B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Dallas County, Texas Building Permit Cost Calculator

Estimates permit cost in Dallas County from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Notice of Residential
Flat fee $50.00
$50.00
○Development Permit Level 1
Flat fee $35.00
$35.00
○Development Permit Level 2 & 3
Flat fee $100.00
$100.00
○Development Permit Level 4
Flat fee $250.00
$250.00
○Driveway / Culvert permit
Flat fee $75.00
$75.00
○Residential septic inspection (includes $10 state fee)
Flat fee $260.00
$260.00
How this jurisdiction calculates the fee

Dallas County charges no building-code permit fee for residential construction, because it does not review or inspect houses against a building code. Its published DUAS fee schedule is a development fee schedule: Development Permit Level 1 is $35.00, Levels 2 and 3 are $100.00 and Level 4 is $250.00, and the residential intake is the Notice of Residential at $50.00. The schedule does carry a line labelled 'Residential Building Permit - $100.00', but the county's own application list contains no standalone residential building permit and routes new residential construction, additions and major renovations to the Notice of Residential Construction application, so treat the $100.00 line as a development-permit-level charge rather than evidence of code enforcement, and confirm with DUAS. Septic is priced separately by Dallas County Health and Human Services Environmental Health.

Source: published fee schedule · Verified 9/15/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Notice of Residential
Flat fee $50.00
$50.00
○Development Permit Level 1
Flat fee $35.00
$35.00
○Development Permit Level 2 & 3
Flat fee $100.00
$100.00
○Development Permit Level 4
Flat fee $250.00
$250.00
○Driveway / Culvert permit
Flat fee $75.00
$75.00
○Residential septic inspection (includes $10 state fee)
Flat fee $260.00
$260.00
How this jurisdiction calculates the fee

Dallas County charges no building-code permit fee for residential construction, because it does not review or inspect houses against a building code. Its published DUAS fee schedule is a development fee schedule: Development Permit Level 1 is $35.00, Levels 2 and 3 are $100.00 and Level 4 is $250.00, and the residential intake is the Notice of Residential at $50.00. The schedule does carry a line labelled 'Residential Building Permit - $100.00', but the county's own application list contains no standalone residential building permit and routes new residential construction, additions and major renovations to the Notice of Residential Construction application, so treat the $100.00 line as a development-permit-level charge rather than evidence of code enforcement, and confirm with DUAS. Septic is priced separately by Dallas County Health and Human Services Environmental Health.

Source: published fee schedule · Verified 9/15/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Development Permit Level 1
Flat fee $35.00
$35.00
○Development Permit Level 2 & 3
Flat fee $100.00
$100.00
○Notice of Residential
Flat fee $50.00
$50.00
○Right of Way / Utility permit
Flat fee $75.00
$75.00
How this jurisdiction calculates the fee

No county electrical permit fee exists, since the county issues no electrical permits. The DUAS fee schedule contains only development, platting and access charges. A Meter Release application exists for utility connection clearance but carries no separate published fee on the schedule; the amounts below are the county's actual published development charges.

Source: published fee schedule · Verified 9/15/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Fence outside a mapped floodplain
Flat fee $0.00
$0.00
○Development Permit Level 1 (floodplain fence)
Flat fee $35.00
$35.00
○Development Permit Level 2 & 3
Flat fee $100.00
$100.00
○Development Permit Level 4
Flat fee $250.00
$250.00
How this jurisdiction calculates the fee

No county fee applies to an ordinary fence outside a floodplain, since no permit is required. A fence within a mapped floodplain is handled under the Development Permit / Floodplain Development application, priced by level: Level 1 at $35.00, Levels 2 and 3 at $100.00 and Level 4 at $250.00. There is no separate fence permit fee published by the county.

Source: published fee schedule · Verified 9/15/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Development Permit Level 1
Flat fee $35.00
$35.00
○Notice of Residential
Flat fee $50.00
$50.00
○Development Permit Level 2 & 3
Flat fee $100.00
$100.00
How this jurisdiction calculates the fee

No Dallas County fee applies to re-roofing, because the county issues no roofing permit in the unincorporated area. The published DUAS charges below are the development permits the county does levy, none of which is triggered by replacing a roof covering.

Source: published fee schedule · Verified 9/15/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Notice of Residential
Flat fee $50.00
$50.00
○Development Permit Level 1
Flat fee $35.00
$35.00
○Development Permit Level 2 & 3
Flat fee $100.00
$100.00
○Development Permit Level 4
Flat fee $250.00
$250.00
○Driveway / Culvert permit
Flat fee $75.00
$75.00
○Residential septic inspection (includes $10 state fee)
Flat fee $260.00
$260.00
How this jurisdiction calculates the fee

Dallas County charges no building-code permit fee for residential construction, because it does not review or inspect houses against a building code. Its published DUAS fee schedule is a development fee schedule: Development Permit Level 1 is $35.00, Levels 2 and 3 are $100.00 and Level 4 is $250.00, and the residential intake is the Notice of Residential at $50.00. The schedule does carry a line labelled 'Residential Building Permit - $100.00', but the county's own application list contains no standalone residential building permit and routes new residential construction, additions and major renovations to the Notice of Residential Construction application, so treat the $100.00 line as a development-permit-level charge rather than evidence of code enforcement, and confirm with DUAS. Septic is priced separately by Dallas County Health and Human Services Environmental Health.

Source: published fee schedule · Verified 9/15/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Notice of Residential
Flat fee $50.00
$50.00
○Development Permit Level 1
Flat fee $35.00
$35.00
○Development Permit Level 2 & 3
Flat fee $100.00
$100.00
○Development Permit Level 4
Flat fee $250.00
$250.00
○Driveway / Culvert permit
Flat fee $75.00
$75.00
○Residential septic inspection (includes $10 state fee)
Flat fee $260.00
$260.00
How this jurisdiction calculates the fee

Dallas County charges no building-code permit fee for residential construction, because it does not review or inspect houses against a building code. Its published DUAS fee schedule is a development fee schedule: Development Permit Level 1 is $35.00, Levels 2 and 3 are $100.00 and Level 4 is $250.00, and the residential intake is the Notice of Residential at $50.00. The schedule does carry a line labelled 'Residential Building Permit - $100.00', but the county's own application list contains no standalone residential building permit and routes new residential construction, additions and major renovations to the Notice of Residential Construction application, so treat the $100.00 line as a development-permit-level charge rather than evidence of code enforcement, and confirm with DUAS. Septic is priced separately by Dallas County Health and Human Services Environmental Health.

Source: published fee schedule · Verified 9/15/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Residential septic inspection (includes $10 state fee)
Flat fee $260.00
$260.00
○Residential septic re-inspection
Flat fee $60.00
$60.00
○Expedited septic tank inspection
Flat fee $100.00
$100.00
○Commercial septic inspection (includes $10 state fee)
Flat fee $310.00
$310.00
How this jurisdiction calculates the fee

There is no county water heater or plumbing permit fee because no such permit is issued. The county's published plumbing-adjacent charges are its septic inspection fees through Environmental Health: a residential septic inspection is $260.00 including a $10.00 state fee, residential re-inspection is $60.00, a commercial inspection is $310.00 and an expedited septic tank inspection is $100.00.

Source: published fee schedule · Verified 9/15/2026

See the full write-up: Dallas County building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.