B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

San Antonio, Texas Building Permit Cost Calculator

Estimates permit cost in San Antonio from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○New residential, 0 to 500 square feet (total basic permit fees)
Flat fee $752.10
$752.10
○New residential, 501 to 1,000 square feet (total basic permit fees)
Flat fee $1,136.30
$1,136.30
○New residential, 1,251 to 1,500 square feet (total basic permit fees)
Flat fee $1,381.20
$1,381.20
○New residential, 1,751 to 2,000 square feet (total basic permit fees)
Flat fee $1,665.30
$1,665.30
○New residential, 2,501 to 3,000 square feet (total basic permit fees)
Flat fee $1,728.50
$1,728.50
○New residential, 3,001 to 3,500 square feet (total basic permit fees)
Flat fee $2,026.30
$2,026.30
○New residential, 4,001 to 5,000 square feet (total basic permit fees)
Flat fee $2,226.50
$2,226.50
○New residential, 6,001 to 6,500 square feet (total basic permit fees)
Flat fee $2,923.40
$2,923.40
○New residential, 7,751 to 9,000 square feet (total basic permit fees)
Flat fee $4,008.90
$4,008.90
○Commercial plan review, valuation $0 to $1,000
Flat fee $115.00
$115.00
Commercial plan review, valuation $1,001 to $200,000
$115.00+$1.90/$1,000, or fraction thereof, over $1,000
see rule
Commercial plan review, valuation $200,001 to $1,000,000
$481.20+$1.80/$1,000, or fraction thereof, over $200,000
see rule
Commercial plan review, valuation $1,000,001 to $5,000,000
$1,861.20+$0.90/$1,000, or fraction thereof, over $1,000,000
see rule
Commercial plan review, valuation over $5,000,000
$5,311.20+$0.60/$1,000, or fraction thereof, over $5,000,000
see rule
○Residential repair existing, general (windows, doors, siding)
Flat fee $172.50
$172.50
○Residential repair existing, full remodel
Flat fee $241.50
$241.50
○Repair existing foundation
Flat fee $184.00
$184.00
○Residential swimming pool fee
Flat fee $414.00
$414.00
○Manufactured home installation
Flat fee $57.50
$57.50
○Re-inspection fee
Flat fee $57.50
$57.50
○After hour inspection fee (per hour, 1 hour minimum)
Flat fee $115.00
$115.00
○Inspection for which no fee is specifically indicated (per hour, 1 hour minimum)
Flat fee $115.00
$115.00
How this jurisdiction calculates the fee

New residential building plan review and permit fees, including trade permits, are set by square-footage range in a single table; commercial and existing residential building fees are based on valuation. Residential unfinished projects over 1,000 sf get a 50% plan review discount. Plan review lines below are the COMMERCIAL valuation table; new residential plan review is included in the square-footage totals. SUPERSEDED 2026-10-20 (lane B run 2153, pipeline run 115): San Antonio replaced the FY 2026 Development Fee Schedule (Rev. Oct 2025) with the FY 2027 Development Fee Schedule (cover: "Revised: September 2026"; PDF created 2026-10-06; same docsonline CurrentFeeSchedule.pdf URL, 31 pages, pdftotext readable, 1365 lines read). Fees rose about 15% across the board (e.g. fence $25.00 to $28.75, base electrical $50 to $57.50, re-inspection $50 to $57.50). All figures below were read from the FY 2027 document; the earlier FY 2026 figures were removed. Figures that appeared only in older city handouts (online/in-person fence $26.50/$36.50, re-roof $26.50, $10 processing/amendment, $5 child-parent link, $10 contractor research fee) are not in the FY 2027 schedule and were dropped rather than guessed; the FY 2027 schedule lists a $11.50 convenience fee for applications not submitted online.

Source: published fee schedule · Verified 11/10/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Carport covers and decks fee (FY 2027)
Flat fee $184.00
$184.00
How this jurisdiction calculates the fee

Carports and decks are charged a flat residential permit fee. SUPERSEDED 2026-10-20 (lane B run 2153, pipeline run 115): San Antonio replaced the FY 2026 Development Fee Schedule (Rev. Oct 2025) with the FY 2027 Development Fee Schedule (cover: "Revised: September 2026"; PDF created 2026-10-06; same docsonline CurrentFeeSchedule.pdf URL, 31 pages, pdftotext readable, 1365 lines read). Fees rose about 15% across the board (e.g. fence $25.00 to $28.75, base electrical $50 to $57.50, re-inspection $50 to $57.50). All figures below were read from the FY 2027 document; the earlier FY 2026 figures were removed. Figures that appeared only in older city handouts (online/in-person fence $26.50/$36.50, re-roof $26.50, $10 processing/amendment, $5 child-parent link, $10 contractor research fee) are not in the FY 2027 schedule and were dropped rather than guessed; the FY 2027 schedule lists a $11.50 convenience fee for applications not submitted online.

Source: published fee schedule · Verified 11/9/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Electrical permit base fee
Flat fee $57.50
$57.50
○Service rating 0-200 amps
Flat fee $3.74
$3.74
○Service rating 201-600 amps
Flat fee $7.48
$7.48
○Panelboard/loadcenters fee
Flat fee $5.58
$5.58
○Gear switchboard with up to 4 handles
Flat fee $11.79
$11.79
○Gear switchboard additional handles
Flat fee $1.84
$1.84
○Transformer 1-50 kVA
Flat fee $4.95
$4.95
How this jurisdiction calculates the fee

Electrical work on an existing residence is charged a base fee plus per-item charges based on service rating and gear installed. SUPERSEDED 2026-10-20 (lane B run 2153, pipeline run 115): San Antonio replaced the FY 2026 Development Fee Schedule (Rev. Oct 2025) with the FY 2027 Development Fee Schedule (cover: "Revised: September 2026"; PDF created 2026-10-06; same docsonline CurrentFeeSchedule.pdf URL, 31 pages, pdftotext readable, 1365 lines read). Fees rose about 15% across the board (e.g. fence $25.00 to $28.75, base electrical $50 to $57.50, re-inspection $50 to $57.50). All figures below were read from the FY 2027 document; the earlier FY 2026 figures were removed. Figures that appeared only in older city handouts (online/in-person fence $26.50/$36.50, re-roof $26.50, $10 processing/amendment, $5 child-parent link, $10 contractor research fee) are not in the FY 2027 schedule and were dropped rather than guessed; the FY 2027 schedule lists a $11.50 convenience fee for applications not submitted online.

Source: published fee schedule · Verified 11/10/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Residential fence fee (FY 2027 Development Fee Schedule)
Flat fee $28.75
$28.75
○Convenience fee, application not submitted through online portal
Flat fee $11.50
$11.50
How this jurisdiction calculates the fee

A residential fence permit is charged a flat fee. SUPERSEDED 2026-10-20 (lane B run 2153, pipeline run 115): San Antonio replaced the FY 2026 Development Fee Schedule (Rev. Oct 2025) with the FY 2027 Development Fee Schedule (cover: "Revised: September 2026"; PDF created 2026-10-06; same docsonline CurrentFeeSchedule.pdf URL, 31 pages, pdftotext readable, 1365 lines read). Fees rose about 15% across the board (e.g. fence $25.00 to $28.75, base electrical $50 to $57.50, re-inspection $50 to $57.50). All figures below were read from the FY 2027 document; the earlier FY 2026 figures were removed. Figures that appeared only in older city handouts (online/in-person fence $26.50/$36.50, re-roof $26.50, $10 processing/amendment, $5 child-parent link, $10 contractor research fee) are not in the FY 2027 schedule and were dropped rather than guessed; the FY 2027 schedule lists a $11.50 convenience fee for applications not submitted online.

Source: published fee schedule · Verified 11/10/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Residential repair existing re-roof fee (FY 2027 Development Fee Schedule)
Flat fee $28.75
$28.75
How this jurisdiction calculates the fee

A residential re-roof permit is charged a flat fee. SUPERSEDED 2026-10-20 (lane B run 2153, pipeline run 115): San Antonio replaced the FY 2026 Development Fee Schedule (Rev. Oct 2025) with the FY 2027 Development Fee Schedule (cover: "Revised: September 2026"; PDF created 2026-10-06; same docsonline CurrentFeeSchedule.pdf URL, 31 pages, pdftotext readable, 1365 lines read). Fees rose about 15% across the board (e.g. fence $25.00 to $28.75, base electrical $50 to $57.50, re-inspection $50 to $57.50). All figures below were read from the FY 2027 document; the earlier FY 2026 figures were removed. Figures that appeared only in older city handouts (online/in-person fence $26.50/$36.50, re-roof $26.50, $10 processing/amendment, $5 child-parent link, $10 contractor research fee) are not in the FY 2027 schedule and were dropped rather than guessed; the FY 2027 schedule lists a $11.50 convenience fee for applications not submitted online.

Source: published fee schedule · Verified 11/10/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Document Management Fee for retaining wall plans (records-handling charge, NOT the permit fee)
Flat fee $10.00
$10.00
○Permit Processing/Amendment Fee
Flat fee $10.00
$10.00
○Re-inspection Fee (all Trades)
Flat fee $50.00
$50.00
○Inspection for which no fee is specifically indicated (per hour with 1 hour minimum)
Flat fee $100.00
$100.00
How this jurisdiction calculates the fee

No retaining-wall permit price is published. The Development Fee Schedule was read in full and its Flat Fees for Miscellaneous Residential Projects table, which is where San Antonio prices named residential items such as carports and decks, foundations, fences and re-roofs, has no retaining wall row. The only retaining wall entry anywhere in the schedule is a $10.00 Document Management Fee, which is a records-handling charge for retaining wall plans and is not the permit fee. The schedule states as a general rule that commercial and existing residential building plan review and permit fees are based upon valuation while new residential fees are based upon square footage, so a retaining wall permit is assessed on valuation, but the schedule does not publish a figure specific to it. Confirm the charge with Development Services before submitting.

Source: published fee schedule · Verified 11/4/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

How this jurisdiction calculates the fee

No shed or accessory-structure permit price is published. The Development Fee Schedule was read in full and neither its Flat Fees for Miscellaneous Residential Projects table, which is where San Antonio prices named residential items such as carports and decks, foundations, fences and re-roofs, nor any other table carries a row for a shed, storage building or detached accessory structure. The schedule states as a general rule that new residential building plan review and permit fees, including the trade permit fees, are based upon square footage and are read from the SF Range table, while commercial and existing residential fees are based upon valuation; a shed requiring a permit would be assessed on that basis, but no figure specific to it is published. Confirm the charge with Development Services before submitting.

Source: published fee schedule · Verified 8/12/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Plumbing - Permit Base Fee (commercial and existing residential)
Flat fee $57.50
$57.50
○Water Heater, Vent (gas/electric)
Flat fee $9.20
$9.20
○Plumbing Fixture; MRFPSS Fixture/Sprinkler Head; Roof Drain; Reverse Osmosis (per unit)
Flat fee $8.05
$8.05
○Water Softener Fee
Flat fee $19.55
$19.55
How this jurisdiction calculates the fee

Plumbing work on an existing residence is charged a plumbing permit base fee plus a per-unit charge for each fixture or item installed. SUPERSESSION CORRECTED 2026-10-21 (lane B run 2170): the same CurrentFeeSchedule.pdf URL now serves the FY 2027 Development Fee Schedule (Revised September 2026, 1396 lines pdftotext full read), replacing FY 2026; figures rewritten from FY2027 (about 15 pct uplift). The $10.00 permit administrative processing fee stored under FY2026 does not appear in FY2027 and was dropped, not guessed.

Source: published fee schedule · Verified 11/10/2026

See the full write-up: San Antonio building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.