Nashville, Tennessee Building Permit Cost Calculator
Estimates permit cost in Nashville from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Zoning examination fee Flat fee $25.00 | $25.00 |
○Residential valuation fee, one-family and two-family dwellings and townhouses $5.00 x 250 = $1,250.00 | $1,250.00 |
Codes tech fee · add-on 10% of the Building Valuation Fee — select the permit fee line above to calculate | see rule |
Plans examination, valuation $0.00 to $275,000.00 one-half of the building permit fee | see rule |
Commercial valuation $2,000.01 to $50,000.00 $40.39 for the first $2,000.00 plus $6.92 for each additional thousand or fraction thereof | see rule |
○Re-inspection fee Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
The permit total is the sum of a zoning examination fee, a valuation-based building fee, a codes tech fee of 10 percent of the valuation fee, and a plan review fee.
Source: published fee schedule · Verified 9/18/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Zoning examination fee Flat fee $25.00 | $25.00 |
○Building permit fee, residential construction (one-family and two-family dwellings and townhouses), Metro Code 16.28.110 A.1 $5.00 x 250 = $1,250.00 | $1,250.00 |
Codes tech fee · add-on 10% of the Building Valuation Fee — select the permit fee line above to calculate | see rule |
Plans examination fee, one- and two-family dwelling and townhouse building permits Excepted, no plans examination fee | see rule |
Plans examination fee where it applies, total valuation $0.00 to $275,000.00 one-half of the building permit fee | see rule |
○Re-inspection fee Flat fee $50.00 | $50.00 |
○Use and occupancy permit or certificate of compliance where no building permit was issued Flat fee $55.00 | $55.00 |
How this jurisdiction calculates the fee
A deck is permitted as a residential building permit by the Metro Nashville Department of Codes and Building Safety. The total permit cost is the zoning examination fee, plus a valuation-based building permit fee, plus a codes tech fee of 10 percent of the building valuation fee. One- and two-family dwelling building permits and townhouse building permits are expressly excepted from the plans examination fee, so no plan review fee is charged on a typical residential deck.
Source: published fee schedule · Verified 11/5/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum fee, each permit Flat fee $75.00 | $75.00 |
○10 or fewer outlets Flat fee $6.00 | $6.00 |
○Additional outlets over 10, each Flat fee $1.00 | $1.00 |
○Service, new, increase or relocate, per meter Flat fee $12.00 | $12.00 |
○Panels 200 amperes or less Flat fee $10.00 | $10.00 |
○Water heaters, residential, each Flat fee $15.00 | $15.00 |
○Electric ranges, residential Flat fee $20.00 | $20.00 |
○Reinspection Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Electrical permit fees are itemized by outlet, device, motor, panel and service, subject to a minimum fee for each permit.
Source: published fee schedule · Verified 11/10/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Fence - no permit required by Metro Nashville and no fence line item in the Codes fee schedule Flat fee $0.00 | $0.00 |
Exception: property in a Historic Preservation or Historic Landmark Overlay requires a Preservation Permit from the Metro Historic Zoning Commission See Metro Historic Zoning Commission; not priced in the Codes fee schedule | see rule |
How this jurisdiction calculates the fee
Metro Nashville does not require a permit for a fence at this time, so no permit fee is charged. Residents must still meet Zoning and Building Code requirements and material restrictions. The Metro Nashville Codes fee schedule contains no fence line item. The one exception is a property within a Historic Preservation or Historic Landmark Overlay, where a Preservation Permit from the Metro Historic Zoning Commission is required (fencing in Neighborhood Conservation zoning overlays does not require a Preservation Permit); no Preservation Permit fee for fencing was found published by Metro. | 2026-09-12 (lane B run 897): the Metro Nashville Codes Fee Schedule was downloaded and read in full; the word "fence" does not appear anywhere in it, corroborating that no fence permit and no fence fee exist. Recorded as an explicit no-fee outcome so the row is no longer unpriced.
Source: published fee schedule · Verified 11/5/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Residential valuation fee, one-family and two-family dwellings and townhouses $5.00 x 250 = $1,250.00 | $1,250.00 |
○Zoning examination fee Flat fee $25.00 | $25.00 |
Codes tech fee · add-on 10% of the Building Valuation Fee — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Roofing work is permitted as a building permit, with fees based on the valuation of the improvements plus the zoning examination fee and codes tech fee.
Source: published fee schedule · Verified 9/18/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Zoning examination fee Flat fee $25.00 | $25.00 |
○Building permit fee, residential construction (one-family and two-family dwellings and townhouses), Metro Code 16.28.110 A.1 $5.00 x 250 = $1,250.00 | $1,250.00 |
Codes tech fee · add-on 10% of the Building Valuation Fee — select the permit fee line above to calculate | see rule |
Plans examination fee, one- and two-family dwelling and townhouse building permits Excepted, no plans examination fee | see rule |
○Re-inspection fee Flat fee $50.00 | $50.00 |
○Use and occupancy permit or certificate of compliance where no building permit was issued Flat fee $55.00 | $55.00 |
How this jurisdiction calculates the fee
A shed is a detached accessory structure and is permitted as a residential building permit by the Metro Nashville Department of Codes and Building Safety. The total permit cost is the zoning examination fee, plus a valuation-based building permit fee, plus a codes tech fee of 10 percent of the building valuation fee. One- and two-family dwelling building permits and townhouse building permits are expressly excepted from the plans examination fee.
Source: published fee schedule · Verified 11/4/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Plumbing minimum fee, each permit Flat fee $75.00 | $75.00 |
○Plumbing, hot water heater Flat fee $43.00 | $43.00 |
○Gas and mechanical minimum fee, each permit Flat fee $75.00 | $75.00 |
○Gas and mechanical, hot water heater Flat fee $21.00 | $21.00 |
○Electrical, water heaters, residential, each Flat fee $15.00 | $15.00 |
○Electrical, water heaters, commercial, each Flat fee $20.00 | $20.00 |
○Reinspection Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Water heater work is permitted under the trade permit that matches the work, and each trade permit carries a minimum fee plus the itemized device fee.
Source: published fee schedule · Verified 9/18/2026
See the full write-up: Nashville building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.