B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Fort Worth, Texas Building Permit Cost Calculator

Estimates permit cost in Fort Worth from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Table 1-C-3, R use groups, 0 to 65 sq. ft. (Group R-3 up to 500 sq. ft. in parentheses)
Flat fee $102.00
$102.00
Table 1-C-3, over 65 to 700 sq. ft.
$102.00 ($61.01) for first 65 square feet, plus $0.74 ($0.45) for each additional square foot to and including 700
see rule
Table 1-C-3, over 700 to 1,400 sq. ft.
$570.00 for first 700 square feet, plus $0.53 for each additional square foot to and including 1,400
see rule
Table 1-C-3, over 1,400 to 2,700 sq. ft.
$937.00 for first 1,400 square feet, plus $0.39 for each additional square foot to and including 2,700
see rule
Table 1-C-3, over 2,700 to 11,800 sq. ft.
$1,446.00 for first 2,700 square feet, plus $0.35 for each additional square foot to and including 11,800
see rule
Table 1-C-3, over 11,800 to 24,500 sq. ft.
$4,610.00 for the first 11,800 square feet, plus $0.27 for each additional square foot to and including 24,500
see rule
Table 1-C-3, over 24,500 sq. ft.
$8,001.00 for the first 24,500 square feet, plus $0.20 for each additional square foot
see rule
○Permit application fee, applicable to all permit types excluding signs
Flat fee $33.08
$33.08
○Technology fee applicable to all applications/permits
Flat fee $16.87
$16.87
○Paper filing fee
Flat fee $33.08
$33.08
○Reinspection fee
Flat fee $66.15
$66.15
○Plan review deposit, those requiring circulation
Flat fee $291.00
$291.00
○Plan review deposit, those without circulation
Flat fee $113.00
$113.00
○Temporary or limited certificate of occupancy
Flat fee $397.00
$397.00
○Inspections outside of normal business hours, per hour (minimum of 4 hours)
Flat fee $140.00
$140.00
○Additional plan review required by changes, additions or revisions, first revision, per hour, half hour minimum
Flat fee $66.15
$66.15
○Annual contractor registration fee, building and sign
Flat fee $178.00
$178.00
○Demolition of structure 45 years or older
Flat fee $59.06
$59.06
How this jurisdiction calculates the fee

Priced from Table 1-C-3, the R use group table, on new square footage rather than on valuation. New square footage for Group R-3 up to and including 500 square feet is charged the lower figure printed in parentheses. A $33.08 permit application fee and a $16.87 technology fee are added. The plan review deposit is not required for additions and remodels to existing Group R-3 occupancies, nor for additions, remodels or new construction of their accessory structures. Reinspections are $66.15. For residential projects (one- and two-family dwellings and townhouses regulated by the IRC, and their accessory structures), third party plan review or inspection reduces the permit fee by a factor of 0.35 (both by third party), 0.70 (plan review third party, inspections city) or 0.55 (plan review city, inspections third party). REWRITTEN 2026-10-01 FROM THE SUCCESSOR ORDINANCE, WHICH TOOK EFFECT TODAY: Ordinance No. 26-28781 (73 pages, 9,360,201 bytes, PDF CreationDate and ModDate 2026-09-24), which states both "This Ordinance shall take effect on October 1, 2026" and "EFFECTIVE: October 1, 2026", replacing Ordinance No. 27191-09-2024 (FY2025, effective October 1, 2024) that this row previously carried. The uplift is across-the-board at roughly five percent and every figure above moved except the $16.87 technology fee. Prior values, for the record: Table 1-C-3 bands $96.84 ($58.10) / $0.70 ($0.42) / $542.44 / $0.50 / $892.25 / $0.37 / $1,376.58 / $0.33 / $4,390.25 / $0.25 / $7,619.23 / $0.19; permit application and paper filing $31.50; reinspection, unspecified inspection and first-revision review $63.00; plan review deposit $276.75 and $106.87; temporary or limited certificate of occupancy $378.00; after-hours inspection $112.50; contractor registration building and sign $168.75; demolition of a structure 45 years or older $56.25. METHOD NOTE, AND THE REASON THIS WAS A LIVE DEFECT RATHER THAN A FUTURE ONE: the cited /v/9/ asset path still returns HTTP 200 but now 302-redirects to /v/10/.../f/fee-schedule-oct-2026.pdf, so the URL never changed and only the bytes behind it did; a reachability check passes this row while the figures underneath it have all moved. /v/11/ and /v/12/ return a clean 404, confirming v/10 is newest. The text layer prints amounts with a space inside them ("102. 00", "1, 446. 00"), so collapse whitespace around the decimal point and the thousands comma before matching or every figure reads as absent.

Source: published fee schedule · Verified 10/1/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Table 1A-1 residential remodel, 1 trade
Flat fee $119.00
$119.00
○Table 1A-1 residential remodel, 2 trades
Flat fee $238.00
$238.00
○Table 1A-1 residential remodel, 3 trades
Flat fee $357.00
$357.00
○Table 1A-1 residential remodel, 4 trades
Flat fee $476.00
$476.00
○Table 1A-1 residential remodel, 5 trades
Flat fee $595.00
$595.00
○Table No. 1-A valuation, 0 to $2,000.00
Flat fee $102.00
$102.00
Table No. 1-A valuation, $2,000.00 to $25,000.00
$102.00 for first $2,000, plus $20.33 for each additional $1,000.00 or fraction thereof to and including $25,000.00
see rule
○Permit application fee
Flat fee $33.08
$33.08
○Technology fee
Flat fee $16.87
$16.87
○Reinspection fee
Flat fee $66.15
$66.15
How this jurisdiction calculates the fee

A deck is a residential remodel, priced from Table 1A-1 on the number of trades involved, with Table No. 1-A valuation pricing available for work that does not fall under the trade count. A $33.08 permit application fee and a $16.87 technology fee are added; reinspections are $66.15. Third party plan review or inspection reduces the permit fee by a factor of 0.35, 0.70 or 0.55 for residential projects. REWRITTEN 2026-10-01 FROM THE SUCCESSOR ORDINANCE, WHICH TOOK EFFECT TODAY: Ordinance No. 26-28781, which states "This Ordinance shall take effect on October 1, 2026" and "EFFECTIVE: October 1, 2026", replacing Ordinance No. 27191-09-2024 that this row previously carried. Every figure moved except the $16.87 technology fee. Prior values: Table 1A-1 trades $112.50 / $225.00 / $337.50 / $450.00 / $562.50; Table 1-A $96.84 and $19.36; permit application $31.50; reinspection $63.00. The cited /v/9/ asset path still returns HTTP 200 but now 302-redirects to /v/10/.../f/fee-schedule-oct-2026.pdf, so only the bytes behind the URL changed; collapse whitespace around decimal points and thousands commas before matching amounts, because the text layer prints "102. 00" and "1, 446. 00".

Source: published fee schedule · Verified 10/1/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Light fixtures, outlets, switches and receptacles, up to 100, each
Flat fee $0.54
$0.54
○Light fixtures, outlets, switches and receptacles, over 100, each
Flat fee $0.45
$0.45
○Ceiling fan, vent fan, smoke detector, bath heater, disposal, compactor, dishwasher, washing machine, each
Flat fee $1.49
$1.49
○Water heater, dryer, range
Flat fee $2.99
$2.99
○Air conditioner, 3 to 5 ton
Flat fee $6.10
$6.10
○Air conditioner, over 5 ton to 7 1/2 ton
Flat fee $9.85
$9.85
○Air conditioner, over 7 1/2 ton
Flat fee $19.75
$19.75
○Heating unit, electric, per KW
Flat fee $1.01
$1.01
○Services and subpanels, 60 amps to 100 amps
Flat fee $19.75
$19.75
○Services and subpanels, over 100 amps to 150 amps
Flat fee $29.17
$29.17
○Services and subpanels, over 150 amps
Flat fee $39.53
$39.53
○Transformers, generators and welders, 0 to 10 KW
Flat fee $6.10
$6.10
○Construction pole
Flat fee $29.17
$29.17
○Swimming pools
Flat fee $56.48
$56.48
○Submeters, buildings, leases, apartments, etc., per submeter
Flat fee $20.71
$20.71
○Temporary power letters, per bank of six meters
Flat fee $43.66
$43.66
○Permit application fee
Flat fee $33.08
$33.08
○Technology fee
Flat fee $16.87
$16.87
○Reinspection fee
Flat fee $66.15
$66.15
How this jurisdiction calculates the fee

Electrical work is priced item by item from the electrical schedule: per device for light fixtures, outlets, switches and receptacles, a flat rate per fixed appliance, and a banded rate for services and subpanels by amperage. A $33.08 permit application fee and a $16.87 technology fee are added; reinspections are $66.15. When inspections are performed by a third party the permit fee is reduced by multiplying by 0.35. REWRITTEN 2026-10-01 FROM THE SUCCESSOR ORDINANCE, WHICH TOOK EFFECT TODAY: Ordinance No. 26-28781, effective October 1, 2026, replacing Ordinance No. 27191-09-2024. Every figure moved except the $16.87 technology fee. Prior values: $0.51 / $0.42 per device; $1.42 fixed appliances; $2.85 water heater, dryer, range; air conditioner $5.81 / $9.38 / $18.81; electric heating unit $0.96 per KW; services and subpanels $18.81 / $27.78 / $37.65; transformers 0 to 10 KW $5.81; construction pole $27.78; swimming pools $53.79; submeters $19.72; temporary power letters $41.58; permit application $31.50; reinspection $63.00. The cited /v/9/ asset path still returns HTTP 200 but now 302-redirects to /v/10/.../f/fee-schedule-oct-2026.pdf.

Source: published fee schedule · Verified 10/1/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Table No. 1-A valuation, 0 to $2,000.00
Flat fee $102.00
$102.00
Table No. 1-A valuation, $2,000.00 to $25,000.00
$102.00 for first $2,000, plus $20.33 for each additional $1,000.00 or fraction thereof to and including $25,000.00
see rule
○Permit application fee
Flat fee $33.08
$33.08
○Technology fee
Flat fee $16.87
$16.87
○Reinspection fee
Flat fee $66.15
$66.15
○Floodplain development permit, other development, minor improvements (Stormwater, not a building permit fee)
Flat fee $0.00
$0.00
How this jurisdiction calculates the fee

A fence is priced from Table No. 1-A on the total valuation of the work, because it is an accessory structure with no square footage of its own. A $33.08 permit application fee and a $16.87 technology fee are added; reinspections are $66.15. Third party plan review or inspection reduces the permit fee by a factor of 0.35, 0.70 or 0.55 for residential projects. Do not mistake the Stormwater line for a building fee: a Floodplain Development Permit for Other Development, Minor Improvements is $0.00 and lists fences, walls, docks and retaining walls under 4 feet high as examples. REWRITTEN 2026-10-01 FROM THE SUCCESSOR ORDINANCE, WHICH TOOK EFFECT TODAY: Ordinance No. 26-28781, effective October 1, 2026, replacing Ordinance No. 27191-09-2024. Prior values: Table 1-A $96.84 and $19.36; permit application $31.50; reinspection $63.00. The $16.87 technology fee is unchanged. CARRIED, NOT RE-VERIFIED THIS PASS: the $0.00 floodplain development permit line comes from the separate Stormwater fee schedule and the word "floodplain" does not appear anywhere in Ordinance No. 26-28781, so this pass could not confirm it against the cited document; it is a $0.00 line and was left exactly as stored rather than guessed at. The cited /v/9/ asset path still returns HTTP 200 but now 302-redirects to /v/10/.../f/fee-schedule-oct-2026.pdf.

Source: published fee schedule · Verified 10/1/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Table 1A-1 residential remodel, 1 trade
Flat fee $119.00
$119.00
○Table 1A-1 residential remodel, 2 trades
Flat fee $238.00
$238.00
○Permit application fee
Flat fee $33.08
$33.08
○Technology fee
Flat fee $16.87
$16.87
○Reinspection fee
Flat fee $66.15
$66.15
○Inspections outside of normal business hours, per hour (minimum of 4 hours)
Flat fee $140.00
$140.00
How this jurisdiction calculates the fee

Reroofing a one- or two-family dwelling is a residential remodel priced from Table 1A-1 on the number of trades, which for a roof replacement is normally one. A $33.08 permit application fee and a $16.87 technology fee are added; reinspections are $66.15. Third party plan review or inspection reduces the permit fee by a factor of 0.35, 0.70 or 0.55 for residential projects. REWRITTEN 2026-10-01 FROM THE SUCCESSOR ORDINANCE, WHICH TOOK EFFECT TODAY: Ordinance No. 26-28781, effective October 1, 2026, replacing Ordinance No. 27191-09-2024. Every figure moved except the $16.87 technology fee. Prior values: 1 trade $112.50, 2 trades $225.00, permit application $31.50, reinspection $63.00, after-hours inspection $112.50. The after-hours line is now stated as $140.00 per hour with a four-hour minimum, where the previously stored label recorded the minimum as unreadable. The cited /v/9/ asset path still returns HTTP 200 but now 302-redirects to /v/10/.../f/fee-schedule-oct-2026.pdf.

Source: published fee schedule · Verified 10/1/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Table No. 1-A valuation, 0 to $2,000.00
Flat fee $102.00
$102.00
Table No. 1-A valuation, $2,000.00 to $25,000.00
$102.00 for first $2,000, plus $20.33 for each additional $1,000.00 or fraction thereof to and including $25,000.00
see rule
Table No. 1-A valuation, $25,000.00 to $50,000.00
$570.00 for first $25,000, plus $14.68 for each additional $1,000.00 or fraction thereof to and including $50,000.00
see rule
○Permit application fee
Flat fee $33.08
$33.08
○Technology fee
Flat fee $16.87
$16.87
○Reinspection fee
Flat fee $66.15
$66.15
○Floodplain development permit, other development, minor improvements (Stormwater, not a building permit fee)
Flat fee $0.00
$0.00
How this jurisdiction calculates the fee

A retaining wall is priced from Table No. 1-A on the total valuation of the work, as an accessory structure with no square footage. A $33.08 permit application fee and a $16.87 technology fee are added; reinspections are $66.15. Third party plan review or inspection reduces the permit fee by a factor of 0.35, 0.70 or 0.55 for residential projects. A separate Stormwater charge, the Floodplain Development Permit for Other Development, Minor Improvements, is $0.00 and names retaining walls under 4 feet high among its examples; that is a floodplain permit, not a building permit fee. REWRITTEN 2026-10-01 FROM THE SUCCESSOR ORDINANCE, WHICH TOOK EFFECT TODAY: Ordinance No. 26-28781, effective October 1, 2026, replacing Ordinance No. 27191-09-2024. Prior values: Table 1-A $96.84, $19.36, $542.44 and $13.98; permit application $31.50; reinspection $63.00. The $16.87 technology fee is unchanged. CARRIED, NOT RE-VERIFIED THIS PASS: the $0.00 floodplain development permit line comes from the separate Stormwater fee schedule and the word "floodplain" does not appear anywhere in Ordinance No. 26-28781, so this pass could not confirm it against the cited document; it is a $0.00 line and was left exactly as stored. The cited /v/9/ asset path still returns HTTP 200 but now 302-redirects to /v/10/.../f/fee-schedule-oct-2026.pdf.

Source: published fee schedule · Verified 10/1/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Table 1-C-4, U use group, 0 to 175 sq. ft. (accessory to existing R-3 in parentheses)
Flat fee $102.00
$102.00
Table 1-C-4, over 175 to 2,500 sq. ft.
$102.00 for first 175 square feet, plus $0.20 for each additional square foot to and including 2,500
see rule
Table 1-C-4, over 2,500 to 5,200 sq. ft.
$570.00 for first 2,500 square feet, plus $0.13 for each additional square foot to and including 5,200
see rule
Table 1-C-4, over 5,200 to 10,200 sq. ft.
$937.00 for first 5,200 square feet, plus $0.11 for each additional square foot to and including 10,200
see rule
Table 1-C-4, over 10,200 to 46,500 sq. ft.
$1,446.00 for first 10,200 square feet, plus $0.09 for each additional square foot to and including 46,500
see rule
Table 1-C-4, over 46,500 to 96,500 sq. ft. (second item labelled c in the source)
$4,610.00 for the first 46,500 square feet, plus $0.07 for each additional square foot to and including 96,500
see rule
Table 1-C-4, over 96,500 sq. ft.
$8,001.00 for the first 96,500 square feet, plus $0.06 for each additional square foot
see rule
○Permit application fee
Flat fee $33.08
$33.08
○Technology fee
Flat fee $16.87
$16.87
○Reinspection fee
Flat fee $66.15
$66.15
How this jurisdiction calculates the fee

A shed or other detached accessory building is a Group U use and is priced from Table 1-C-4 on new square footage. New square footage for accessory Group U uses associated with an existing R-3 is charged the lower figure printed in parentheses. A $33.08 permit application fee and a $16.87 technology fee are added; reinspections are $66.15. The plan review deposit is not required for new construction of accessory structures to existing Group R-3 occupancies. Third party plan review or inspection reduces the permit fee by a factor of 0.35, 0.70 or 0.55 for residential projects. REWRITTEN 2026-10-01 FROM THE SUCCESSOR ORDINANCE, WHICH TOOK EFFECT TODAY: Ordinance No. 26-28781, effective October 1, 2026, replacing Ordinance No. 27191-09-2024. Every figure moved except the $16.87 technology fee. Prior values: Table 1-C-4 bands $96.84 ($58.10) / $0.19 / $542.44 / $0.12 / $892.25 / $0.10 / $1,376.58 / $0.08 / $4,390.25 / $0.06 / $7,619.23 / $0.05; permit application $31.50; reinspection $63.00. The source still mislabels the second sub-item of the 46,500 to 96,500 band as "c" rather than "b". The cited /v/9/ asset path still returns HTTP 200 but now 302-redirects to /v/10/.../f/fee-schedule-oct-2026.pdf.

Source: published fee schedule · Verified 10/1/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Table 1-I plumbing, first fixture or appliance
Flat fee $10.34
$10.34
○Table 1-I plumbing, additional fixtures or appliances (each)
Flat fee $4.22
$4.22
○Table 1-I plumbing, gas service
Flat fee $10.34
$10.34
○Table 1-I plumbing, temporary gas service
Flat fee $10.34
$10.34
○Table 1-I plumbing, backflow preventer
Flat fee $10.34
$10.34
○Table 1-I plumbing, water service, first 120 feet
Flat fee $10.34
$10.34
○Electrical schedule, fixed appliances, water heater
Flat fee $2.99
$2.99
○Electrical schedule, fixed appliances, heating unit, gas
Flat fee $2.99
$2.99
○Permit application fee
Flat fee $33.08
$33.08
○Technology fee
Flat fee $16.87
$16.87
○Reinspection fee
Flat fee $66.15
$66.15
How this jurisdiction calculates the fee

A water heater replacement is priced per fixture or appliance from Table 1-I, the plumbing schedule, with the electrical connection priced separately from the fixed-appliance lines of the electrical schedule. A $33.08 permit application fee and a $16.87 technology fee are added; reinspections are $66.15. When inspections are performed by a third party the permit fee is reduced by multiplying by 0.35. REWRITTEN 2026-10-01 FROM THE SUCCESSOR ORDINANCE, WHICH TOOK EFFECT TODAY: Ordinance No. 26-28781, effective October 1, 2026, replacing Ordinance No. 27191-09-2024. Every figure moved except the $16.87 technology fee. Prior values: plumbing first fixture, gas service, temporary gas service, backflow preventer and water service first 120 feet all $9.85; additional fixtures $4.02; electrical water heater and gas heating unit $2.85; permit application $31.50; reinspection $63.00. The cited /v/9/ asset path still returns HTTP 200 but now 302-redirects to /v/10/.../f/fee-schedule-oct-2026.pdf.

Source: published fee schedule · Verified 10/1/2026

See the full write-up: Fort Worth building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.