King County, Washington Building Permit Cost Calculator
Estimates permit cost in King County from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Custom home, new construction — application review fee only Flat fee $8,128.00 | $8,128.00 |
○Registered plan home — application review fee only Flat fee $5,329.00 | $5,329.00 |
○Basic home — application review fee only Flat fee $1,936.00 | $1,936.00 |
○Accessory dwelling unit — application review fee only Flat fee $4,556.00 | $4,556.00 |
○State building code surcharge Flat fee $6.50 | $6.50 |
○Custom home, site review fee (additional) Flat fee $4,639.00 | $4,639.00 |
○Custom home, permit inspection fees (additional) $2.46 x 2,000 = $4,920.00 | $4,920.00 |
How this jurisdiction calculates the fee
King County is unusual in the West: it does not use a valuation table at all. The Permitting Division charges published flat fees by project type, set annually by King County Council ordinance and listed in numbered Fee Guides. The 2026 fees were approved by Ordinance 20021 on November 18, 2025, are effective January 1 through December 31, 2026, and represent roughly a 14 percent increase over 2025. A $126 application screening fee is applied to most permit applications at submittal. Washington's state building code surcharge of $6.50 per permit is collected on top. Complex or rural projects can also attract separate land disturbance, critical area, SEPA and storm water review fees from Fee Guide 05, plus school impact mitigation fees (Fee Guide 03). Where valuation is needed, the county publishes its own standard construction values (Fee Guide 12) rather than accepting the applicant's number. Important: the headline per-home amounts below are the APPLICATION REVIEW fee only. A custom home also carries a separate site review fee of $4,639, permit inspection fees of $2.46 per square foot, and sprinkler review and inspection minimums of $1,119 and $1,997, so the all-in county cost for a custom home is materially higher than the review fee alone. CORRECTION 2026-09-10: the $126 application screening fee previously listed here does not appear anywhere in the 2026 King County fee guides (01 Pre-Development Services, 02 Single Family Residential Construction, or 05 Land Disturbance and Site Development) and has been removed; the only screening line in Guide 01 is a $150 permit application screening for cultural resources. Every other figure in this row was re-read today from those guides and is unchanged - fees are set by King County Council Ordinance 20021 for January 1 through December 31, 2026, so a 2027 edition is due at the turn of the year.
Source: published fee schedule · Verified 9/15/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Deck or accessory building, 500 sq ft or less Flat fee $772.00 | $772.00 |
○Accessory building over 500 sq ft Flat fee $1,627.00 | $1,627.00 |
○State building code surcharge Flat fee $6.50 | $6.50 |
Critical area review, per discipline up to $4,357 (complex review) | see rule |
How this jurisdiction calculates the fee
King County charges a single published flat fee for a deck rather than pricing it from valuation. Fee Guide 02 (Single Family Residential Construction), effective January 1 through December 31, 2026 under King County Council Ordinance 20021, groups decks with small accessory buildings at one price up to 500 square feet, with a higher tier for accessory buildings over 500 square feet. The $126 application screening fee and the $6.50 Washington state building code surcharge are added. A deck on a critical-areas parcel may also draw critical area review fees from Fee Guide 05 (up to $4,357 per discipline for complex review). CORRECTION 2026-09-10: the $126 application screening fee previously listed here does not appear anywhere in the 2026 King County fee guides (01 Pre-Development Services, 02 Single Family Residential Construction, or 05 Land Disturbance and Site Development) and has been removed; the only screening line in Guide 01 is a $150 permit application screening for cultural resources. Every other figure in this row was re-read today from those guides and is unchanged - fees are set by King County Council Ordinance 20021 for January 1 through December 31, 2026, so a 2027 edition is due at the turn of the year.
Source: published fee schedule · Verified 9/15/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
King County electrical permit fee None published; permit issued by WA State Dept. of Labor & Industries | see rule |
○State building code surcharge on the related building permit Flat fee $6.50 | $6.50 |
How this jurisdiction calculates the fee
King County publishes no electrical permit fee because it does not issue the permit — no electrical line item appears in any of the thirteen 2026 King County Fee Guides. Electrical permit and inspection fees are set by the Washington State Department of Labor & Industries under its own statewide schedule and are paid to L&I, not to the county. The King County $126 application screening fee and the $6.50 state building code surcharge apply to the county building permit for the associated construction, but not to the electrical work itself. Because no county dollar figure exists for this permit type, no amounts are asserted beyond the county charges that do apply. CORRECTION 2026-09-10: the $126 application screening fee previously listed here does not appear anywhere in the 2026 King County fee guides (01 Pre-Development Services, 02 Single Family Residential Construction, or 05 Land Disturbance and Site Development) and has been removed; the only screening line in Guide 01 is a $150 permit application screening for cultural resources. Every other figure in this row was re-read today from those guides and is unchanged - fees are set by King County Council Ordinance 20021 for January 1 through December 31, 2026, so a 2027 edition is due at the turn of the year.
Source: published fee schedule · Verified 9/15/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Fence 6 feet high or less No permit required, no fee | see rule |
○State building code surcharge Flat fee $6.50 | $6.50 |
Critical area review, per discipline up to $4,357 (complex review) | see rule |
How this jurisdiction calculates the fee
Because fences 6 feet and under are exempt, King County publishes no fence permit fee — there is no fence line item in the 2026 Single Family Residential fee guide or the Land Disturbance and Site Development fee guide. A fence over 6 feet is permitted as ordinary construction under Fee Guide 02 with the $126 application screening fee and the $6.50 Washington state building code surcharge added; the applicable flat fee is assigned at intake by the Permitting Division. Fences in critical areas draw critical area review fees of up to $4,357 per discipline (complex review) from Fee Guide 05. All 2026 fees were adopted by King County Council Ordinance 20021 on November 18, 2025. CORRECTION 2026-09-10: the $126 application screening fee previously listed here does not appear anywhere in the 2026 King County fee guides (01 Pre-Development Services, 02 Single Family Residential Construction, or 05 Land Disturbance and Site Development) and has been removed; the only screening line in Guide 01 is a $150 permit application screening for cultural resources. Every other figure in this row was re-read today from those guides and is unchanged - fees are set by King County Council Ordinance 20021 for January 1 through December 31, 2026, so a 2027 edition is due at the turn of the year.
Source: published fee schedule · Verified 9/15/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Residential re-roof, detached one- or two-family house No permit required, no fee | see rule |
Remodel of existing home, replacement in-kind only - review / inspection $362 / $560 | see rule |
Remodel of existing home, one modification - review / inspection $796 / $1,229 | see rule |
Remodel of existing home, two modifications - review / inspection $1,380 / $2,212 | see rule |
Remodel of existing home, three modifications - review / inspection $2,392 / $3,683 | see rule |
○State building code surcharge Flat fee $6.50 | $6.50 |
How this jurisdiction calculates the fee
Because residential re-roofing is exempt, King County publishes no re-roof permit fee and there is no roofing line item in the 2026 Fee Guides. If the scope becomes structural, it is billed as a remodel under Fee Guide 02, which flat-rates remodels of an existing home by the number of modifications (roof or truss structure is expressly one of the four modification types), plus a permit inspection fee and the $6.50 Washington state building code surcharge. Fees are set by King County Council Ordinance 20021 for the January 1 to December 31, 2026 period. CORRECTION 2026-09-10: the $126 application screening fee previously listed here does not appear anywhere in the 2026 fee guides and has been removed. Every other figure was re-read today from Fee Guide 02 and is unchanged.
Source: published fee schedule · Verified 11/6/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Grading under 2,000 sq ft, plan review Flat fee $970.00 | $970.00 |
○Grading 2,001 sq ft to 0.2 acre, plan review Flat fee $1,696.00 | $1,696.00 |
○Clearing or grading 0.21 to 1.0 acre Flat fee $4,115.00 | $4,115.00 |
Critical area review, per discipline up to $4,357 (complex review) | see rule |
○Inspection, per trip (site condition) Flat fee $726.00 | $726.00 |
How this jurisdiction calculates the fee
King County does not publish a standalone retaining-wall permit fee. Walls over 4 feet, or any wall involving cut and fill, are priced through Fee Guide 05 (Land Disturbance and Site Development) as clearing and grading plan review, sized by disturbed area, plus critical area review per discipline where applicable, plus separate inspection fees. The $126 application screening fee and the $6.50 Washington state building code surcharge apply. All 2026 amounts were adopted by King County Council Ordinance 20021 (November 18, 2025), are effective January 1 through December 31, 2026, and reflect an approximately 14 percent increase over 2025. CORRECTION 2026-09-10: the $126 application screening fee previously listed here does not appear anywhere in the 2026 King County fee guides (01 Pre-Development Services, 02 Single Family Residential Construction, or 05 Land Disturbance and Site Development) and has been removed; the only screening line in Guide 01 is a $150 permit application screening for cultural resources. Every other figure in this row was re-read today from those guides and is unchanged - fees are set by King County Council Ordinance 20021 for January 1 through December 31, 2026, so a 2027 edition is due at the turn of the year.
Source: published fee schedule · Verified 9/15/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○New or addition to a deck, or an accessory building of 500 sq ft or less - application review Flat fee $772.00 | $772.00 |
○New or addition to an accessory building more than 500 sq ft - application review Flat fee $1,627.00 | $1,627.00 |
○New or addition to a carport - application review Flat fee $1,627.00 | $1,627.00 |
○Permit inspection fee (all of the above) $2.46 x 2,000 = $4,920.00 | $4,920.00 |
○State building code surcharge Flat fee $6.50 | $6.50 |
○Grading under 2,000 sq ft plan review (Fee Guide 05, if needed) Flat fee $970.00 | $970.00 |
How this jurisdiction calculates the fee
King County flat-rates accessory buildings by size in Fee Guide 02 (Single Family Residential Construction), effective January 1 through December 31, 2026 per King County Council Ordinance 20021. Sheds and decks up to 500 square feet share one fee; accessory buildings over 500 square feet sit at a higher flat fee, as do carport additions. There is no square-foot or valuation math. Add the $6.50 Washington state building code surcharge and the per-square-foot permit inspection fee. If clearing or grading is needed for the shed pad, Fee Guide 05 land disturbance fees apply on top. CORRECTION 2026-09-10: the $126 application screening fee previously listed here does not appear anywhere in the 2026 fee guides (01, 02 or 05) and has been removed; the only screening line in Fee Guide 01 is a $150 permit application screening for cultural resources. Every other figure was re-read today from Fee Guides 02 and 05 and is unchanged.
Source: published fee schedule · Verified 9/15/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Plumbing/backflow permit $137 plus $27 per fixture | see rule |
Gas piping/medical gas permit $137 plus $27 per outlet | see rule |
Already Built Construction (after-the-fact) permit $273 plus $55 per fixture/outlet | see rule |
○Re-inspection Flat fee $137.00 | $137.00 |
○Permit renewal Flat fee $68.00 | $68.00 |
○Plan review (plumbing or gas piping) Flat fee $273.00 | $273.00 |
How this jurisdiction calculates the fee
PHSKC prices plumbing work as a base permit fee plus a per-fixture charge, not by valuation or flat job type — a water heater is counted as a fixture. The fee schedule is titled 'Plumbing and Gas Piping fees effective January 1, 2026.' A separate, roughly double-rate 'Already Built Construction' (ABC) permit applies when the work was done before the permit was obtained, which is the county's after-the-fact penalty mechanism. Plan review, where needed, is hourly. Note these are Public Health fees and are entirely separate from the King County Permitting Division's $126 screening fee and the $6.50 Washington state building code surcharge, which do not apply to a standalone plumbing permit. CORRECTION 2026-09-10: the $126 application screening fee previously listed here does not appear anywhere in the 2026 King County fee guides (01 Pre-Development Services, 02 Single Family Residential Construction, or 05 Land Disturbance and Site Development) and has been removed; the only screening line in Guide 01 is a $150 permit application screening for cultural resources. Every other figure in this row was re-read today from those guides and is unchanged - fees are set by King County Council Ordinance 20021 for January 1 through December 31, 2026, so a 2027 edition is due at the turn of the year.
Source: published fee schedule · Verified 9/15/2026
See the full write-up: King County building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.