Irving, Texas Building Permit Cost Calculator
Estimates permit cost in Irving from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Single-family dwelling, townhouse, duplex (new construction) - Permit $0.40 x 2,000 = $800.00 | $800.00 |
○Single-family dwelling, townhouse, duplex (new construction) - Plan review $0.10 x 2,000 = $200.00 | $200.00 |
○Residential alterations, detached residential garages, fire repair $0.30 x 2,000 = $600.00 | $600.00 |
Residential additions (any enclosed square footage) Same per-square-foot permit and plan review rates as new construction; Minimum fee $280 | see rule |
○Commercial building - Permit $0.45 x 2,000 = $900.00 | $900.00 |
Commercial plan review · add-on 25% of the permit fee — select the permit fee line above to calculate | see rule |
Shell building · add-on 50% of the commercial building permit fee — select the permit fee line above to calculate | see rule |
Interior finish, repairs, or remodel · add-on 80% of the commercial building permit fee — select the permit fee line above to calculate | see rule |
○Re-Inspections Flat fee $75.00 | $75.00 |
How this jurisdiction calculates the fee
Building permit fees are charged per square foot of the area of work by work type, with stated minimum fees, under the City of Irving consolidated fee schedule (effective October 15, 2022, updated fees effective February 13, 2026). Residential new construction carries a separate per-square-foot plan review fee; commercial plan review is charged as a percentage of the permit fee. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). The FY25-26 Fee Amendments document (27 pages) re-read in full; still headed "EFFECTIVE FEBRUARY 13, 2026" and every stored figure re-reads verbatim. SCHEDULED SUPERSESSION, TWO DAYS AWAY: Irving's fiscal year ends 2026-09-30, so the FY25-26 amendments lapse and an FY26-27 schedule is expected. RE-CHECK IRVING IMMEDIATELY AFTER 2026-10-01.
Source: published fee schedule · Verified 11/11/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building single trade - decks higher than 30 inches above grade Flat fee $65.00 | $65.00 |
○Re-Inspections Flat fee $75.00 | $75.00 |
Investigation Fee for work begun without a permit · add-on 100% of the regular fee, in addition to the regular fee — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
A deck higher than 30 inches above grade is permitted as a building single trade permit at a flat fee; any additional trades or work are charged separately elsewhere in the fee schedule. | 2026-09-25 (lane B run 1754) RE-VERIFIED VERBATIM. The cited FY25-26 Fee Amendments document is headed "EFFECTIVE FEBRUARY 13, 2026" and is in force, but Irving's fiscal year ends 2026-09-30. RE-CHECK AFTER 2026-10-01 alongside San Antonio, Pembroke Pines, Harris County and Tallahassee.
Source: published fee schedule · Verified 11/11/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Electrical single trade - temporary service poles, mobile home service, utility releases, clean and shows, service changes Flat fee $65.00 | $65.00 |
Solar energy system $75 + $55 per hour for plan review; Permit Minimum $130 | see rule |
Electric Gate Controllers $65 for the first item; $25 for each additional item | see rule |
○Re-Inspections Flat fee $75.00 | $75.00 |
After-hours inspection $65 per hour - $130 minimum, two-hour minimum | see rule |
How this jurisdiction calculates the fee
Electrical work is covered by the electrical single trade permit, charged at a flat fee, and each multi-family unit is considered a separate permit. Solar energy systems are charged separately with an hourly plan review and a permit minimum.
Source: published fee schedule · Verified 11/11/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Single residential lot new fence $0.25 per linear foot; $50 - Minimum | see rule |
Single residential lot replacement $0.25 per linear foot; $40 - Minimum | see rule |
Single commercial lot new or replacement $0.35 per linear foot; minimum $150 | see rule |
New or replacement - subdivision required screening fence $0.35 per linear foot; minimum $150 | see rule |
○Special Fence Project Plan, heard by Planning and Zoning Commission and City Council - Residential, Individual Lots (Planning and Zoning fees, effective October 3, 2025) Flat fee $400.00 | $400.00 |
How this jurisdiction calculates the fee
Fence permit fees are charged per linear foot subject to a minimum, in accordance with section 15-2, and vary by whether the fence is new or a replacement and whether the lot is residential or commercial. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). The FY25-26 Fee Amendments document (27 pages) re-read in full; still headed "EFFECTIVE FEBRUARY 13, 2026" and every stored figure re-reads verbatim. SCHEDULED SUPERSESSION, TWO DAYS AWAY: Irving's fiscal year ends 2026-09-30, so the FY25-26 amendments lapse and an FY26-27 schedule is expected. RE-CHECK IRVING IMMEDIATELY AFTER 2026-10-01.
Source: published fee schedule · Verified 11/12/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Re-roofing and roofing overlay - Single-Family, Townhouse Flat fee $100.00 | $100.00 |
○Re-roofing and roofing overlay - Duplex Flat fee $100.00 | $100.00 |
○Re-roofing and roofing overlay - Multi-family Flat fee $150.00 | $150.00 |
○Re-roofing and roofing overlay - Commercial Flat fee $150.00 | $150.00 |
○Re-Inspections Flat fee $75.00 | $75.00 |
How this jurisdiction calculates the fee
Re-roofing and roofing overlay permits are charged a flat fee per structure or building, set by building type. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). The FY25-26 Fee Amendments document (27 pages) re-read in full; still headed "EFFECTIVE FEBRUARY 13, 2026" and every stored figure re-reads verbatim. SCHEDULED SUPERSESSION, TWO DAYS AWAY: Irving's fiscal year ends 2026-09-30, so the FY25-26 amendments lapse and an FY26-27 schedule is expected. RE-CHECK IRVING IMMEDIATELY AFTER 2026-10-01.
Source: published fee schedule · Verified 11/12/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Retaining walls over 30 inches of exposed face - Residential, single-family, single lot Flat fee $160.00 | $160.00 |
○Retaining walls - commercial and all other, up to 100 linear feet Flat fee $160.00 | $160.00 |
Retaining walls - commercial and all other, 101 to 200 linear feet $160 + $0.30/ft | see rule |
Retaining walls - commercial and all other, 201 to 350 linear feet $240 + $0.25/ft | see rule |
Retaining walls - commercial and all other, over 350 linear feet $250 + $0.20/ft | see rule |
○Re-Inspections Flat fee $75.00 | $75.00 |
How this jurisdiction calculates the fee
Retaining wall permits are item 18 of the City of Irving consolidated fee schedule, listed as "Retaining walls (with over 30 inches in height of exposed face at any point)". A residential single-family single lot pays a flat fee; commercial and all other properties pay on a sliding scale by length of wall. Fee schedule effective October 15, 2022, with updated fees effective February 13, 2026. CORRECTED 2026-09-03: the Inspections section of the February 2026 Amendments prints two columns, "Current Fee" and "Proposed Fee", under a section header reading EFFECTIVE FEBRUARY 13, 2026, and three of the per-linear-foot rates on this row had been read from the superseded Current column. The rates in force are $160 plus $0.30 per foot for 101-200 feet (was stored $0.32), $240 plus $0.25 per foot for 201-350 feet (was $0.26) and $250 plus $0.20 per foot over 350 feet (was $0.24); the document annotates each as "Rounded down to nearest 5 or 0 due to end of penny production". The two flat $160 amounts are annotated "No change." and are unaffected. Every other Irving row in this pass already carried the Proposed column correctly, so this row was the lone inconsistency. | 2026-09-25 (lane B run 1754) ALL FIGURES RE-VERIFIED VERBATIM, BUT THE CITED CODE SOURCE HAS GONE BEHIND AUTHENTICATION. source_url https://ecode360.com/attachment/333511/IR6873-08Bbb%202024%20IRC%20Amendments.pdf now 302-redirects to https://ecode360.com/user/login/IR6873?permissionError=true and returns HTTP 403 to every client; WebFetch refuses it under robots.txt. NO REPLACEMENT WAS GUESSED. The fees themselves do not depend on it: every stored figure reads verbatim off the row's own fee_source_url, the Irving FY25-26 Fee Amendments schedule (EFFECTIVE FEBRUARY 13, 2026), item 18 - Residential single-family, single lot $160; Up to 100' $160; 101' to 200' $160 + $0.30/ft; 201'-350' $240 + $0.25/ft; Over 350' $250 + $0.20/ft - and Re-Inspections $75 at item 11. NOTE printed beside those lines: amounts are "Rounded down to nearest 5 or 0 due to end of penny production." HUMAN ACTION: find a public Irving source for the 2024 IRC retaining-wall amendment, or drop source_url to the fee schedule. RE-CHECK AFTER 2026-10-01 - Irving's fiscal year ends 2026-09-30.
Source: published fee schedule · Verified 11/11/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building single trade - storage buildings greater than 6 feet in any dimension up to 400 sq ft Flat fee $65.00 | $65.00 |
Storage Buildings over 400 square feet Permit - $0.30 per square foot of the area of work; Minimum fee - $130 | see rule |
○Re-Inspections Flat fee $75.00 | $75.00 |
How this jurisdiction calculates the fee
A storage building greater than 6 feet in any dimension and up to 400 square feet is charged a flat building single trade fee. A storage building over 400 square feet is charged per square foot of the area of work subject to a minimum, and that fee shall not exceed the fee for comparable space for new construction. | 2026-09-25 (lane B run 1754) RE-VERIFIED VERBATIM. Cited document headed "EFFECTIVE FEBRUARY 13, 2026"; Irving's fiscal year ends 2026-09-30, so RE-CHECK AFTER 2026-10-01.
Source: published fee schedule · Verified 11/11/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Plumbing single trade - water, sewer, gas service line replacements, water heaters, and similar plumbing work Flat fee $65.00 | $65.00 |
○Re-Inspections Flat fee $75.00 | $75.00 |
After-hours inspection $65 per hour - $130 minimum, two-hour minimum | see rule |
How this jurisdiction calculates the fee
Water heaters are covered by the plumbing single trade permit, charged at a flat fee, and each multi-family unit is considered a separate permit. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). The FY25-26 Fee Amendments document (27 pages) re-read in full; still headed "EFFECTIVE FEBRUARY 13, 2026" and every stored figure re-reads verbatim. SCHEDULED SUPERSESSION, TWO DAYS AWAY: Irving's fiscal year ends 2026-09-30, so the FY25-26 amendments lapse and an FY26-27 schedule is expected. RE-CHECK IRVING IMMEDIATELY AFTER 2026-10-01.
Source: published fee schedule · Verified 11/12/2026
See the full write-up: Irving building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.