McKinney, Texas Building Permit Cost Calculator
Estimates permit cost in McKinney from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Single-family new construction, per gross square foot Flat fee $0.68 | $0.68 |
○Single-family additions/alterations, per gross square foot of addition or affected area Flat fee $0.68 | $0.68 |
○Commercial valuation $100,001 to $500,000 $993.75 for the first $100,000.00, plus 150 x $5.60 for $150,000.00 over (rounded up per "or fraction thereof") = $1,833.75 | $1,833.75 |
○Plan Review Fee - Residential Flat fee $100.00 | $100.00 |
○Plan Review Fee - Commercial Flat fee $200.00 | $200.00 |
Reinspection fees - 1st / 2nd / 3rd or more $50.00 / $75.00 / $100.00 | see rule |
How this jurisdiction calculates the fee
McKinney uses two completely different structures depending on occupancy. Single-family dwellings (detached and attached, including duplexes and townhomes) are priced purely per gross square foot, both for new construction and for additions and alterations, where the alteration rate applies to the affected area. Commercial permits instead use a classic tiered construction-valuation table stepping down from $23.50 for the smallest projects to a base plus a declining per-$1,000 increment. Multi-family is priced per unit plus separate mechanical, electrical and plumbing fees. Plan review is a flat add-on that differs for residential and commercial, and re-inspections escalate in price with each successive failure. Off-hours inspections and additional plan review from applicant-driven changes are billed hourly with minimum charges.
Source: published fee schedule · Verified 9/15/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Single-family Additions/Alterations, per gross square foot of addition or affected area (governing rate) Flat fee $0.68 | $0.68 |
○Plan Review Fee - Residential Flat fee $100.00 | $100.00 |
○Electrical Permit Fee, if deck electrical is included Flat fee $40.00 | $40.00 |
○1st Reinspection Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
McKinney does not publish a dedicated deck or patio cover permit fee. Instead, a deck on a single-family dwelling falls under the single-family Additions/Alterations line, which is charged per gross square foot of the addition or affected area of alteration. Because there is no flat minimum published for that line, the cost scales directly with deck size, and the flat residential plan review fee applies if plans are reviewed. Electrical work such as deck lighting or an outlet would add the separate flat electrical permit fee.
Source: published fee schedule · Verified 9/15/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Electrical Permit Fee, flat Flat fee $40.00 | $40.00 |
○Electrical minimum charge Flat fee $40.00 | $40.00 |
○Electrical wiring, per square foot $0.03 x 2,000 = $60.00 | $60.00 |
○1st Reinspection Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Electrical is priced two ways on McKinney's schedule. Other Inspections and Fees lists a flat Electrical Permit Fee, and the separate Plumbing, Mechanical and Electrical Permit Fees Table sets a minimum charge plus a per-square-foot rate for electrical wiring, so larger wiring jobs are charged on building area above the minimum. Note the fee table shows both a struck-through legacy minimum of $25.00 and a current minimum of $40.00, which matches the flat Electrical Permit Fee listed elsewhere on the same schedule. Failed inspections add the escalating re-inspection fees.
Source: published fee schedule · Verified 9/15/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Residential Fence Permit, flat Flat fee $30.00 | $30.00 |
○1st Reinspection Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
The residential fence permit is a flat fee with no linear-foot, height or material multiplier, and it is one of the lowest published permit fees on McKinney's schedule. No separate plan review fee is listed for fences. A failed inspection would pull in the escalating re-inspection schedule.
Source: published fee schedule · Verified 9/15/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Residential Re-Roof Permit, flat Flat fee $200.00 | $200.00 |
○1st Reinspection Flat fee $50.00 | $50.00 |
○2nd Reinspection Flat fee $75.00 | $75.00 |
○3rd Reinspection or more Flat fee $100.00 | $100.00 |
How this jurisdiction calculates the fee
Residential re-roofing is a single flat permit fee in McKinney, listed under Other Inspections and Fees, with no square-footage, valuation or material component; the same amount applies to a small ranch house and a large two-story. It is one of the higher flat re-roof fees among the North Texas suburbs. If an inspection fails, the escalating re-inspection schedule applies on top ($50 for the first, $75 for the second, $100 for the third or more).
Source: published fee schedule · Verified 9/15/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Single-family New Construction, per gross square foot (governing rate) Flat fee $0.68 | $0.68 |
○Single-family Additions/Alterations, per gross square foot (governing rate) Flat fee $0.68 | $0.68 |
○Plan Review Fee - Residential Flat fee $100.00 | $100.00 |
○Electrical Permit Fee, if the shed is wired Flat fee $40.00 | $40.00 |
How this jurisdiction calculates the fee
There is no dedicated shed or accessory building line item on McKinney's permit fee schedule. A detached accessory building on a single-family lot is charged under the single-family per-gross-square-foot rate that governs new construction and additions, so the permit cost scales with the shed's footprint and there is no published flat minimum. The flat residential plan review fee applies where plans are reviewed, and separate flat electrical or plumbing permit fees apply if the shed is served by those utilities.
Source: published fee schedule · Verified 9/15/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Residential Water Heater Permit, flat Flat fee $40.00 | $40.00 |
○Plumbing permit minimum fee Flat fee $40.00 | $40.00 |
○Each fixture - Heater (per-unit plumbing fee) Flat fee $2.50 | $2.50 |
○1st Reinspection Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
McKinney lists a flat Residential Water Heater Permit fee under Other Inspections and Fees, which is the amount most homeowners and plumbers will pay. Separately, the Plumbing Permit Fees table works on a minimum-plus-per-fixture model, where a heater counts as a fixture at a small per-unit rate on top of the plumbing permit minimum; the table shows a struck-through legacy $25.00 minimum superseded by a $40.00 minimum. Both routes land at the same practical floor. Failed inspections add the escalating re-inspection fees.
Source: published fee schedule · Verified 9/15/2026
See the full write-up: McKinney building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.