Home / Calculators / Building Permit Fee Calculator

Laredo, Texas Building Permit Cost Calculator

Estimates permit cost in Laredo from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Remodel / Addition (Up to 1,000 sq. ft.), plan check
Flat fee $40.00
$40.00
○Remodel / Addition (Up to 1,000 sq. ft.), building permit
Flat fee $64.00
$64.00
○Remodel / Addition (1,001 - 2,000 sq. ft.), plan check
Flat fee $45.00
$45.00
○Remodel / Addition (1,001 - 2,000 sq. ft.), building permit
Flat fee $73.00
$73.00
Remodel/Addition (2,001 sq. ft. or more), plan check
$55.00 on the Permit Applications & Requirements table; $45.00 in Section 7-2 of the Code of Ordinances
see rule
○Remodel/Addition (2,001 sq. ft. or more), building permit
Flat fee $76.00
$76.00
○New Construction, plan check, updated per Ord. No. 2025-O-149
$0.28 x 2,000 = $560.00
$560.00
○New Construction, building permit, updated per Ord. No. 2025-O-149
$0.40 x 2,000 = $800.00
$800.00
Residential Swimming Pool, plan check
$40.00 on the Permit Applications & Requirements table; $34.00 in Section 7-2 of the Code of Ordinances
see rule
○Residential Swimming Pool, building permit
Flat fee $64.00
$64.00
○Open Accessory (e.g. porches, palapas, carports), plan check
Flat fee $40.00
$40.00
○Open Accessory (e.g. porches, palapas, carports), building permit
Flat fee $64.00
$64.00
○Mobile Home Installation Permit/Frame Home, plan check
Flat fee $12.50
$12.50
○Mobile Home Installation Permit/Frame Home, building permit
Flat fee $37.50
$37.50
○Technology Fee
Flat fee $20.00
$20.00
How this jurisdiction calculates the fee

A plan check fee is charged to initiate review and a building permit fee is charged for issuance, set by permit type, with new construction charged per square foot. A technology fee is charged as well. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). The Municode chapters were rendered with headless Chromium (library.municode.com 403s curl) and the Permit Applications & Requirements page was fetched directly. Code edition is "VERSION: JUL 1, 2026 (CURRENT)". Every stored figure re-reads verbatim. Sec. 11-44's latest amendment is still Ord. No. 2017-O-137, § 4, 10-11-17, unchanged, and it still prints the $50.00 basic fee, the $25.00 meter reconnection inspection fee and every per-item charge as stored ($5.00 circuits; $0.50 fixtures and base plugs; $7.00 appliances; $4.00 motors 1 hp and smaller; service at $3.00/$4.00/$7.00/$10.00/$18.00 by ampere band; $7.00 each additional meter). METHOD NOTE WORTH KEEPING: Municode renders these amounts with a leader-dot prefix and NO dollar sign ("Meter reconnection inspection fee .....25.00"), so an amount matcher that requires a "$" reports a false absence on every line of a Municode fee list. The $20.00 Technology Fee and the whole plan-check/building-permit table on the Permit Applications & Requirements page also re-read verbatim; the two recorded table-versus-code disagreements ($55.00 vs $45.00 remodel plan check, $40.00 vs $34.00 pool plan check) are unchanged and still carried in basis rather than resolved.

Source: published fee schedule · Verified 9/28/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○A basic fee
Flat fee $50.00
$50.00
○Meter reconnection inspection fee
Flat fee $25.00
$25.00
○Per item in addition to the basic fee: Circuits
Flat fee $5.00
$5.00
○Per item in addition to the basic fee: Fixtures, base plug
Flat fee $0.50
$0.50
○Per item in addition to the basic fee: Appliances (range, water heater, dryers, dishwashers, disposals, etc.)
Flat fee $7.00
$7.00
○Per item in addition to the basic fee: Motors 1 hp and smaller
Flat fee $4.00
$4.00
○Per item in addition to the basic fee: Service up to 60 amperes
Flat fee $3.00
$3.00
○Per item in addition to the basic fee: Service 61 to 100 amperes
Flat fee $4.00
$4.00
○Per item in addition to the basic fee: Service 101 to 200 amperes
Flat fee $7.00
$7.00
○Per item in addition to the basic fee: Service 201 to 400 amperes
Flat fee $10.00
$10.00
○Per item in addition to the basic fee: Service over 400 amperes
Flat fee $18.00
$18.00
○Per item in addition to the basic fee: Services each additional meter
Flat fee $7.00
$7.00
○Re-inspection fee
Flat fee $50.00
$50.00
Residential emergency inspection outside normal working hours or holidays
$50.00/hr.
see rule
Inspection request outside normal working hours or holidays
$50.00/hr. (minimum 2 hours)
see rule
How this jurisdiction calculates the fee

A basic fee is charged for the permit, and a further fee is charged per item for each circuit, fixture, motor, service size, appliance and piece of equipment covered by the permit. If work is started before a permit is issued, or applied for, the fee is subject to a penalty of one hundred fifty percent of the usual permit fee in addition to the required permit fees. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). The Municode chapters were rendered with headless Chromium (library.municode.com 403s curl) and the Permit Applications & Requirements page was fetched directly. Code edition is "VERSION: JUL 1, 2026 (CURRENT)". Every stored figure re-reads verbatim. Sec. 11-44's latest amendment is still Ord. No. 2017-O-137, § 4, 10-11-17, unchanged, and it still prints the $50.00 basic fee, the $25.00 meter reconnection inspection fee and every per-item charge as stored ($5.00 circuits; $0.50 fixtures and base plugs; $7.00 appliances; $4.00 motors 1 hp and smaller; service at $3.00/$4.00/$7.00/$10.00/$18.00 by ampere band; $7.00 each additional meter). METHOD NOTE WORTH KEEPING: Municode renders these amounts with a leader-dot prefix and NO dollar sign ("Meter reconnection inspection fee .....25.00"), so an amount matcher that requires a "$" reports a false absence on every line of a Municode fee list. The $20.00 Technology Fee and the whole plan-check/building-permit table on the Permit Applications & Requirements page also re-read verbatim; the two recorded table-versus-code disagreements ($55.00 vs $45.00 remodel plan check, $40.00 vs $34.00 pool plan check) are unchanged and still carried in basis rather than resolved.

Source: published fee schedule · Verified 9/28/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Block Fence, plan check
Flat fee $30.00
$30.00
○Block Fence, building permit
Flat fee $46.00
$46.00
○Technology Fee
Flat fee $20.00
$20.00
How this jurisdiction calculates the fee

A plan check fee is charged to initiate review of a Block Fence and a building permit fee is charged for issuance. A technology fee is charged as well. | 2026-09-25 (lane B run 1754) RE-VERIFIED, NOTHING CHANGED. cityoflaredo.com returned HTTP 404 to curl and HTTP 403 to headless Chromium; the page was read through WebFetch to confirm presence only and returned the Block Fence lines verbatim - Plan Check Fees (To initiate Review) $30.00, Building Permit Fees (For Issuance of Permit) $46.00, Technology Fee $20.00. NOTE recorded from that read: the Technology Fee is stated to apply only at the plan check phase, not at permit issuance.

Source: published fee schedule · Verified 9/25/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Reroof, plan check
Flat fee $34.00
$34.00
○Reroof, building permit
Flat fee $50.00
$50.00
○Technology Fee
Flat fee $20.00
$20.00
How this jurisdiction calculates the fee

A plan check fee is charged to initiate review of a reroof and a building permit fee is charged for issuance. A technology fee is charged as well. | 2026-09-25 (lane B run 1754) RE-VERIFIED, NOTHING CHANGED. Same host behaviour as the sibling fence row (404 to curl, 403 to headless Chromium, read through WebFetch for presence only). Reroof Plan Check $34.00, Building Permit $50.00, Technology Fee $20.00, all verbatim. The Technology Fee is stated to apply only at the plan check phase.

Source: published fee schedule · Verified 9/25/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

How this jurisdiction calculates the fee

No published fee. Laredo adopted permit fee schedule, Ordinance No. 2025-O-149, enumerates every residential plan-checking and building permit type it charges for, and none of them is a retaining wall; the commercial total-valuation schedule in the same ordinance is keyed to valuation rather than to named structure types. The city therefore publishes no retaining wall permit price, even though a permit is required. Applicants should confirm the applicable charge with Building Development Services before submitting.

Source: published fee schedule · Verified 8/12/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Enclosed Accessory (e.g. detached storage room), plan-checking fee
Flat fee $40.00
$40.00
○Enclosed Accessory (e.g. detached storage room), building permit fee
Flat fee $64.00
$64.00
○Open Accessory (e.g. porches, palapas, carports), plan-checking fee
Flat fee $40.00
$40.00
○Open Accessory (e.g. porches, palapas, carports), building permit fee
Flat fee $64.00
$64.00
○Technology Fee
Flat fee $20.00
$20.00
How this jurisdiction calculates the fee

A shed is charged as an Enclosed Accessory structure, the example given in the schedule being a detached storage room. Two charges apply: a plan-checking fee payable when the plans are submitted to initiate review, and a building permit fee payable on issuance of the permit. A technology fee is charged in addition. Residential building and inspection fees are flat amounts rather than valuation-based because Texas H.B. 852 bars a city from considering the value or cost of a residential dwelling when setting them.

Source: published fee schedule · Verified 9/15/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○For issuing each permit
Flat fee $50.00
$50.00
○For issuing each supplemental permit
Flat fee $50.00
$50.00
○For each water heater and/or vent
Flat fee $7.00
$7.00
○For each plumbing fixture or trap or set of fixtures on one (1) trap (Including water, drainage piping and backflow protection therefore)
Flat fee $6.00
$6.00
○For installation, alteration or repair of water piping and/or water treating equipment, each
Flat fee $7.00
$7.00
○For repair or alternation of drainage or vent piping, each fixture
Flat fee $7.00
$7.00
○For each building sewer and each trailer park sewer
Flat fee $10.00
$10.00
○For each backflow protection device other than atmospheric-type vacuum breaker: Two (2) inches and smaller
Flat fee $25.00
$25.00
○Inspections outside of normal business hours, per hour
Flat fee $50.00
$50.00
○Re-inspection fee assessed under provisions of section 107.3.3
Flat fee $50.00
$50.00
○Inspections for which no fee is specifically indicated (minimum charge - one-half hour)
Flat fee $25.00
$25.00
How this jurisdiction calculates the fee

A plumbing permit is charged a fee for issuing the permit plus a per-item fee for each fixture, appliance and piping item covered by the permit. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). The Municode chapters were rendered with headless Chromium (library.municode.com 403s curl) and the Permit Applications & Requirements page was fetched directly. Code edition is "VERSION: JUL 1, 2026 (CURRENT)". Every stored figure re-reads verbatim. Sec. 11-44's latest amendment is still Ord. No. 2017-O-137, § 4, 10-11-17, unchanged, and it still prints the $50.00 basic fee, the $25.00 meter reconnection inspection fee and every per-item charge as stored ($5.00 circuits; $0.50 fixtures and base plugs; $7.00 appliances; $4.00 motors 1 hp and smaller; service at $3.00/$4.00/$7.00/$10.00/$18.00 by ampere band; $7.00 each additional meter). METHOD NOTE WORTH KEEPING: Municode renders these amounts with a leader-dot prefix and NO dollar sign ("Meter reconnection inspection fee .....25.00"), so an amount matcher that requires a "$" reports a false absence on every line of a Municode fee list. The $20.00 Technology Fee and the whole plan-check/building-permit table on the Permit Applications & Requirements page also re-read verbatim; the two recorded table-versus-code disagreements ($55.00 vs $45.00 remodel plan check, $40.00 vs $34.00 pool plan check) are unchanged and still carried in basis rather than resolved.

Source: published fee schedule · Verified 9/28/2026

See the full write-up: Laredo building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.