Houston, Texas Building Permit Cost Calculator
Estimates permit cost in Houston from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum permit fee Flat fee $91.06 | $91.06 |
○Administrative fee (non-refundable) Flat fee $33.56 | $33.56 |
Building permit plan review (non-refundable) · add-on 25% of estimated building permit fee — select the permit fee line above to calculate | see rule |
New one- and two-family dwellings and townhouses 1,800 square feet or less 50 percent discount on permit fees | see rule |
○Certificate of Occupancy Flat fee $94.00 | $94.00 |
○Reinspection fee Flat fee $94.00 | $94.00 |
How this jurisdiction calculates the fee
Structural permit fees for one- and two-family dwellings are set by square-foot tier tables organized by construction type, with a base charge per tier plus an incremental charge for each additional increment of floor area; a non-refundable administrative fee and a plan review fee also apply.
Source: published fee schedule · Verified 9/18/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum Permit Fee Flat fee $91.06 | $91.06 |
○Administrative Fee (Non-Refundable) Flat fee $33.56 | $33.56 |
Building Permit Plan Review (Non-Refundable) · add-on 25% of estimated building permit fee — select the permit fee line above to calculate | see rule |
○One- and Two-Family Residential Dwelling Structural Building Permit, Type VB Construction Tier 1: BASE CHARGE Flat fee $47.00 | $47.00 |
○One- and Two-Family Residential Dwelling Structural Building Permit, Type VB Construction Tier 2: BASE CHARGE Flat fee $47.00 | $47.00 |
○One- and Two-Family Residential Dwelling Structural Building Permit, Type VB Construction Tier 2: INCREMENTAL CHARGE for each additional 8.17 square feet or fraction thereof after the first 57.16 square feet Flat fee $5.36 | $5.36 |
○Reinspection Fee Flat fee $94.00 | $94.00 |
Investigation Fee (Unpermitted Construction - per Occurrence), in addition to the permit fee $333.42 minimum or double fee whichever is greater | see rule |
How this jurisdiction calculates the fee
The 2026 Building Code Enforcement Permit Fee Schedule carries no line item named deck. A deck at a one- or two-family dwelling is permitted as a residential structural/building permit, and those fees are set by square-footage tier tables rather than a flat fee. There is one table per construction type (IA, IB, IIA, IIB, IIIA, IIIB, IV, VA and VB), and within each table each tier has a base charge plus, above the first tier, an incremental charge for each additional increment of floor area beyond a stated threshold. All permit fees are subject to the minimum permit fee and to the non-refundable administrative fee, and plans submitted for a building permit are charged a non-refundable plan review fee calculated as a percentage of the estimated building permit fee. Figures below are from the Type VB construction table, the type most commonly used for wood-framed housing.
Source: published fee schedule · Verified 10/7/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum permit fee Flat fee $91.06 | $91.06 |
○Outlets, each Flat fee $1.34 | $1.34 |
○Fixtures, each Flat fee $1.34 | $1.34 |
○Meter loop and service, up to and including 50kW Flat fee $94.00 | $94.00 |
○Panels with eight or more circuits, each Flat fee $9.39 | $9.39 |
○EV charging outlet, Level 2 Flat fee $100.71 | $100.71 |
○Administrative fee (non-refundable) Flat fee $33.56 | $33.56 |
How this jurisdiction calculates the fee
Electrical permit fees are itemized per device, outlet, fixture, panel and service, subject to a minimum permit fee plus the administrative fee.
Source: published fee schedule · Verified 9/18/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○First 100 lineal feet or part thereof Flat fee $73.85 | $73.85 |
○Each additional 100 lineal feet or part thereof Flat fee $11.41 | $11.41 |
○Administrative fee (non-refundable) Flat fee $33.56 | $33.56 |
How this jurisdiction calculates the fee
Fence permit fees are charged by lineal feet of fence, plus the non-refundable administrative fee and a plan review fee.
Source: published fee schedule · Verified 9/17/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Administrative fee (non-refundable) Flat fee $33.56 | $33.56 |
How this jurisdiction calculates the fee
A non-refundable administrative fee applies in addition to the permit fee established by the adopted fee schedule.
Source: published fee schedule · Verified 9/17/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum Permit Fee (all permit fees are subject to this) Flat fee $91.06 | $91.06 |
○Administrative Fee (Non-Refundable; all permit fees are subject to this) Flat fee $33.56 | $33.56 |
Building Permit Plan Review (Non-Refundable) · add-on 25% of estimated building permit fee — select the permit fee line above to calculate | see rule |
○Reinspection Fee Flat fee $94.00 | $94.00 |
○Grading Flat fee $94.00 | $94.00 |
How this jurisdiction calculates the fee
No retaining-wall-specific price is published. The 2026 Building Code Enforcement Permit Fee Schedule was read in full and carries no line item for a retaining wall under Structural Permit Fees or anywhere else, although a permit is required for walls over 4 feet in height. What can be stated from the schedule is the charges that attach to any Houston permit: the schedule notes that all permit fees are subject to the minimum permit fee and the non-refundable administrative fee, and that plans submitted for a building permit are charged a non-refundable plan review fee calculated as a percentage of the estimated building permit fee. The underlying permit fee itself is set either from the commercial valuation table or, for one- and two-family residential projects, from the square-footage tier tables by construction type; the schedule does not state which applies to a retaining wall, so no amount is recorded for it here. Confirm the charge with Houston Public Works Building Code Enforcement before submitting.
Source: published fee schedule · Verified 10/7/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum Permit Fee Flat fee $91.06 | $91.06 |
○Administrative Fee (Non-Refundable) Flat fee $33.56 | $33.56 |
Building Permit Plan Review (Non-Refundable) · add-on 25% of estimated building permit fee — select the permit fee line above to calculate | see rule |
○One- and Two-Family Residential Dwelling Structural Building Permit, Type VB Construction Tier 1: BASE CHARGE Flat fee $47.00 | $47.00 |
○One- and Two-Family Residential Dwelling Structural Building Permit, Type VB Construction Tier 2: BASE CHARGE Flat fee $47.00 | $47.00 |
○One- and Two-Family Residential Dwelling Structural Building Permit, Type VB Construction Tier 2: INCREMENTAL CHARGE for each additional 8.17 square feet or fraction thereof after the first 57.16 square feet Flat fee $5.36 | $5.36 |
Prefabricated Buildings or Modular buildings, plan review See Valuation Table | see rule |
○Reinspection Fee Flat fee $94.00 | $94.00 |
How this jurisdiction calculates the fee
The 2026 Building Code Enforcement Permit Fee Schedule carries no line item named shed or detached accessory structure. A shed at a one- or two-family dwelling is permitted as a residential structural/building permit, and those fees are set by square-footage tier tables rather than a flat fee. There is one table per construction type (IA, IB, IIA, IIB, IIIA, IIIB, IV, VA and VB), and within each table each tier has a base charge plus, above the first tier, an incremental charge for each additional increment of floor area beyond a stated threshold. All permit fees are subject to the minimum permit fee and to the non-refundable administrative fee, and plans submitted for a building permit are charged a non-refundable plan review fee calculated as a percentage of the estimated building permit fee. Figures below are from the Type VB construction table, the type most commonly used for wood-framed structures.
Source: published fee schedule · Verified 10/7/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Fixtures (Plumbing) - one to three Flat fee $34.24 | $34.24 |
○Fixtures (Plumbing) - each additional Flat fee $11.41 | $11.41 |
○Minimum plumbing permit fee Flat fee $97.56 | $97.56 |
○Administrative fee (non-refundable) Flat fee $33.56 | $33.56 |
How this jurisdiction calculates the fee
Water heater work is permitted under the plumbing schedule as a plumbing fixture. The 2026 Building Code Enforcement Permit Fee Schedule carries no water-heater line of its own; the governing line is "Fixtures (Plumbing)", charged $34.24 for one to three and $11.41 for each additional, subject to the plumbing minimum permit fee plus the non-refundable administrative fee. Note the separate "Wall Heater" line in the same table carries the identical $34.24 / $11.41 amounts and is a different fee; it is not the water-heater fee.
Source: published fee schedule · Verified 9/17/2026
See the full write-up: Houston building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.