Memphis, Tennessee Building Permit Cost Calculator
Estimates permit cost in Memphis from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Application fee - new, additions Flat fee $50.00 | $50.00 |
○New construction or addition per sq. ft. Flat fee $0.07 | $0.07 |
○Minimum fee for new SFR or DUP Flat fee $125.00 | $125.00 |
○Minimum fee for additions 400 sq. ft. or less Flat fee $50.00 | $50.00 |
○Minimum fee for additions 401 sq. ft. - 800 sq. ft. Flat fee $75.00 | $75.00 |
○Minimum fee for additions over 800 sq. ft. Flat fee $125.00 | $125.00 |
○One and two family dwellings plan review fee, up to 2,500 sq ft Flat fee $125.00 | $125.00 |
○One and two family dwellings plan review fee, over 2,500 sq ft Flat fee $150.00 | $150.00 |
○Certificate of occupancy Flat fee $125.00 | $125.00 |
○Issuing each permit (data processing) Flat fee $4.00 | $4.00 |
○Residential surcharge (housing initiative) Flat fee $1.00 | $1.00 |
○Re-inspection fee Flat fee $50.00 | $50.00 |
○Permit amendment Flat fee $25.00 | $25.00 |
Work commencing before permit issuance Double fee | see rule |
How this jurisdiction calculates the fee
Permitting for Memphis runs through the Memphis and Shelby County Office of Construction Code Enforcement, a joint city-county body under the Division of Planning and Development, and its 2022 Fee Schedule - Building Section Fees governs. One and two family dwelling permits combine a flat application fee with a per-square-foot construction charge, subject to stated minimums that step up with the size of the work, plus a plan review fee set by house size. A $4.00 data processing charge and a $1.00 residential housing initiative surcharge are added to every residential permit. | AGE-OF-SOURCE FLAG 2026-09-12 (lane B run 814): every stored figure verifies verbatim against the cited document, but that document is the "2022 FEE SCHEDULE - BUILDING SECTION FEES" and is four years old. Shelby County's Construction Code Enforcement pages (shelbycountytn.gov/389 and /fee-information) both 404, so no successor could be confirmed or ruled out from the agency's own site this pass; the County search engine still returns this 2022 document as the building fee schedule. Not a supersession - but this is a likely place for a quiet one and is worth a targeted human check.
Source: published fee schedule · Verified 10/5/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Construction/repair/alteration to decks, spas and similar structures Flat fee $50.00 | $50.00 |
○App. fee - alterations, repairs, accessory Flat fee $25.00 | $25.00 |
○Issuing each permit (data processing) Flat fee $4.00 | $4.00 |
○Residential surcharge (housing initiative) Flat fee $1.00 | $1.00 |
○Re-inspection fee Flat fee $50.00 | $50.00 |
○Permit amendment Flat fee $25.00 | $25.00 |
Work commencing before permit issuance Double fee | see rule |
How this jurisdiction calculates the fee
Memphis and Shelby County Office of Construction Code Enforcement 2022 Fee Schedule - Building Section Fees. Decks are a named line in the one and two family dwelling table and carry a flat permit fee rather than a valuation calculation, with the accessory/alteration application fee charged alongside it. A $4.00 data processing charge and a $1.00 residential housing initiative surcharge are added to every residential permit. | AGE-OF-SOURCE FLAG 2026-09-12 (lane B run 814): every stored figure verifies verbatim against the cited document, but that document is the "2022 FEE SCHEDULE - BUILDING SECTION FEES" and is four years old. Shelby County's Construction Code Enforcement pages (shelbycountytn.gov/389 and /fee-information) both 404, so no successor could be confirmed or ruled out from the agency's own site this pass; the County search engine still returns this 2022 document as the building fee schedule. Not a supersession - but this is a likely place for a quiet one and is worth a targeted human check.
Source: published fee schedule · Verified 10/5/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○E-0 Fee issuance cost per permit except for meter put backs (E5.2) Flat fee $20.00 | $20.00 |
○E-6.2 Existing residential 1&2 family occupancies, 1 to 5 circuits Flat fee $30.00 | $30.00 |
○E-6.2 Existing residential 1&2 family occupancies, over 5 circuits Flat fee $45.00 | $45.00 |
○E6.3 Service, feeder, or panel replacement Flat fee $50.00 | $50.00 |
○E6.4 In ground residential swimming pool Flat fee $100.00 | $100.00 |
○E6.5 Residential low voltage Flat fee $30.00 | $30.00 |
○E6.6 Manufactured homes Flat fee $50.00 | $50.00 |
○E6.8 Residential temporary meter center Flat fee $25.00 | $25.00 |
○E3.1 Minimum fee Flat fee $15.00 | $15.00 |
○E-1.3 Each amendment minimum fee Flat fee $20.00 | $20.00 |
○E5.1.1 Re-inspection fee Flat fee $50.00 | $50.00 |
○E5.2 Meter put back Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Electrical permits carry a per-permit fee issuance cost plus a unit fee set by the type of work; existing residential one- and two-family work is charged by circuit count. A $4.00 data processing fee and a $1.00 residential housing initiative fee are added to all permits. | 2026-09-24 (lane B run 1728) HELD, CITED DOCUMENT NOT READABLE THIS PASS, NO FIGURE CHANGED OR CALLED ABSENT. The CivicPlus DocumentCenter host serving this document returned an "Attention Required! | Cloudflare" CAPTCHA interstitial (HTTP 403) to every direct client including headless Chromium, and the WebFetch fallback returned HTTP 429 on three separate attempts spaced over the pass. Per lane policy the challenge was not solved and no figure was altered on unread output. Row left unstamped so it returns first in the next rotation. Note that durhamnc.gov, a DocumentCenter host on the same platform, served its document normally today, so this is per-host rate limiting rather than a platform-wide change and a retry on a later pass is likely to succeed. | 2026-09-25 (lane B run 1754) HELD, SECOND CONSECUTIVE PASS, CITED DOCUMENT STILL NOT READABLE. shelbycountytn.gov's CivicPlus DocumentCenter returned an "Attention Required! | Cloudflare" interstitial (HTTP 403) to curl and to headless Chromium, and the WebFetch fallback returned HTTP 429 on two attempts spaced across the pass. Per lane policy the challenge was not solved; no figure altered, no figure called absent. Row left unstamped. All four Memphis rows in this batch (electrical, fence, shed, water_heater) are blocked by the same host. THIS HOST HAS NOW BLOCKED TWO CONSECUTIVE WEEKLY PASSES - if it blocks a third, the Memphis rows should be escalated for a human read rather than rotated again. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). shelbycountytn.gov's DocumentCenter returned HTTP 200 to a plain client this pass; the Cloudflare "Attention Required!" interstitial that blocked runs 1728 and 1754 was absent and no challenge was solved. The 2022 Building Fee Schedule (9 pages) was downloaded and read in full with pdftotext -layout, and every figure stored on every Memphis row in this batch re-reads verbatim. The escalation flagged in run 1754, to hand Memphis to a human read if the host blocked a third consecutive weekly pass, is therefore stood down. No supersession: the document is still the 2022 schedule and Shelby County publishes no successor at this DocumentCenter id.
Source: published fee schedule · Verified 9/28/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Residential fence permit 400 linear ft or less Flat fee $25.00 | $25.00 |
Residential fence permit 401 linear ft or more ($0.07/SQ. FT.) $50.00 MIN. | see rule |
○Issuing each permit (data processing) Flat fee $4.00 | $4.00 |
○Residential surcharge Flat fee $1.00 | $1.00 |
○Permit amendment Flat fee $25.00 | $25.00 |
○Re-inspection fee Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Flat fee for a residential fence permit covering 400 linear feet or less; at 401 linear feet or more the fee is charged per square foot with a stated minimum. A $4.00 data processing fee and a $1.00 residential housing initiative fee are added to all permits. | 2026-09-24 (lane B run 1728) HELD, CITED DOCUMENT NOT READABLE THIS PASS, NO FIGURE CHANGED OR CALLED ABSENT. The CivicPlus DocumentCenter host serving this document returned an "Attention Required! | Cloudflare" CAPTCHA interstitial (HTTP 403) to every direct client including headless Chromium, and the WebFetch fallback returned HTTP 429 on three separate attempts spaced over the pass. Per lane policy the challenge was not solved and no figure was altered on unread output. Row left unstamped so it returns first in the next rotation. Note that durhamnc.gov, a DocumentCenter host on the same platform, served its document normally today, so this is per-host rate limiting rather than a platform-wide change and a retry on a later pass is likely to succeed. | 2026-09-25 (lane B run 1754) HELD, SECOND CONSECUTIVE PASS. shelbycountytn.gov's DocumentCenter served a Cloudflare CAPTCHA interstitial (403) to curl and headless Chromium and HTTP 429 to the WebFetch fallback on two attempts. Challenge not solved, no figure altered or called absent, row unstamped. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). shelbycountytn.gov's DocumentCenter returned HTTP 200 to a plain client this pass; the Cloudflare "Attention Required!" interstitial that blocked runs 1728 and 1754 was absent and no challenge was solved. The 2022 Building Fee Schedule (9 pages) was downloaded and read in full with pdftotext -layout, and every figure stored on every Memphis row in this batch re-reads verbatim. The escalation flagged in run 1754, to hand Memphis to a human read if the host blocked a third consecutive weekly pass, is therefore stood down. No supersession: the document is still the 2022 schedule and Shelby County publishes no successor at this DocumentCenter id.
Source: published fee schedule · Verified 9/28/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Reroof of a single-family home with no decking work - no permit required, no fee Flat fee $0.00 | $0.00 |
Where decking is repaired or altered: alteration/repair ($5.00/1,000 valuation) $50.00 MIN / $325.00 MAX | see rule |
○App. fee - alterations, repairs, accessory Flat fee $25.00 | $25.00 |
○Issuing each permit (data processing) Flat fee $4.00 | $4.00 |
○Residential surcharge (housing initiative) Flat fee $1.00 | $1.00 |
○Re-inspection fee Flat fee $50.00 | $50.00 |
Work commencing before permit issuance Double fee | see rule |
Commercial roofing, for contrast, is a named line ($5.00 per 1,000) $70 MIN. - $560 MAX. | see rule |
How this jurisdiction calculates the fee
No permit and therefore no permit fee for a straightforward reroof of a single-family home. The Memphis and Shelby County Office of Construction Code Enforcement states in its Policy for Roof Installations (revised June 8, 2022) that a permit is not required for a residential roof repair or reroof unless the decking is repaired or altered; new sheathing or repair to sheathing does require a permit. Where decking work brings the job into permit territory, the 2022 Fee Schedule prices it as a residential alteration or repair on construction valuation, with a stated minimum and maximum, plus the accessory/alteration application fee. A $4.00 data processing charge and a $1.00 residential housing initiative surcharge are added to every residential permit.
Source: published fee schedule · Verified 10/5/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Pool or retaining wall $5.00/1,000 (no max), residential $70.00 MIN | see rule |
○App. fee - alterations, repairs, accessory Flat fee $25.00 | $25.00 |
Tower, stack, pool, retaining wall ($5.00 / 1,000), commercial miscellaneous construction $70.00 MIN. | see rule |
○Issuing each permit (data processing) Flat fee $4.00 | $4.00 |
○Residential surcharge (housing initiative) Flat fee $1.00 | $1.00 |
○Re-inspection fee Flat fee $50.00 | $50.00 |
○Permit amendment Flat fee $25.00 | $25.00 |
Work commencing before permit issuance Double fee | see rule |
How this jurisdiction calculates the fee
Memphis and Shelby County Office of Construction Code Enforcement 2022 Fee Schedule - Building Section Fees. Retaining walls are a named line in the one and two family dwelling table and are charged on construction valuation at a rate per $1,000 with a stated minimum and no maximum, alongside the accessory/alteration application fee. A $4.00 data processing charge and a $1.00 residential housing initiative surcharge are added to every residential permit. The commercial side of the same schedule prices a retaining wall on the same per $1,000 basis with the same minimum.
Source: published fee schedule · Verified 10/5/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○App. fee – alterations, repairs, accessory Flat fee $25.00 | $25.00 |
○Detatched accessory buildings 400 sq. ft. or less Flat fee $25.00 | $25.00 |
Detatched accessory buildings over 400 sq. ft. ($0.07/SQ FT) $50.00 MIN | see rule |
○Issuing each permit (data processing) Flat fee $4.00 | $4.00 |
○Residential surcharge Flat fee $1.00 | $1.00 |
○Permit amendment Flat fee $25.00 | $25.00 |
○Re-inspection fee Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Detached accessory buildings are charged a flat fee at 400 square feet or less and a per-square-foot fee with a stated minimum above 400 square feet. The residential application fee for accessory work is listed separately. A $4.00 data processing fee and a $1.00 residential housing initiative fee are added to all permits. | 2026-09-24 (lane B run 1728) HELD, CITED DOCUMENT NOT READABLE THIS PASS, NO FIGURE CHANGED OR CALLED ABSENT. The CivicPlus DocumentCenter host serving this document returned an "Attention Required! | Cloudflare" CAPTCHA interstitial (HTTP 403) to every direct client including headless Chromium, and the WebFetch fallback returned HTTP 429 on three separate attempts spaced over the pass. Per lane policy the challenge was not solved and no figure was altered on unread output. Row left unstamped so it returns first in the next rotation. Note that durhamnc.gov, a DocumentCenter host on the same platform, served its document normally today, so this is per-host rate limiting rather than a platform-wide change and a retry on a later pass is likely to succeed. | 2026-09-25 (lane B run 1754) HELD, SECOND CONSECUTIVE PASS, same shelbycountytn.gov Cloudflare block (403 to direct clients, 429 to WebFetch). Nothing altered. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). shelbycountytn.gov's DocumentCenter returned HTTP 200 to a plain client this pass; the Cloudflare "Attention Required!" interstitial that blocked runs 1728 and 1754 was absent and no challenge was solved. The 2022 Building Fee Schedule (9 pages) was downloaded and read in full with pdftotext -layout, and every figure stored on every Memphis row in this batch re-reads verbatim. The escalation flagged in run 1754, to hand Memphis to a human read if the host blocked a third consecutive weekly pass, is therefore stood down. No supersession: the document is still the 2022 schedule and Shelby County publishes no successor at this DocumentCenter id.
Source: published fee schedule · Verified 9/28/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Plumbing permit issuance Flat fee $20.00 | $20.00 |
○P-1.2.1 For each electric water heater Flat fee $7.50 | $7.50 |
○P-1.1 Electric water heater replacement Flat fee $7.50 | $7.50 |
○G-0 Fee issuance cost per permit Flat fee $20.00 | $20.00 |
○G-3.1.3 Water heater first $1000 Flat fee $15.00 | $15.00 |
○G-3.1.3 Per each additional $1000 Flat fee $8.00 | $8.00 |
○G-4 Minimum permit fee Flat fee $15.00 | $15.00 |
○Issuing each permit (data processing) Flat fee $4.00 | $4.00 |
Residential/commercial (surcharge) $1.00/$5.00 | see rule |
○Plumbing second re-inspection trip Flat fee $50.00 | $50.00 |
○G-7.1 First re-inspection fee Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
An electric water heater is permitted under the plumbing fee schedule as a unit fee charged in addition to the plumbing permit issuance, processing and surcharge fees. A gas water heater is permitted under the gas fee schedule, which charges by valuation of the installation with a fee for the first $1,000 and an additional amount per each additional $1,000, in addition to the gas permit issuance fee. A $4.00 data processing fee and a $1.00 residential housing initiative fee are added to all permits. | 2026-09-24 (lane B run 1728) HELD, CITED DOCUMENT NOT READABLE THIS PASS, NO FIGURE CHANGED OR CALLED ABSENT. The CivicPlus DocumentCenter host serving this document returned an "Attention Required! | Cloudflare" CAPTCHA interstitial (HTTP 403) to every direct client including headless Chromium, and the WebFetch fallback returned HTTP 429 on three separate attempts spaced over the pass. Per lane policy the challenge was not solved and no figure was altered on unread output. Row left unstamped so it returns first in the next rotation. Note that durhamnc.gov, a DocumentCenter host on the same platform, served its document normally today, so this is per-host rate limiting rather than a platform-wide change and a retry on a later pass is likely to succeed. | 2026-09-25 (lane B run 1754) HELD, SECOND CONSECUTIVE PASS, same shelbycountytn.gov Cloudflare block (403 to direct clients, 429 to WebFetch). Nothing altered. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). shelbycountytn.gov's DocumentCenter returned HTTP 200 to a plain client this pass; the Cloudflare "Attention Required!" interstitial that blocked runs 1728 and 1754 was absent and no challenge was solved. The 2022 Building Fee Schedule (9 pages) was downloaded and read in full with pdftotext -layout, and every figure stored on every Memphis row in this batch re-reads verbatim. The escalation flagged in run 1754, to hand Memphis to a human read if the host blocked a third consecutive weekly pass, is therefore stood down. No supersession: the document is still the 2022 schedule and Shelby County publishes no successor at this DocumentCenter id.
Source: published fee schedule · Verified 9/28/2026
See the full write-up: Memphis building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.