fee, maximum Flat fee $500.00 | $500.00 |
○Low-voltage and power limited systems, single tenant Flat fee $15.00 | $15.00 |
○Low-voltage and power limited systems, multiple tenant Flat fee $15.00 | $15.00 |
How this jurisdiction calculates the fee
Before an electrical contractor obtains a permit for installation or alterations, services, feeders, branch circuits or signs, a non-refundable fee is paid consisting of a permit issuance charge plus per-item charges for the equipment and circuits covered.
Source: published fee schedule · Verified 9/30/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Total Valuation $1,000.00 and less No fee, unless inspection is required, in which case a $40.00 fee for each inspection shall be charged. | see rule |
Total Valuation $1,001.00 to $50,000.00 $25.00 for the first $1,000.00 plus $5.75 for each additional thousand or fraction thereof, to and including $50,000.00 | see rule |
Total Valuation $50,001.00 to $100,000.00 (City Code Section 10-3, adopted Section 109.2) $295.00 for the first $50,000.00 plus $4.75 for each additional thousand or fraction thereof, to and including $100,000.00 | see rule |
Total Valuation $50,001.00 to $100,000.00 (conflicting figure published on the chattanooga.gov Residential Building Permit page) $306.75 for the first $50,000.00 plus $4.75 for each additional thousand or fraction thereof, to and including $100,000.00 | see rule |
Total Valuation $100,000.00 to $500,000.00 (City Code Section 10-3) $525.00 for the first $100,000.00 plus $3.75 for each additional thousand or fraction thereof, to and including $500,000.00 | see rule |
Total Valuation $100,000.00 to $500,000.00 (conflicting figure on the chattanooga.gov Residential Building Permit page) $544.25 for the first $100,000.00 plus $3.75 for each additional thousand or fraction thereof, to and including $500,000.00 | see rule |
Plan Checking Fee · add-on 30% of Building Permit Fee — select the permit fee line above to calculate | see rule |
Fire & Life Safety Inspection and Plans Review · add-on 20% of Building Permit Fee — select the permit fee line above to calculate | see rule |
○Re-inspections (Bldg., Plumbing, Gas, Mechanical, Electrical, Fire and Signs) Flat fee $50.00 | $50.00 |
○Certificates of Completion Flat fee $25.00 | $25.00 |
Work started before obtaining the permit (Section 109.2.3) The fees specified shall be doubled | see rule |
How this jurisdiction calculates the fee
Re-roofing is permitted in Chattanooga as a Residential Repair Replace/Alteration Permit, which the city states applies to re-roofing among other work to an existing structure that does not alter the footprint. Chattanooga City Code Section 10-3 amends Section 109.2 of the adopted building code by adopting a single non-refundable fee schedule for all building permits, based on total valuation, with a base amount for each valuation bracket plus a per-thousand rate on the remainder. A plan checking fee and a fire and life safety review fee are charged as percentages of the building permit fee, and the fee is doubled where work starts before the permit is obtained.
Source: published fee schedule · Verified 9/15/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
How this jurisdiction calculates the fee
The cost is based on a percentage of the construction cost.
Source: published fee schedule · Verified 8/5/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Total Valuation $1,000.00 and less No fee, unless inspection is required, in which case a $40.00 fee for each inspection shall be charged | see rule |
Total Valuation $1,001.00 to $50,000.00 $25.00 for the first $1,000.00 plus $5.75 for each additional thousand or fraction thereof, to and including $50,000.00 | see rule |
Total Valuation $50,001.00 to $100,000.00 $295.00 for the first $50,000.00 plus $4.75 for each additional thousand or fraction thereof, to and including $100,000.00 | see rule |
Total Valuation $100,000.00 to $500,000.00 $525.00 for the first $100,000.00 plus $3.75 for each additional thousand or fraction thereof, to and including $500,000.00 | see rule |
Total Valuation $500,001.00 and up $1,925.00 for the first $500,000.00 plus $2.75 for each additional thousand or fraction thereof | see rule |
Plan Checking Fee · add-on 30% of Building Permit Fee — select the permit fee line above to calculate | see rule |
○Re-inspections (Bldg., Plumbing, Gas, Mechanical, Electrical, Fire and Signs) Flat fee $50.00 | $50.00 |
Work started before the permit is obtained (Section 109.2.3) Fees doubled | see rule |
How this jurisdiction calculates the fee
Where a building permit is required for an accessory structure, the non-refundable fee adopted at Section 109.2 is based on total valuation, with a bracket base amount plus a per-thousand rate on the remainder, as enacted at Chattanooga City Code Part II, Chapter 10, Section 10-3(j)(f) by Ordinance No. 13929, effective January 1, 2023. Where work is started before the permit is obtained, the fees are doubled (Section 109.2.3). | CONFLICT BETWEEN TWO OFFICIAL CITY SOURCES, RECORDED 2026-09-15 (lane B run 1226), NEITHER PICKED. The codified Chattanooga City Code, Chapter 10 Article I Sec. 10-3, marked VERSION: SEP 9, 2026 (CURRENT) on Municode, prints the bracket bases stored here: $295.00 for the first $50,000; $525.00 for the first $100,000; $1,925.00 for the first $500,000. These match Ordinance No. 13929 verbatim (the ordinance PDF was OCR-read in full). BUT chattanooga.gov's own live Request a Residential Building Permit and Request a Commercial Building Permit pages both print HIGHER bases for the same three brackets: $306.75 for the first $50,000; $544.25 for the first $100,000; $2,044.25 for the first $500,000. The $1,000-and-less band ($40.00 per inspection) and the $1,001-$50,000 band ($25.00 plus $5.75 per additional thousand) are identical in both. The web-page figures are the arithmetically consistent continuation of the ordinance's own per-thousand rates ($25.00 + 49 x $5.75 = $306.75; $306.75 + 50 x $4.75 = $544.25; $544.25 + 400 x $3.75 = $2,044.25), i.e. the ordinance's printed bases are internally inconsistent with its own step rates. The figures stored here follow the ADOPTED AND CODIFIED instrument. DO NOT silently switch to the web-page figures; a human should ask the Land Development Office which set is charged.
Source: published fee schedule · Verified 9/15/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Permit Issuance Flat fee $40.00 | $40.00 |
○For each Water Heater and/or Vent Flat fee $6.00 | $6.00 |
○For each Plumbing Fixture, Floor Drain or Trap Flat fee $6.00 | $6.00 |
○For each installation, alteration or repair of Water Piping Flat fee $10.00 | $10.00 |
○For each repair or alteration of Drainage or Vent Piping Flat fee $10.00 | $10.00 |
○For each Vacuum Breaker or backflow protective device Flat fee $10.00 | $10.00 |
○For each Pressure Reducing Device and each Check Valve Assembly (1-5) Flat fee $6.00 | $6.00 |
○For each Roof Drain Flat fee $5.00 | $5.00 |
○For each Other Miscellaneous Item Flat fee $5.00 | $5.00 |
○For each Building Sewer Flat fee $20.00 | $20.00 |
○For each Building Sewer (replacement/repair) Flat fee $20.00 | $20.00 |
○For each Sanitary Sewer Connection Flat fee $70.00 | $70.00 |
○For each Lateral Sewer Connection Flat fee $800.00 | $800.00 |
○For each Manhole Flat fee $100.00 | $100.00 |
○For each Sand, Grease, or Oil Interceptor (Underground) Flat fee $35.00 | $35.00 |
○For each Sand, Grease, or Oil Interceptor (Above Ground) Flat fee $10.00 | $10.00 |
○For each Re-inspection Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Plumbing permit fees are a flat issuance charge plus a per-item charge for each fixture, appliance or connection included in the work.
Source: published fee schedule · Verified 11/11/2026
See the full write-up: Chattanooga building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.