Estimates permit cost in Lubbock from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Single Family Permits, new construction $0.15 x 2,000 = $300.00 | $300.00 |
○Duplex Permits, new construction $0.15 x 2,000 = $300.00 | $300.00 |
○New Commercial Permits $0.20 x 2,000 = $400.00 | $400.00 |
○Apartment Permits $0.20 x 2,000 = $400.00 | $400.00 |
○Commercial Shell Permits $0.10 x 2,000 = $200.00 | $200.00 |
○Commercial Tenant Finish Out Permits $0.10 x 2,000 = $200.00 | $200.00 |
○Residential Building Addition $0.15 x 2,000 = $300.00 | $300.00 |
○Commercial Building Addition $0.20 x 2,000 = $400.00 | $400.00 |
○Residential Alterations where there is no change in floor area $0.15 x 2,000 = $300.00 | $300.00 |
○Commercial Alterations where there is no change in floor area $2.25 x 250 = $562.50 | $562.50 |
○Minimum Permit Fee for All Permits Flat fee $75.00 | $75.00 |
Commercial Plan Review Fee · add-on 25% of building permit fee — select the permit fee line above to calculate | see rule |
○Commercial or Residential Demolition Permits Flat fee $75.00 | $75.00 |
○First Reinspection Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Building permit fees are set by the annual Building Safety Fee Schedule. New construction and additions to floor area are charged per square foot of gross floor area under roof at a rate that varies by building type. Alterations with no change in floor area are charged per square foot for residential work and per $1,000 of total construction valuation for commercial work. Every permit is subject to the minimum permit fee that applies to all permits, and commercial projects also pay a plan review fee calculated as a percentage of the building permit fee. | 2026-09-12 (lane B run 897): cited schedule re-read in full, every figure verbatim, and the City Forms & Fee Schedule page (mylubbock.us/595) still links exactly this document (DocumentCenter View/7615). SUPERSESSION DUE SHORTLY: the document's own header reads "Fiscal Year Effective Dates: October 1, 2025 - September 30, 2026", so it expires in 18 days. Re-check after 2026-10-01 for an FY2026-2027 successor.
Source: published fee schedule · Verified 9/15/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○New Construction Permits $0.07 x 2,000 = $140.00 | $140.00 |
○Additions to Floor Area $0.07 x 2,000 = $140.00 | $140.00 |
○Alteration or Total Rewire Permits $0.07 x 2,000 = $140.00 | $140.00 |
○Commercial or Residential Service Permits Flat fee $75.00 | $75.00 |
○Commercial or Residential Solar or Other Alternative Energy Source Permit Flat fee $75.00 | $75.00 |
○Generic Permits Not Listed Above Flat fee $75.00 | $75.00 |
○Minimum Permit Fee for All Permits Flat fee $75.00 | $75.00 |
○First Reinspection Flat fee $50.00 | $50.00 |
○Second Reinspection Flat fee $100.00 | $100.00 |
Annual Fee for Mechanical, Electrical, or Plumbing Contractors $0 or no charge | see rule |
How this jurisdiction calculates the fee
Electrical permit fees are set by the annual Building Safety Fee Schedule. New construction, additions to floor area, and alteration or total rewire permits are charged per square foot of gross floor area under roof. Service permits, solar and other alternative energy permits, and any electrical permit not otherwise listed in the schedule are flat fees. Every permit is subject to the minimum permit fee that applies to all permits. Electrical contractors must register with the city, but the registration fee is waived under state law.
Source: published fee schedule · Verified 9/15/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Commercial or Residential Fence Permits $75. | see rule |
How this jurisdiction calculates the fee
A flat fee applies to a fence permit. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). mylubbock.us returned HTTP 200 to a plain client this pass, so the 2025-2026 Building Safety Fee Schedule (6 pages) was read directly with pdftotext -layout rather than presence-confirmed through WebFetch as in run 1754. Every stored figure re-reads verbatim. The schedule states its own fiscal-year effective dates and is adopted under Budget Ordinance No. 2024-O0111. SCHEDULED SUPERSESSION CANDIDATE: a 2026-2027 Building Safety Fee Schedule is expected with Lubbock's fiscal year, so re-check after 2026-10-01.
Source: published fee schedule · Verified 9/28/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Roofing permit Flat fee $75.00 | $75.00 |
How this jurisdiction calculates the fee
A flat fee applies to a roofing permit. | 2026-09-25 (lane B run 1754) RE-VERIFIED, NOTHING CHANGED. mylubbock.us returned HTTP 403 to curl and to headless Chromium (challenge not solved); the page was read through WebFetch to confirm presence only and states "A roofing permit costs $75.00", matching the stored figure verbatim.
Source: published fee schedule · Verified 9/25/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Minimum Permit Fee for All Permits $75. | see rule |
How this jurisdiction calculates the fee
A minimum permit fee applies to all permits. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). mylubbock.us returned HTTP 200 to a plain client this pass, so the 2025-2026 Building Safety Fee Schedule (6 pages) was read directly with pdftotext -layout rather than presence-confirmed through WebFetch as in run 1754. Every stored figure re-reads verbatim. The schedule states its own fiscal-year effective dates and is adopted under Budget Ordinance No. 2024-O0111. SCHEDULED SUPERSESSION CANDIDATE: a 2026-2027 Building Safety Fee Schedule is expected with Lubbock's fiscal year, so re-check after 2026-10-01.
Source: published fee schedule · Verified 9/28/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Residential Detached Accessory Building Permits $0.15 x 2,000 = $300.00 | $300.00 |
○Commercial Detached Accessory Building Permits $0.20 x 2,000 = $400.00 | $400.00 |
○Minimum Permit Fee for All Permits Flat fee $75.00 | $75.00 |
○Commercial or Residential Foundation Permits Flat fee $75.00 | $75.00 |
○First Reinspection Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
A shed is permitted as a detached accessory building and is charged per square foot of gross floor area under roof under the New Construction Fees table of the annual Building Safety Fee Schedule, at the residential rate where the shed is ancillary to a one or two-family dwelling and at the commercial rate otherwise. The charge is subject to the minimum permit fee that applies to all permits.
Source: published fee schedule · Verified 9/15/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Commercial or Residential Water Heater $75. | see rule |
Commercial or Residential Gas Line Permit $75. | see rule |
Commercial or Residential Water Line Permit $75. | see rule |
Generic Permits Not Listed Above $75. | see rule |
How this jurisdiction calculates the fee
A flat fee applies to a water heater permit; separate flat fees apply to gas line and water line permits and to plumbing permits not otherwise listed in the schedule. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). mylubbock.us returned HTTP 200 to a plain client this pass, so the 2025-2026 Building Safety Fee Schedule (6 pages) was read directly with pdftotext -layout rather than presence-confirmed through WebFetch as in run 1754. Every stored figure re-reads verbatim. The schedule states its own fiscal-year effective dates and is adopted under Budget Ordinance No. 2024-O0111. SCHEDULED SUPERSESSION CANDIDATE: a 2026-2027 Building Safety Fee Schedule is expected with Lubbock's fiscal year, so re-check after 2026-10-01.
Source: published fee schedule · Verified 9/28/2026
See the full write-up: Lubbock building permit cost