Home / Calculators / Building Permit Fee Calculator

Tacoma, Washington Building Permit Cost Calculator

Estimates permit cost in Tacoma from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

How this jurisdiction calculates the fee

Tacoma sets no building permit fee amounts in the municipal code; TMC Chapter 2.09 (Fee Code) directs that fees be charged in accordance with the PDS Fee Schedule, which is ratified by City Council resolution or approved by the City Manager and kept on file at tacomapermits.org. The permit fee is based on the valuation of the work as determined by the Building Official, and for new structures and additions valuation is computed from floor area using the most recent ICC Building Valuation Data. A plan review fee is charged on every building permit as a percentage of the permit fee, with a new plan review fee for each substantial resubmittal, and fee amounts are adjusted annually by the Seattle-Tacoma-Bremerton CPI for All Urban Consumers. No dollar figures are recorded here because the PDS Fee Schedule PDF could not be retrieved: tacomapermits.org returns an HTTP 202 bot-challenge page instead of the document.

Source: published fee schedule · Verified 8/9/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

How this jurisdiction calculates the fee

A deck needs a building permit in Tacoma and carries no deck-specific fee. Under TMC Chapter 2.09 (Fee Code) the fee is based on the valuation of the work as determined by the Building Official and charged at the rates in the PDS Fee Schedule kept on file at tacomapermits.org, plus a plan review fee set as a percentage of the permit fee. No dollar figures are recorded here because the PDS Fee Schedule PDF could not be retrieved: tacomapermits.org returns an HTTP 202 bot-challenge page instead of the document.

Source: published fee schedule · Verified 8/9/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Table A - Overhead Service, 1-200A and up to 2500 sq. ft. (up to 2 inspections)
Flat fee $153.00
$153.00
○Table A - Underground to Pole and Underground Service with underground wiring, 1-200A and up to 2500 sq. ft. (up to 4 inspections)
Flat fee $306.00
$306.00
○Table A - Feeder Only, 1-200A and up to 2500 sq. ft. (up to 2 inspections)
Flat fee $125.00
$125.00
○Table A - Overhead Service, up to 400A or up to 4000 sq. ft. (up to 2 inspections)
Flat fee $230.00
$230.00
○Table A - Underground to Pole and Underground Service with underground wiring, up to 400A or up to 4000 sq. ft. (up to 4 inspections)
Flat fee $382.00
$382.00
○Table A - Feeder Only, up to 400A or up to 4000 sq. ft. (up to 2 inspections)
Flat fee $140.00
$140.00
○Branch circuit alterations and repairs: 1 to 4 new circuits, circuit extensions, or alterations where the service or feeder is not modified, increased, relocated, or replaced (includes two inspections)
Flat fee $89.00
$89.00
○Branch circuit alterations and repairs: each additional circuit
Flat fee $10.00
$10.00
○Service alterations and repairs: repair or replacement of one of the listed items, such as service panel, service mast, service entrance conductors, weather head, service attachment bracket, meter socket, main breaker, or utility disconnect (includes one inspection)
Flat fee $77.00
$77.00
○Service alterations and repairs: more than one listed item altered or replaced
Flat fee $153.00
$153.00
○Hardwired low voltage, single-family dwellings, for control panels and devices such as fire alarm systems, data systems, intrusion alarms, HVAC systems and thermostats (includes one inspection)
Flat fee $77.00
$77.00
○Temporary services 1-200 amps single phase (includes one inspection)
Flat fee $77.00
$77.00
○Residential swimming pool, in addition to any other fees listed (includes three inspections)
Flat fee $230.00
$230.00
○Generator transfer panel and equipment (includes one inspection)
Flat fee $105.00
$105.00
○PV systems (includes two inspections)
Flat fee $153.00
$153.00
Table B - Value of Electrical Construction $0 - $1,000
$133 for the first $1,000 or fraction thereof.
see rule
○Table B - Value of Electrical Construction $1,001 - $5,000
$133.00 for the first $1,000.00, plus 2,490 x $5.35 for $249,000.00 over (rounded up per "or fraction thereof") = $13,454.50
$13,454.50
○Table B - Value of Electrical Construction $5,001 - $50,000
$347.00 for the first $5,000.00, plus 2,450 x $2.70 for $245,000.00 over (rounded up per "or fraction thereof") = $6,962.00
$6,962.00
○Required inspection on services off for one year or more (includes one inspection)
Flat fee $77.00
$77.00
○Variance processing fee under Section 12.06A.155
Flat fee $177.00
$177.00
○Plan review where no permit has been purchased and the project has been canceled, or where excessive time is required to review plans submitted with incomplete information or extensive errors, per hour
Flat fee $80.00
$80.00
○Trip fee, per trip, when the permit holder notifies the Electrical Inspections Office that work is ready for inspection when it is not
Flat fee $77.00
$77.00
○Failing to complete corrections within 15 days as required
Flat fee $77.00
$77.00
○Occupying a building, living unit, or business space without final electrical approval
Flat fee $348.00
$348.00
Work performed without a Permit, which does not pertain to emergency work where a permit is purchased the next business day
4X regular Permit fee
see rule
○Permit cancellation administrative process fee
Flat fee $77.00
$77.00
How this jurisdiction calculates the fee

Electrical permits within Tacoma are issued by the City of Tacoma, Department of Public Utilities, Light Division, doing business as Tacoma Power, and fees are set by Tacoma Municipal Code 12.06A.250, with plan review charges in 12.06A.240 and penalty fees in 12.06A.260. Fees for single-family dwelling and mobile home services, service changes and service upgrades come from Table A and include branch circuit wiring from the services or feeders; all wiring by the same permit holder on single-family dwellings of 400 amps/4,000 sq. ft. or less is included under the Table A fees unless otherwise noted. Single-family dwellings exceeding 400 amps or 4,000 square feet are charged from the value-based Table B, using the documented value of the electrical construction. Unless otherwise noted, when multiple inspections are required the permit fee shall not be less than $77 per 1/2 hour of inspection time. Current standard fees for connecting electrical services to the Tacoma Power system, the permit fees, and any penalties previously assessed must be paid before an electrical permit will be issued.

Source: published fee schedule · Verified 9/25/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

How this jurisdiction calculates the fee

Tacoma requires no permit for a fence up to seven feet that is structurally sound, sits entirely on private property and does not block the view for traffic entering or turning onto the street, so the ordinary residential fence carries no permit fee at all. A fence outside those limits is permitted as a building permit, with the fee based on the valuation of the work under TMC Chapter 2.09 (Fee Code) and charged at the rates in the PDS Fee Schedule kept on file at tacomapermits.org. No dollar figures are recorded here because the PDS Fee Schedule PDF could not be retrieved: tacomapermits.org returns an HTTP 202 bot-challenge page instead of the document.

Source: published fee schedule · Verified 8/9/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

How this jurisdiction calculates the fee

A single family home or duplex reroof that meets the conditions in Tacoma Municipal Code 2.02.540 needs no building permit and so carries no building permit fee. A reroof that falls outside those conditions is permitted as a building permit, with the fee based on the valuation of the work as determined by the Building Official under TMC Chapter 2.09 (Fee Code) and charged at the rates in the PDS Fee Schedule kept on file at tacomapermits.org, plus a plan review fee set as a percentage of the permit fee. No dollar figures are recorded here because the PDS Fee Schedule PDF could not be retrieved: tacomapermits.org returns an HTTP 202 bot-challenge page instead of the document.

Source: published fee schedule · Verified 8/9/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

How this jurisdiction calculates the fee

A retaining wall over four feet measured from the footing base to the top of the wall, or any wall carrying a surcharge, needs a building permit in Tacoma; walls at or under that limit without surcharge do not, and carry no building permit fee. For a permitted wall the fee is based on the valuation of the work as determined by the Building Official under TMC Chapter 2.09 (Fee Code), charged at the rates in the PDS Fee Schedule kept on file at tacomapermits.org, plus a plan review fee set as a percentage of the permit fee. A separate Site Development permit under TMC Chapter 2.19 can add its own fee where the excavation exemptions do not reach, for example in a Critical Area or where grading exceeds 50 cubic yards. No dollar figures are recorded here because the PDS Fee Schedule PDF could not be retrieved: tacomapermits.org returns an HTTP 202 bot-challenge page instead of the document.

Source: published fee schedule · Verified 8/9/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

How this jurisdiction calculates the fee

A new detached accessory structure of 200 square feet or more needs a building permit in Tacoma; below that threshold no building permit and therefore no building permit fee applies. For a structure that does need a permit, TMC Chapter 2.09 (Fee Code) bases the fee on the valuation of the work as determined by the Building Official, computed from floor area using the most recent ICC Building Valuation Data for new structures, at the rates in the PDS Fee Schedule kept on file at tacomapermits.org, plus a plan review fee set as a percentage of the permit fee. No dollar figures are recorded here because the PDS Fee Schedule PDF could not be retrieved: tacomapermits.org returns an HTTP 202 bot-challenge page instead of the document.

Source: published fee schedule · Verified 8/9/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Single-Family and Duplex Buildings plumbing permit, covering installation, repair, alteration or replacement of a water heater · add-on
2.81% of Construction Value, Minimum Fee $190 — select the permit fee line above to calculate
see rule
○E-permits: Plumbing Permits
Flat fee $140.00
$140.00
○Reinspections, per each inspection
Flat fee $190.00
$190.00
○Inspections for which no fee is specifically indicated, per each inspection
Flat fee $190.00
$190.00
○Minimum counter transaction fee
Flat fee $94.00
$94.00
Work without permits
Double fee of permit and plan review fees or, $350, whichever is greater
see rule
How this jurisdiction calculates the fee

Plumbing permit fees for single-family and duplex buildings cover installation, repair, alteration or replacement of items including a water heater, and are charged as a percentage of construction value with a minimum fee; the valuation used in computing the permit fee is the total value of all construction work for which the permit is issued. This fee is not applicable to combination permits for new construction, additions or remodels of single-family and duplex buildings. Plumbing work handled as an e-permit is charged a flat fee instead; plan review fees are not charged on e-permit types, all other fees and surcharges apply, and e-permits are nonrefundable once issued. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98) BY PRESENCE CONFIRMATION ONLY. tacomapermits.org now sits behind a SiteGround robot challenge: the cited PDF returns HTTP 202 with a 244-byte "Robot Challenge Screen" to curl, and headless Chromium renders the same interstitial ("Checking the site connection security", a JavaScript proof-of-work with an sgchallenge token and a /.well-known/sgcaptcha/ submit URL). PER LANE POLICY THE PROOF-OF-WORK WAS NOT SOLVED. WebFetch reached the document and confirmed it is still headed "PDS FEE SCHEDULE - Effective January 1, 2026", unchanged from the edition this row was verified against, and quoted back the single-family and duplex plumbing line at "2.81% of Construction Value Minimum Fee $190" and the "Minimum counter transaction fee $94" verbatim. No figure was rewritten and none was contradicted. HOST TO WATCH: if tacomapermits.org blocks a second consecutive pass, Tacoma should be escalated for a human read rather than presence-confirmed again.

Source: published fee schedule · Verified 9/28/2026

See the full write-up: Tacoma building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.