B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Plano, Texas Building Permit Cost Calculator

Estimates permit cost in Plano from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○New single family residence, per square foot under roof
Flat fee $0.48
$0.48
○New single family residence plan review
Flat fee $80.00
$80.00
○New single family residence plumbing certificate
Flat fee $75.00
$75.00
○Residential addition or alteration minimum fee
Flat fee $40.00
$40.00
○Commercial permit, valuation $1 to $500
Flat fee $24.00
$24.00
○Commercial permit, valuation above $500,001
$5.25 x 250 = $1,312.50
$1,312.50
How this jurisdiction calculates the fee

Plano adopted its current Building Inspections Department Fee Schedule by Ordinance 2025-11-4, passed November 10, 2025 and effective January 2, 2026, repealing Ordinance 2020-3-6. A new single family residence is $0.48 per square foot under roof, plus an $80.00 plan review fee and a $75.00 plumbing certificate. A duplex is $0.48 per square foot plus $90.00 plan review and a $150.00 plumbing certificate. Residential additions, alterations and backyard cottages carry a $40.00 minimum, then $0.48 per square foot plus $45.00 plan review, plus separate electrical, plumbing and mechanical charges of $0.01 per square foot with a $45.00 minimum each. Commercial building permits are valuation based using Table 1, which starts at $24 for work valued at $1 to $500 and reaches $5.25 per $1,000 of valuation above $500,001. A plan review deposit of 65 percent of the building permit fee applies, is credited toward the total and is not refundable. Re-verified 2026-09-14 from the cited PDF, which is Ordinance No. 2025-11-4 with Exhibit A, repealing Ordinance No. 2020-3-6 in its entirety. Every stored amount was found on its own line of Exhibit A. METHOD TRAP WORTH KEEPING: Exhibit A prints amounts WITHOUT a dollar sign (75.00, not $75.00) and prints per-square-foot rates without a leading zero (.48 / Sq.Ft.), so searching for "$75.00" or "$0.48" reports every figure as absent from a document that in fact contains them all. A second trap: the fence, retaining wall and lawn irrigation rows print two numbers, the component permit fee in an inner column and the all-in total in the outer column (Residential Permit Fee 65.00 and Day Laborer Fee 10.00 against a total of 75.00; Commercial Permit Fee 110.00 and Day Laborer Fee 10.00 against 120.00), so the outer figure is the total and not a second fee. Table 1 was read in full and its middle bands are $130 + $9.99, $360 + $8.13, $563 + $4.54 and $790 + $3.43, with $24 at $1 to $500 and $5.25 per $1,000 above $500,001 as this row states.

Source: published fee schedule · Verified 11/12/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

No published deck permit fee
Not published
see rule
○Residential addition or alteration minimum fee that governs instead
Flat fee $40.00
$40.00
○Building permit, per square foot
Flat fee $0.48
$0.48
○Plan review
Flat fee $45.00
$45.00
How this jurisdiction calculates the fee

Plano publishes no deck permit fee. A deck is handled as a residential addition or alteration, which carries a $40.00 minimum fee, then $0.48 per square foot for the building permit plus $45.00 for plan review, with electrical, plumbing or mechanical work adding $0.01 per square foot at a $45.00 minimum each where it applies. Amounts are from the fee schedule adopted by Ordinance 2025-11-4, effective January 2, 2026. Re-verified 2026-09-14 from the cited PDF, which is Ordinance No. 2025-11-4 with Exhibit A, repealing Ordinance No. 2020-3-6 in its entirety. Every stored amount was found on its own line of Exhibit A. METHOD TRAP WORTH KEEPING: Exhibit A prints amounts WITHOUT a dollar sign (75.00, not $75.00) and prints per-square-foot rates without a leading zero (.48 / Sq.Ft.), so searching for "$75.00" or "$0.48" reports every figure as absent from a document that in fact contains them all. A second trap: the fence, retaining wall and lawn irrigation rows print two numbers, the component permit fee in an inner column and the all-in total in the outer column (Residential Permit Fee 65.00 and Day Laborer Fee 10.00 against a total of 75.00; Commercial Permit Fee 110.00 and Day Laborer Fee 10.00 against 120.00), so the outer figure is the total and not a second fee. Table 1 was read in full and its middle bands are $130 + $9.99, $360 + $8.13, $563 + $4.54 and $790 + $3.43, with $24 at $1 to $500 and $5.25 per $1,000 above $500,001 as this row states.

Source: published fee schedule · Verified 11/12/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Simple trade permit (MEP), residential, each
Flat fee $85.00
$85.00
○Simple trade permit (MEP), commercial without plans
Flat fee $100.00
$100.00
○Simple trade permit (MEP), commercial with plans
Flat fee $125.00
$125.00
○Electrical within a residential addition, minimum
Flat fee $45.00
$45.00
○Residential photovoltaic
Flat fee $150.00
$150.00
How this jurisdiction calculates the fee

Plano publishes no standalone residential electrical permit fee. A simple trade permit covering mechanical, electrical or plumbing work is $85.00 for residential, $100.00 for commercial without plans and $125.00 for commercial with plans, charged for each permit. Electrical work forming part of a residential addition or alteration is instead charged at $0.01 per square foot with a $45.00 minimum. Commercial electrical inspections for new installations and full remodels are priced by building floor area, $70.00 up to 3,000 square feet, $90.00 for 3,001 to 10,000, $110.00 for 10,001 to 100,000 and $130.00 above 100,000. Residential photovoltaic work is $150.00. From Ordinance 2025-11-4, effective January 2, 2026. Re-verified 2026-09-14 from the cited PDF, which is Ordinance No. 2025-11-4 with Exhibit A, repealing Ordinance No. 2020-3-6 in its entirety. Every stored amount was found on its own line of Exhibit A. METHOD TRAP WORTH KEEPING: Exhibit A prints amounts WITHOUT a dollar sign (75.00, not $75.00) and prints per-square-foot rates without a leading zero (.48 / Sq.Ft.), so searching for "$75.00" or "$0.48" reports every figure as absent from a document that in fact contains them all. A second trap: the fence, retaining wall and lawn irrigation rows print two numbers, the component permit fee in an inner column and the all-in total in the outer column (Residential Permit Fee 65.00 and Day Laborer Fee 10.00 against a total of 75.00; Commercial Permit Fee 110.00 and Day Laborer Fee 10.00 against 120.00), so the outer figure is the total and not a second fee. Table 1 was read in full and its middle bands are $130 + $9.99, $360 + $8.13, $563 + $4.54 and $790 + $3.43, with $24 at $1 to $500 and $5.25 per $1,000 above $500,001 as this row states.

Source: published fee schedule · Verified 11/13/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Fence, residential, total
Flat fee $75.00
$75.00
○Residential permit fee portion
Flat fee $65.00
$65.00
○Day laborer fee portion
Flat fee $10.00
$10.00
○Fence, commercial, total
Flat fee $120.00
$120.00
How this jurisdiction calculates the fee

Plano charges fences and retaining walls on one combined schedule line. The residential total is $75.00, made up of a $65.00 permit fee and a $10.00 day laborer fee. The commercial total is $120.00, made up of a $110.00 permit fee and a $10.00 day laborer fee. Amounts are from the fee schedule adopted by Ordinance 2025-11-4, effective January 2, 2026. The fence handout published by the city carries no amount and directs applicants to the fee schedule. Re-verified 2026-09-14 from the cited PDF, which is Ordinance No. 2025-11-4 with Exhibit A, repealing Ordinance No. 2020-3-6 in its entirety. Every stored amount was found on its own line of Exhibit A. METHOD TRAP WORTH KEEPING: Exhibit A prints amounts WITHOUT a dollar sign (75.00, not $75.00) and prints per-square-foot rates without a leading zero (.48 / Sq.Ft.), so searching for "$75.00" or "$0.48" reports every figure as absent from a document that in fact contains them all. A second trap: the fence, retaining wall and lawn irrigation rows print two numbers, the component permit fee in an inner column and the all-in total in the outer column (Residential Permit Fee 65.00 and Day Laborer Fee 10.00 against a total of 75.00; Commercial Permit Fee 110.00 and Day Laborer Fee 10.00 against 120.00), so the outer figure is the total and not a second fee. Table 1 was read in full and its middle bands are $130 + $9.99, $360 + $8.13, $563 + $4.54 and $790 + $3.43, with $24 at $1 to $500 and $5.25 per $1,000 above $500,001 as this row states.

Source: published fee schedule · Verified 11/13/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Re-roof, residential
Flat fee $75.00
$75.00
Commercial roofing
Valuation based per Table 1
see rule
How this jurisdiction calculates the fee

A residential re-roof permit in Plano is $75.00 flat. The re-roof handout published by the city carries no amount and simply directs applicants to the fee schedule. Commercial roofing falls under the commercial building permit, which is valuation based using Table 1. From the fee schedule adopted by Ordinance 2025-11-4, effective January 2, 2026. Re-verified 2026-09-14 from the cited PDF, which is Ordinance No. 2025-11-4 with Exhibit A, repealing Ordinance No. 2020-3-6 in its entirety. Every stored amount was found on its own line of Exhibit A. METHOD TRAP WORTH KEEPING: Exhibit A prints amounts WITHOUT a dollar sign (75.00, not $75.00) and prints per-square-foot rates without a leading zero (.48 / Sq.Ft.), so searching for "$75.00" or "$0.48" reports every figure as absent from a document that in fact contains them all. A second trap: the fence, retaining wall and lawn irrigation rows print two numbers, the component permit fee in an inner column and the all-in total in the outer column (Residential Permit Fee 65.00 and Day Laborer Fee 10.00 against a total of 75.00; Commercial Permit Fee 110.00 and Day Laborer Fee 10.00 against 120.00), so the outer figure is the total and not a second fee. Table 1 was read in full and its middle bands are $130 + $9.99, $360 + $8.13, $563 + $4.54 and $790 + $3.43, with $24 at $1 to $500 and $5.25 per $1,000 above $500,001 as this row states.

Source: published fee schedule · Verified 11/12/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Retaining wall, residential, total
Flat fee $75.00
$75.00
○Residential permit fee portion
Flat fee $65.00
$65.00
○Day laborer fee portion
Flat fee $10.00
$10.00
○Retaining wall, commercial, total
Flat fee $120.00
$120.00
How this jurisdiction calculates the fee

Plano prices retaining walls on the same schedule line as fences. The residential total is $75.00, consisting of a $65.00 permit fee plus a $10.00 day laborer fee, and the commercial total is $120.00, consisting of a $110.00 permit fee plus a $10.00 day laborer fee. Nothing in the schedule varies the charge by wall height or length. From Ordinance 2025-11-4, effective January 2, 2026. Re-verified 2026-09-14 from the cited PDF, which is Ordinance No. 2025-11-4 with Exhibit A, repealing Ordinance No. 2020-3-6 in its entirety. Every stored amount was found on its own line of Exhibit A. METHOD TRAP WORTH KEEPING: Exhibit A prints amounts WITHOUT a dollar sign (75.00, not $75.00) and prints per-square-foot rates without a leading zero (.48 / Sq.Ft.), so searching for "$75.00" or "$0.48" reports every figure as absent from a document that in fact contains them all. A second trap: the fence, retaining wall and lawn irrigation rows print two numbers, the component permit fee in an inner column and the all-in total in the outer column (Residential Permit Fee 65.00 and Day Laborer Fee 10.00 against a total of 75.00; Commercial Permit Fee 110.00 and Day Laborer Fee 10.00 against 120.00), so the outer figure is the total and not a second fee. Table 1 was read in full and its middle bands are $130 + $9.99, $360 + $8.13, $563 + $4.54 and $790 + $3.43, with $24 at $1 to $500 and $5.25 per $1,000 above $500,001 as this row states.

Source: published fee schedule · Verified 11/13/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Accessory structure under 400 square feet
Flat fee $75.00
$75.00
Detached accessory structure 120 square feet or less
No permit required
see rule
○Accessory building 400 square feet or more, minimum
Flat fee $40.00
$40.00
How this jurisdiction calculates the fee

A shed in Plano is permitted as an accessory structure. Accessory structures under 400 square feet are $75.00 flat, and carports are charged on the same line. Larger accessory buildings are not listed separately and fall under the residential addition and alteration rules, a $40.00 minimum then $0.48 per square foot plus $45.00 plan review. The accessory building handout published by the city notes that a one story detached accessory structure of 120 square feet or less does not require a permit, and that 65 percent of fees are due before a permit can be routed for review. From Ordinance 2025-11-4, effective January 2, 2026. Re-verified 2026-09-14 from the cited PDF, which is Ordinance No. 2025-11-4 with Exhibit A, repealing Ordinance No. 2020-3-6 in its entirety. Every stored amount was found on its own line of Exhibit A. METHOD TRAP WORTH KEEPING: Exhibit A prints amounts WITHOUT a dollar sign (75.00, not $75.00) and prints per-square-foot rates without a leading zero (.48 / Sq.Ft.), so searching for "$75.00" or "$0.48" reports every figure as absent from a document that in fact contains them all. A second trap: the fence, retaining wall and lawn irrigation rows print two numbers, the component permit fee in an inner column and the all-in total in the outer column (Residential Permit Fee 65.00 and Day Laborer Fee 10.00 against a total of 75.00; Commercial Permit Fee 110.00 and Day Laborer Fee 10.00 against 120.00), so the outer figure is the total and not a second fee. Table 1 was read in full and its middle bands are $130 + $9.99, $360 + $8.13, $563 + $4.54 and $790 + $3.43, with $24 at $1 to $500 and $5.25 per $1,000 above $500,001 as this row states.

Source: published fee schedule · Verified 11/12/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

No published water heater permit fee
Not published
see rule
○Simple trade permit (MEP), residential, each
Flat fee $85.00
$85.00
○Simple trade permit (MEP), commercial without plans
Flat fee $100.00
$100.00
How this jurisdiction calculates the fee

Plano publishes no water heater permit fee. A water heater replacement is taken out as a simple trade permit, which is $85.00 for residential, $100.00 for commercial without plans and $125.00 for commercial with plans. The plumbing permit entry in the schedule points readers to a mechanical permit fee heading that appears nowhere in the document, a dangling cross reference carried over from the previous schedule. The water heater handout published by the city is a technical requirements sheet and states no amount. From Ordinance 2025-11-4, effective January 2, 2026. Re-verified 2026-09-14 from the cited PDF, which is Ordinance No. 2025-11-4 with Exhibit A, repealing Ordinance No. 2020-3-6 in its entirety. Every stored amount was found on its own line of Exhibit A. METHOD TRAP WORTH KEEPING: Exhibit A prints amounts WITHOUT a dollar sign (75.00, not $75.00) and prints per-square-foot rates without a leading zero (.48 / Sq.Ft.), so searching for "$75.00" or "$0.48" reports every figure as absent from a document that in fact contains them all. A second trap: the fence, retaining wall and lawn irrigation rows print two numbers, the component permit fee in an inner column and the all-in total in the outer column (Residential Permit Fee 65.00 and Day Laborer Fee 10.00 against a total of 75.00; Commercial Permit Fee 110.00 and Day Laborer Fee 10.00 against 120.00), so the outer figure is the total and not a second fee. Table 1 was read in full and its middle bands are $130 + $9.99, $360 + $8.13, $563 + $4.54 and $790 + $3.43, with $24 at $1 to $500 and $5.25 per $1,000 above $500,001 as this row states.

Source: published fee schedule · Verified 11/12/2026

See the full write-up: Plano building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.