Seattle, Washington Building Permit Cost Calculator
Estimates permit cost in Seattle from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○SDCI base fee Flat fee $292.00 | $292.00 |
○Minimum permit fee or plan review fee for value-based fees Flat fee $292.00 | $292.00 |
Total valuation $0 to $1,000 $325 for the first $1,000 of value or fraction thereof | see rule |
Total valuation $1,001 to $25,000 $325 for the first $1,000 of value plus $1.60 for each additional $100 of value or fraction thereof | see rule |
Total valuation $25,001 to $50,000 $709 for the first $25,000 of value plus $1.55 for each additional $100 of value or fraction thereof | see rule |
Total valuation $50,001 to $75,000 $1,096.50 for the first $50,000 of value plus $1.50 for each additional $100 of value or fraction thereof | see rule |
Total valuation $75,001 to $100,000 $1,471.50 for the first $75,000 of value plus $1.40 for each additional $100 of value or fraction thereof | see rule |
Total valuation $100,001 to $175,000 $1,821.50 for the first $100,000 of value plus $7.75 for each additional $1,000 of value or fraction thereof | see rule |
Total valuation $175,001 to $250,000 $2,402.75 for the first $175,000 of value plus $7.75 for each additional $1,000 of value or fraction thereof | see rule |
Total valuation $250,001 to $500,000 $2,984 for the first $250,000 of value plus $7.50 for each additional $1,000 of value or fraction thereof | see rule |
Subject-to-field-inspection permit · add-on 100% of the Development Fee Index for the permit fee plus 40% for plan review — select the permit fee line above to calculate | see rule |
○Minimum plan review fee for subject-to-field-inspection value-based plan review Flat fee $116.75 | $116.75 |
Single-family earthquake retrofit in full compliance with the prescriptive plan set Base fee x 1 | see rule |
Unenclosed swimming pool accessory to a Group R-3 occupancy Base fee x 4 | see rule |
Technology fee Five percent of all fees charged under the permit, review, inspection, and land use chapters | see rule |
How this jurisdiction calculates the fee
Construction permit and plan review fees are based on project valuation using the Development Fee Index table in the Fee Subtitle; a building permit is charged 100 percent of the Development Fee Index for the permit fee plus 100 percent for the plan review fee, and a five percent technology fee is added.
Source: published fee schedule · Verified 9/18/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Subject-to-field-inspection permit · add-on 100% of the Development Fee Index for the permit fee plus 40% for plan review — select the permit fee line above to calculate | see rule |
○Minimum permit fee or plan review fee for value-based fees Flat fee $292.00 | $292.00 |
○Minimum plan review fee for subject-to-field-inspection value-based plan review Flat fee $116.75 | $116.75 |
How this jurisdiction calculates the fee
Most decks require only a subject-to-field-inspection construction permit, charged 100 percent of the Development Fee Index for the permit fee plus 40 percent for plan review, with a five percent technology fee added.
Source: published fee schedule · Verified 9/18/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Plan-reviewed electrical work, value $0 to $1,000 $260 for the first $1,000 of value or fraction thereof | see rule |
Plan-reviewed electrical work, value $1,001 to $5,000 $260 for the first $1,000 of value plus $6 for each additional $100 of value or fraction thereof | see rule |
○Minimum fee for a standard Online Trade-Construction (OTC) self-issued electrical permit Flat fee $105.12 | $105.12 |
○Administrative fee Flat fee $55.48 | $55.48 |
○Service repair (mast and meter base only) Flat fee $146.00 | $146.00 |
○Temporary construction power Flat fee $146.00 | $146.00 |
○New or altered electrical service up to 125 amperes Flat fee $146.00 | $146.00 |
○New or altered electrical service 150 to 200 amperes Flat fee $292.00 | $292.00 |
○New or altered electrical service 225 to 350 amperes Flat fee $365.00 | $365.00 |
○New or altered branch circuit or feeder, 60 to 200 amperes Flat fee $146.00 | $146.00 |
○Heaters and furnaces, 3 kW to 15 kW Flat fee $23.36 | $23.36 |
○Level 2 car charger, 30 to 50 amperes Flat fee $52.56 | $52.56 |
How this jurisdiction calculates the fee
Electrical fees depend on what is installed or altered; permits that require plan review are charged from a value-based table, while permits issued without plan review are charged per item of equipment, and all fees are subject to an additional technology fee.
Source: published fee schedule · Verified 9/18/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Subject-to-field-inspection permit · add-on 100% of the Development Fee Index for the permit fee plus 40% for plan review — select the permit fee line above to calculate | see rule |
○Minimum permit fee or plan review fee for value-based fees Flat fee $292.00 | $292.00 |
How this jurisdiction calculates the fee
Fences that require a permit generally use a subject-to-field-inspection construction permit, charged 100 percent of the Development Fee Index for the permit fee plus 40 percent for plan review, with a five percent technology fee added.
Source: published fee schedule · Verified 9/18/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Commercial re-roofing permit Base fee x .5 | see rule |
○SDCI base fee Flat fee $292.00 | $292.00 |
How this jurisdiction calculates the fee
The Fee Subtitle sets a separate fee for a commercial re-roofing permit; roofing work that requires a construction permit is otherwise charged value-based fees from the Development Fee Index, with a five percent technology fee added.
Source: published fee schedule · Verified 9/18/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum permit fee or plan review fee for value-based fees Flat fee $292.00 | $292.00 |
○SDCI base fee Flat fee $292.00 | $292.00 |
How this jurisdiction calculates the fee
Retaining walls that require a permit are charged value-based construction permit and plan review fees from the Development Fee Index, with a five percent technology fee added.
Source: published fee schedule · Verified 9/18/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Subject-to-field-inspection permit · add-on 100% of the Development Fee Index for the permit fee plus 40% for plan review — select the permit fee line above to calculate | see rule |
○Minimum permit fee or plan review fee for value-based fees Flat fee $292.00 | $292.00 |
How this jurisdiction calculates the fee
Most sheds that require a permit use a subject-to-field-inspection permit, charged 100 percent of the Development Fee Index for the permit fee plus 40 percent for plan review, with a five percent technology fee added.
Source: published fee schedule · Verified 9/18/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Plumbing/backflow permit (a single water heater is one fixture) $137 plus $27 per fixture | see rule |
Gas piping/medical gas permit (a gas-fired water heater is one outlet) $137 plus $27 per outlet | see rule |
Already Built Construction (after-the-fact) permit $273 plus $55 per fixture or outlet | see rule |
○Re-inspection Flat fee $137.00 | $137.00 |
○Permit renewal Flat fee $68.00 | $68.00 |
○Administrative fee (permit modification or correction, refund processing) Flat fee $41.00 | $41.00 |
○Plumbing/backflow or gas piping plan review Flat fee $273.00 | $273.00 |
○Inspection outside regular hours Flat fee $410.00 | $410.00 |
○Requested site visit with no permit Flat fee $273.00 | $273.00 |
How this jurisdiction calculates the fee
The Seattle Plumbing Code is enforced by Public Health - Seattle & King County, and Seattle's own SDCI Fee Subtitle at SMC 22.900G.030 provides that fees for plumbing and fuel gas piping are collected by the Director of King County Public Health under its schedule. Permits have been required for replacement water heaters since July 1, 2026, and in most cases this is an over-the-counter plumbing permit. Water heaters of every type (electric, natural gas, LPG, heat pump, solar, storage and tankless) are listed fixtures on a plumbing permit, so a single water heater is charged the plumbing permit base fee plus one per-fixture charge; a gas-fired water heater is also a fuel gas outlet and carries a gas piping permit charged as the base fee plus one per-outlet charge. The controlling schedule is Public Health's Plumbing and Gas Piping fees effective January 1, 2026, which replaced the banded 1 / 2-3 / 4-6 fixture schedule this row previously cited with a base-plus-per-unit structure; the superseded schedule is still reachable at its old URL but is no longer the schedule Environmental Health Services links as current.
Source: published fee schedule · Verified 11/6/2026
See the full write-up: Seattle building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.