Home / Calculators / Building Permit Fee Calculator

Knoxville, Tennessee Building Permit Cost Calculator

Estimates permit cost in Knoxville from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Building permit, valuation up to $500,000
.55% of valuation, $50 minimum
see rule
Residential plans review
.025% of valuation, $50 minimum
see rule
○Building permit at $500,000 valuation
Flat fee $2,750.00
$2,750.00
Permit renewal · add-on
25% of original fee, $50 minimum and $1,000 maximum — select the permit fee line above to calculate
see rule
Credit card surcharge
2.75% added to fee total
see rule
How this jurisdiction calculates the fee

Knoxville prices building permits as a percentage of project valuation under the 2024 Development Services Fee Schedule. For valuations up to $500,000 the permit is .55 percent of valuation with a $50 minimum. Above that the charge is $2,750 plus .45 percent of the amount over $500,000 up to $2,000,000, then $9,500 plus .35 percent of the amount over $2,000,000 up to $20,000,000, then $72,500 plus .25 percent of the amount over $20,000,000. Plans review for projects under the residential code is .025 percent of valuation with a $50 minimum. Renewing a permit costs 25 percent of the original fee, with a $50 floor and a $1,000 ceiling. Starting work before the permit is issued costs the value of the permit fee, capped at $1,000 on a project covering one or two dwellings and $5,000 on anything larger. Credit card payments add 2.75 percent. Re-verified 2026-09-14 from the cited PDF, which still heads DEVELOPMENT SERVICES FEE SCHEDULE 2024, and the city Policies and Fast Facts page still links this exact 2024 file as its fee schedule. No successor exists: 2025-development-services-fee-schedule.pdf, 2026-development-services-fee-schedule.pdf and development-services-fee-schedule.pdf all return 404 in the same directory, so the 2024 label is current rather than stale. Every percentage and amount in this row was found on its own line, including the building permit bands (.55% with a $50 minimum, then $2,750 + .45%, $9,500 + .35%, $72,500 + .25%), IRC plans review at .025% with a $50 minimum and a $35 minimum for non-habitable accessory structures, decks and pools, trade permits at the greater of 0.15% of project valuation or .5% of trade valuation with a $55 minimum, reinspection $50 with the first free per discipline, permit renewal at 25% with a $50 minimum and $1,000 maximum, the commencing-work penalty capped at $1,000 and $5,000, and the 2.75% credit card surcharge. One figure in this row was NOT re-reachable this pass: any Engineering Land Development Manual amount, such as the $75.00 residential rough grading charge, sits in a separate February 2025 Engineering schedule and no working link to it was found on permits.knoxvilletn.gov; it is carried forward unchanged from the previous pass and flagged for the next one. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98), AND THE REAL SOURCE OF THE FEE FIGURES WAS FOUND AND CITED. The two URLs previously on these rows (permits.knoxvilletn.gov/Policies-Fast-Facts/Fast-Fact-Guides and /Plans-Review-Permits) were both fetched successfully and read: they are guidance pages and they carry NONE of the stored fee figures, though they do support the permit-exemption thresholds stored as text entries. The figures come from the DEVELOPMENT SERVICES FEE SCHEDULE 2024, published at permits.knoxvilletn.gov/files/assets/building/v/1/building-code-faq/2024-development-services-fee-schedule.pdf, which was downloaded and read in full this pass; fee_source_url now cites it. Every stored figure and rate re-reads verbatim on it: "BUILDING PERMITS $0.00 up to and including $500,000 | .55% of project valuation, $50 minimum"; "$500,000.01 up to and including $2,000,000 | $2,750 + .45% of project valuation over $500,000"; "IRC PLANS REVIEW All IRC projects | .025% of project valuation, $50 minimum*" with the footnote "* Minimum $35 for IRC Non-habitable accessory structures, decks and pools"; "Stand-Alone Trade Permit | .5% of the trade valuation. $55 minimum"; "REINSPECTION Per Discipline, 1st Reinspection Free | $50"; "PERMIT RENEWAL 25% of original permit fee"; and "CREDIT CARD PROCESSING All credit card payments 2.75% added to fee total". CONFIRMED CURRENT: the City's Fee Calculator page links exactly this 2024 schedule and no newer one. A separate "2024-proposed-development-services-fee-schedule.pdf" also exists on the same host and is NOT the operative document - it is the proposed version, and the stored figures match the ADOPTED one, not it. SOURCING NOTE: the $75.00 residential rough-grading figure on the retaining_wall row is not on this schedule; it belongs to Knoxville's separate Engineering Fee Schedule, which a future pass should cite explicitly.

Source: published fee schedule · Verified 9/28/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

No flat deck permit fee is published
Not published
see rule
Building permit
.55% of valuation, $50 minimum
see rule
○Plans review minimum for a deck
Flat fee $35.00
$35.00
Deck valued at $8,000, computed from the published rate
$50.00 permit plus $35.00 plans review
see rule
How this jurisdiction calculates the fee

Knoxville publishes no flat deck permit fee. A deck is priced from project valuation like other work, at .55 percent of valuation with a $50 minimum for the building permit. Plans review for decks is reduced to a $35 minimum rather than the usual $50, the same allowance given to non-habitable accessory structures and pools, and is calculated at .025 percent of valuation. Figures come from the 2024 Development Services Fee Schedule. Re-verified 2026-09-14 from the cited PDF, which still heads DEVELOPMENT SERVICES FEE SCHEDULE 2024, and the city Policies and Fast Facts page still links this exact 2024 file as its fee schedule. No successor exists: 2025-development-services-fee-schedule.pdf, 2026-development-services-fee-schedule.pdf and development-services-fee-schedule.pdf all return 404 in the same directory, so the 2024 label is current rather than stale. Every percentage and amount in this row was found on its own line, including the building permit bands (.55% with a $50 minimum, then $2,750 + .45%, $9,500 + .35%, $72,500 + .25%), IRC plans review at .025% with a $50 minimum and a $35 minimum for non-habitable accessory structures, decks and pools, trade permits at the greater of 0.15% of project valuation or .5% of trade valuation with a $55 minimum, reinspection $50 with the first free per discipline, permit renewal at 25% with a $50 minimum and $1,000 maximum, the commencing-work penalty capped at $1,000 and $5,000, and the 2.75% credit card surcharge. One figure in this row was NOT re-reachable this pass: any Engineering Land Development Manual amount, such as the $75.00 residential rough grading charge, sits in a separate February 2025 Engineering schedule and no working link to it was found on permits.knoxvilletn.gov; it is carried forward unchanged from the previous pass and flagged for the next one. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98), AND THE REAL SOURCE OF THE FEE FIGURES WAS FOUND AND CITED. The two URLs previously on these rows (permits.knoxvilletn.gov/Policies-Fast-Facts/Fast-Fact-Guides and /Plans-Review-Permits) were both fetched successfully and read: they are guidance pages and they carry NONE of the stored fee figures, though they do support the permit-exemption thresholds stored as text entries. The figures come from the DEVELOPMENT SERVICES FEE SCHEDULE 2024, published at permits.knoxvilletn.gov/files/assets/building/v/1/building-code-faq/2024-development-services-fee-schedule.pdf, which was downloaded and read in full this pass; fee_source_url now cites it. Every stored figure and rate re-reads verbatim on it: "BUILDING PERMITS $0.00 up to and including $500,000 | .55% of project valuation, $50 minimum"; "$500,000.01 up to and including $2,000,000 | $2,750 + .45% of project valuation over $500,000"; "IRC PLANS REVIEW All IRC projects | .025% of project valuation, $50 minimum*" with the footnote "* Minimum $35 for IRC Non-habitable accessory structures, decks and pools"; "Stand-Alone Trade Permit | .5% of the trade valuation. $55 minimum"; "REINSPECTION Per Discipline, 1st Reinspection Free | $50"; "PERMIT RENEWAL 25% of original permit fee"; and "CREDIT CARD PROCESSING All credit card payments 2.75% added to fee total". CONFIRMED CURRENT: the City's Fee Calculator page links exactly this 2024 schedule and no newer one. A separate "2024-proposed-development-services-fee-schedule.pdf" also exists on the same host and is NOT the operative document - it is the proposed version, and the stored figures match the ADOPTED one, not it. SOURCING NOTE: the $75.00 residential rough-grading figure on the retaining_wall row is not on this schedule; it belongs to Knoxville's separate Engineering Fee Schedule, which a future pass should cite explicitly.

Source: published fee schedule · Verified 11/12/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Stand-alone electrical permit
.5% of trade valuation, $55 minimum
see rule
Electrical permit alongside a building permit
Greater of 0.15% of project valuation or .5% of trade valuation, $55 minimum
see rule
First reinspection per discipline
Free
see rule
○Each additional reinspection
Flat fee $50.00
$50.00
How this jurisdiction calculates the fee

Electrical work is charged as a trade permit under the Knoxville 2024 Development Services Fee Schedule. When the electrical permit accompanies a building permit the fee is the greater of 0.15 percent of total project valuation or .5 percent of the electrical trade valuation, with a $55 minimum. A stand-alone electrical permit is .5 percent of the trade valuation with a $55 minimum. The same rule covers mechanical and plumbing permits. One reinspection per discipline is free and each additional reinspection costs $50. Re-verified 2026-09-14 from the cited PDF, which still heads DEVELOPMENT SERVICES FEE SCHEDULE 2024, and the city Policies and Fast Facts page still links this exact 2024 file as its fee schedule. No successor exists: 2025-development-services-fee-schedule.pdf, 2026-development-services-fee-schedule.pdf and development-services-fee-schedule.pdf all return 404 in the same directory, so the 2024 label is current rather than stale. Every percentage and amount in this row was found on its own line, including the building permit bands (.55% with a $50 minimum, then $2,750 + .45%, $9,500 + .35%, $72,500 + .25%), IRC plans review at .025% with a $50 minimum and a $35 minimum for non-habitable accessory structures, decks and pools, trade permits at the greater of 0.15% of project valuation or .5% of trade valuation with a $55 minimum, reinspection $50 with the first free per discipline, permit renewal at 25% with a $50 minimum and $1,000 maximum, the commencing-work penalty capped at $1,000 and $5,000, and the 2.75% credit card surcharge. One figure in this row was NOT re-reachable this pass: any Engineering Land Development Manual amount, such as the $75.00 residential rough grading charge, sits in a separate February 2025 Engineering schedule and no working link to it was found on permits.knoxvilletn.gov; it is carried forward unchanged from the previous pass and flagged for the next one. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98), AND THE REAL SOURCE OF THE FEE FIGURES WAS FOUND AND CITED. The two URLs previously on these rows (permits.knoxvilletn.gov/Policies-Fast-Facts/Fast-Fact-Guides and /Plans-Review-Permits) were both fetched successfully and read: they are guidance pages and they carry NONE of the stored fee figures, though they do support the permit-exemption thresholds stored as text entries. The figures come from the DEVELOPMENT SERVICES FEE SCHEDULE 2024, published at permits.knoxvilletn.gov/files/assets/building/v/1/building-code-faq/2024-development-services-fee-schedule.pdf, which was downloaded and read in full this pass; fee_source_url now cites it. Every stored figure and rate re-reads verbatim on it: "BUILDING PERMITS $0.00 up to and including $500,000 | .55% of project valuation, $50 minimum"; "$500,000.01 up to and including $2,000,000 | $2,750 + .45% of project valuation over $500,000"; "IRC PLANS REVIEW All IRC projects | .025% of project valuation, $50 minimum*" with the footnote "* Minimum $35 for IRC Non-habitable accessory structures, decks and pools"; "Stand-Alone Trade Permit | .5% of the trade valuation. $55 minimum"; "REINSPECTION Per Discipline, 1st Reinspection Free | $50"; "PERMIT RENEWAL 25% of original permit fee"; and "CREDIT CARD PROCESSING All credit card payments 2.75% added to fee total". CONFIRMED CURRENT: the City's Fee Calculator page links exactly this 2024 schedule and no newer one. A separate "2024-proposed-development-services-fee-schedule.pdf" also exists on the same host and is NOT the operative document - it is the proposed version, and the stored figures match the ADOPTED one, not it. SOURCING NOTE: the $75.00 residential rough-grading figure on the retaining_wall row is not on this schedule; it belongs to Knoxville's separate Engineering Fee Schedule, which a future pass should cite explicitly.

Source: published fee schedule · Verified 11/12/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

No fence permit fee is published
Not published
see rule
Fence up to seven feet high
No building permit required
see rule
Building permit where one is required
.55% of valuation, $50 minimum
see rule
How this jurisdiction calculates the fee

Knoxville publishes no fence permit fee. The city residential permit requirements treat a fence up to seven feet high as not needing a building permit. Where a fence is part of permitted work it is priced from project valuation like other construction, at .55 percent of valuation with a $50 minimum. The 2024 Development Services Fee Schedule lists no flat fence charge. Re-verified 2026-09-14 from the cited PDF, which still heads DEVELOPMENT SERVICES FEE SCHEDULE 2024, and the city Policies and Fast Facts page still links this exact 2024 file as its fee schedule. No successor exists: 2025-development-services-fee-schedule.pdf, 2026-development-services-fee-schedule.pdf and development-services-fee-schedule.pdf all return 404 in the same directory, so the 2024 label is current rather than stale. Every percentage and amount in this row was found on its own line, including the building permit bands (.55% with a $50 minimum, then $2,750 + .45%, $9,500 + .35%, $72,500 + .25%), IRC plans review at .025% with a $50 minimum and a $35 minimum for non-habitable accessory structures, decks and pools, trade permits at the greater of 0.15% of project valuation or .5% of trade valuation with a $55 minimum, reinspection $50 with the first free per discipline, permit renewal at 25% with a $50 minimum and $1,000 maximum, the commencing-work penalty capped at $1,000 and $5,000, and the 2.75% credit card surcharge. One figure in this row was NOT re-reachable this pass: any Engineering Land Development Manual amount, such as the $75.00 residential rough grading charge, sits in a separate February 2025 Engineering schedule and no working link to it was found on permits.knoxvilletn.gov; it is carried forward unchanged from the previous pass and flagged for the next one. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98), AND THE REAL SOURCE OF THE FEE FIGURES WAS FOUND AND CITED. The two URLs previously on these rows (permits.knoxvilletn.gov/Policies-Fast-Facts/Fast-Fact-Guides and /Plans-Review-Permits) were both fetched successfully and read: they are guidance pages and they carry NONE of the stored fee figures, though they do support the permit-exemption thresholds stored as text entries. The figures come from the DEVELOPMENT SERVICES FEE SCHEDULE 2024, published at permits.knoxvilletn.gov/files/assets/building/v/1/building-code-faq/2024-development-services-fee-schedule.pdf, which was downloaded and read in full this pass; fee_source_url now cites it. Every stored figure and rate re-reads verbatim on it: "BUILDING PERMITS $0.00 up to and including $500,000 | .55% of project valuation, $50 minimum"; "$500,000.01 up to and including $2,000,000 | $2,750 + .45% of project valuation over $500,000"; "IRC PLANS REVIEW All IRC projects | .025% of project valuation, $50 minimum*" with the footnote "* Minimum $35 for IRC Non-habitable accessory structures, decks and pools"; "Stand-Alone Trade Permit | .5% of the trade valuation. $55 minimum"; "REINSPECTION Per Discipline, 1st Reinspection Free | $50"; "PERMIT RENEWAL 25% of original permit fee"; and "CREDIT CARD PROCESSING All credit card payments 2.75% added to fee total". CONFIRMED CURRENT: the City's Fee Calculator page links exactly this 2024 schedule and no newer one. A separate "2024-proposed-development-services-fee-schedule.pdf" also exists on the same host and is NOT the operative document - it is the proposed version, and the stored figures match the ADOPTED one, not it. SOURCING NOTE: the $75.00 residential rough-grading figure on the retaining_wall row is not on this schedule; it belongs to Knoxville's separate Engineering Fee Schedule, which a future pass should cite explicitly.

Source: published fee schedule · Verified 11/12/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

No retaining wall permit fee is published
Not published
see rule
Wall up to four feet high
No building permit required
see rule
Building permit where one is required
.55% of valuation, $50 minimum
see rule
Site development work, charged separately by Engineering
Residential rough grading $75.00
see rule
How this jurisdiction calculates the fee

Knoxville publishes no retaining wall permit fee in its 2024 Development Services Fee Schedule. The city residential permit requirements treat a retaining wall up to four feet high as not needing a building permit. Walls that do require one are priced from project valuation at .55 percent with a $50 minimum. Retaining walls built as part of site development are handled by Engineering under a separate Land Development Manual fee schedule dated February 2025, which is not the building permit schedule. Re-verified 2026-09-14 from the cited PDF, which still heads DEVELOPMENT SERVICES FEE SCHEDULE 2024, and the city Policies and Fast Facts page still links this exact 2024 file as its fee schedule. No successor exists: 2025-development-services-fee-schedule.pdf, 2026-development-services-fee-schedule.pdf and development-services-fee-schedule.pdf all return 404 in the same directory, so the 2024 label is current rather than stale. Every percentage and amount in this row was found on its own line, including the building permit bands (.55% with a $50 minimum, then $2,750 + .45%, $9,500 + .35%, $72,500 + .25%), IRC plans review at .025% with a $50 minimum and a $35 minimum for non-habitable accessory structures, decks and pools, trade permits at the greater of 0.15% of project valuation or .5% of trade valuation with a $55 minimum, reinspection $50 with the first free per discipline, permit renewal at 25% with a $50 minimum and $1,000 maximum, the commencing-work penalty capped at $1,000 and $5,000, and the 2.75% credit card surcharge. One figure in this row was NOT re-reachable this pass: any Engineering Land Development Manual amount, such as the $75.00 residential rough grading charge, sits in a separate February 2025 Engineering schedule and no working link to it was found on permits.knoxvilletn.gov; it is carried forward unchanged from the previous pass and flagged for the next one. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98), AND THE REAL SOURCE OF THE FEE FIGURES WAS FOUND AND CITED. The two URLs previously on these rows (permits.knoxvilletn.gov/Policies-Fast-Facts/Fast-Fact-Guides and /Plans-Review-Permits) were both fetched successfully and read: they are guidance pages and they carry NONE of the stored fee figures, though they do support the permit-exemption thresholds stored as text entries. The figures come from the DEVELOPMENT SERVICES FEE SCHEDULE 2024, published at permits.knoxvilletn.gov/files/assets/building/v/1/building-code-faq/2024-development-services-fee-schedule.pdf, which was downloaded and read in full this pass; fee_source_url now cites it. Every stored figure and rate re-reads verbatim on it: "BUILDING PERMITS $0.00 up to and including $500,000 | .55% of project valuation, $50 minimum"; "$500,000.01 up to and including $2,000,000 | $2,750 + .45% of project valuation over $500,000"; "IRC PLANS REVIEW All IRC projects | .025% of project valuation, $50 minimum*" with the footnote "* Minimum $35 for IRC Non-habitable accessory structures, decks and pools"; "Stand-Alone Trade Permit | .5% of the trade valuation. $55 minimum"; "REINSPECTION Per Discipline, 1st Reinspection Free | $50"; "PERMIT RENEWAL 25% of original permit fee"; and "CREDIT CARD PROCESSING All credit card payments 2.75% added to fee total". CONFIRMED CURRENT: the City's Fee Calculator page links exactly this 2024 schedule and no newer one. A separate "2024-proposed-development-services-fee-schedule.pdf" also exists on the same host and is NOT the operative document - it is the proposed version, and the stored figures match the ADOPTED one, not it. SOURCING NOTE: the $75.00 residential rough-grading figure on the retaining_wall row is not on this schedule; it belongs to Knoxville's separate Engineering Fee Schedule, which a future pass should cite explicitly.

Source: published fee schedule · Verified 11/11/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

No flat shed permit fee is published
Not published
see rule
Detached accessory building of 200 square feet or less
No building permit required
see rule
Building permit where one is required
.55% of valuation, $50 minimum
see rule
○Plans review minimum for a non-habitable accessory structure
Flat fee $35.00
$35.00
How this jurisdiction calculates the fee

Knoxville publishes no flat shed permit fee. A detached accessory building of 200 square feet or less is treated as not needing a building permit under the city residential permit requirements. Larger sheds are priced from project valuation at .55 percent with a $50 minimum, and plans review for a non-habitable accessory structure carries a reduced $35 minimum instead of $50. Figures come from the 2024 Development Services Fee Schedule. Re-verified 2026-09-14 from the cited PDF, which still heads DEVELOPMENT SERVICES FEE SCHEDULE 2024, and the city Policies and Fast Facts page still links this exact 2024 file as its fee schedule. No successor exists: 2025-development-services-fee-schedule.pdf, 2026-development-services-fee-schedule.pdf and development-services-fee-schedule.pdf all return 404 in the same directory, so the 2024 label is current rather than stale. Every percentage and amount in this row was found on its own line, including the building permit bands (.55% with a $50 minimum, then $2,750 + .45%, $9,500 + .35%, $72,500 + .25%), IRC plans review at .025% with a $50 minimum and a $35 minimum for non-habitable accessory structures, decks and pools, trade permits at the greater of 0.15% of project valuation or .5% of trade valuation with a $55 minimum, reinspection $50 with the first free per discipline, permit renewal at 25% with a $50 minimum and $1,000 maximum, the commencing-work penalty capped at $1,000 and $5,000, and the 2.75% credit card surcharge. One figure in this row was NOT re-reachable this pass: any Engineering Land Development Manual amount, such as the $75.00 residential rough grading charge, sits in a separate February 2025 Engineering schedule and no working link to it was found on permits.knoxvilletn.gov; it is carried forward unchanged from the previous pass and flagged for the next one. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98), AND THE REAL SOURCE OF THE FEE FIGURES WAS FOUND AND CITED. The two URLs previously on these rows (permits.knoxvilletn.gov/Policies-Fast-Facts/Fast-Fact-Guides and /Plans-Review-Permits) were both fetched successfully and read: they are guidance pages and they carry NONE of the stored fee figures, though they do support the permit-exemption thresholds stored as text entries. The figures come from the DEVELOPMENT SERVICES FEE SCHEDULE 2024, published at permits.knoxvilletn.gov/files/assets/building/v/1/building-code-faq/2024-development-services-fee-schedule.pdf, which was downloaded and read in full this pass; fee_source_url now cites it. Every stored figure and rate re-reads verbatim on it: "BUILDING PERMITS $0.00 up to and including $500,000 | .55% of project valuation, $50 minimum"; "$500,000.01 up to and including $2,000,000 | $2,750 + .45% of project valuation over $500,000"; "IRC PLANS REVIEW All IRC projects | .025% of project valuation, $50 minimum*" with the footnote "* Minimum $35 for IRC Non-habitable accessory structures, decks and pools"; "Stand-Alone Trade Permit | .5% of the trade valuation. $55 minimum"; "REINSPECTION Per Discipline, 1st Reinspection Free | $50"; "PERMIT RENEWAL 25% of original permit fee"; and "CREDIT CARD PROCESSING All credit card payments 2.75% added to fee total". CONFIRMED CURRENT: the City's Fee Calculator page links exactly this 2024 schedule and no newer one. A separate "2024-proposed-development-services-fee-schedule.pdf" also exists on the same host and is NOT the operative document - it is the proposed version, and the stored figures match the ADOPTED one, not it. SOURCING NOTE: the $75.00 residential rough-grading figure on the retaining_wall row is not on this schedule; it belongs to Knoxville's separate Engineering Fee Schedule, which a future pass should cite explicitly.

Source: published fee schedule · Verified 11/11/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

No flat water heater permit fee is published
Not published
see rule
Stand-alone plumbing permit
.5% of trade valuation, $55 minimum
see rule
○Replacement valued at $2,000, computed from the published rate
Flat fee $55.00
$55.00
First reinspection per discipline
Free
see rule
How this jurisdiction calculates the fee

Knoxville publishes no flat water heater permit fee. Replacing a water heater needs a plumbing trade permit, priced at .5 percent of the trade valuation with a $55 minimum when it stands alone. If it accompanies a building permit the charge is the greater of 0.15 percent of total project valuation or .5 percent of the plumbing trade valuation, again with a $55 minimum. Figures come from the 2024 Development Services Fee Schedule. Re-verified 2026-09-14 from the cited PDF, which still heads DEVELOPMENT SERVICES FEE SCHEDULE 2024, and the city Policies and Fast Facts page still links this exact 2024 file as its fee schedule. No successor exists: 2025-development-services-fee-schedule.pdf, 2026-development-services-fee-schedule.pdf and development-services-fee-schedule.pdf all return 404 in the same directory, so the 2024 label is current rather than stale. Every percentage and amount in this row was found on its own line, including the building permit bands (.55% with a $50 minimum, then $2,750 + .45%, $9,500 + .35%, $72,500 + .25%), IRC plans review at .025% with a $50 minimum and a $35 minimum for non-habitable accessory structures, decks and pools, trade permits at the greater of 0.15% of project valuation or .5% of trade valuation with a $55 minimum, reinspection $50 with the first free per discipline, permit renewal at 25% with a $50 minimum and $1,000 maximum, the commencing-work penalty capped at $1,000 and $5,000, and the 2.75% credit card surcharge. One figure in this row was NOT re-reachable this pass: any Engineering Land Development Manual amount, such as the $75.00 residential rough grading charge, sits in a separate February 2025 Engineering schedule and no working link to it was found on permits.knoxvilletn.gov; it is carried forward unchanged from the previous pass and flagged for the next one. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98), AND THE REAL SOURCE OF THE FEE FIGURES WAS FOUND AND CITED. The two URLs previously on these rows (permits.knoxvilletn.gov/Policies-Fast-Facts/Fast-Fact-Guides and /Plans-Review-Permits) were both fetched successfully and read: they are guidance pages and they carry NONE of the stored fee figures, though they do support the permit-exemption thresholds stored as text entries. The figures come from the DEVELOPMENT SERVICES FEE SCHEDULE 2024, published at permits.knoxvilletn.gov/files/assets/building/v/1/building-code-faq/2024-development-services-fee-schedule.pdf, which was downloaded and read in full this pass; fee_source_url now cites it. Every stored figure and rate re-reads verbatim on it: "BUILDING PERMITS $0.00 up to and including $500,000 | .55% of project valuation, $50 minimum"; "$500,000.01 up to and including $2,000,000 | $2,750 + .45% of project valuation over $500,000"; "IRC PLANS REVIEW All IRC projects | .025% of project valuation, $50 minimum*" with the footnote "* Minimum $35 for IRC Non-habitable accessory structures, decks and pools"; "Stand-Alone Trade Permit | .5% of the trade valuation. $55 minimum"; "REINSPECTION Per Discipline, 1st Reinspection Free | $50"; "PERMIT RENEWAL 25% of original permit fee"; and "CREDIT CARD PROCESSING All credit card payments 2.75% added to fee total". CONFIRMED CURRENT: the City's Fee Calculator page links exactly this 2024 schedule and no newer one. A separate "2024-proposed-development-services-fee-schedule.pdf" also exists on the same host and is NOT the operative document - it is the proposed version, and the stored figures match the ADOPTED one, not it. SOURCING NOTE: the $75.00 residential rough-grading figure on the retaining_wall row is not on this schedule; it belongs to Knoxville's separate Engineering Fee Schedule, which a future pass should cite explicitly.

Source: published fee schedule · Verified 11/12/2026

See the full write-up: Knoxville building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.