B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Spokane, Washington Building Permit Cost Calculator

Estimates permit cost in Spokane from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, job value $1 to $2,000
Flat fee $73.00
$73.00
○Building permit fee, job value $2,001 to $25,000 - variable per $1,000 over $2,000
Flat fee $13.00
$13.00
○Building permit fee, job value $25,001 to $50,000 - base
Flat fee $372.00
$372.00
○Building permit fee, job value $50,001 to $100,000 - base
Flat fee $622.00
$622.00
○Building permit fee, job value $100,001 to $500,000 - base
Flat fee $972.00
$972.00
○Building permit fee, job value $500,001 to $1,000,000 - base
Flat fee $2,972.00
$2,972.00
○Building permit fee, job value over $1,000,000 - base
Flat fee $4,972.00
$4,972.00
○Processing/application fee
Flat fee $65.00
$65.00
How this jurisdiction calculates the fee

Spokane charges building permit fees on the job value (valuation) of the work using a graduated table. Job value of $1 to $2,000 is a flat $73.00; each higher bracket is a base amount plus a per-$1,000 increment (or fraction thereof) applied to the value above the bracket floor. A plan review fee is added as a percentage of the job value fee: 65% for commercial, industrial, mixed use and multifamily over 2 units, 50% for new single-family residences, accessory dwelling units and duplexes, and 25% for SFR and duplex accessory structures, additions and accessory structure remodels. A $65.00 processing/application fee, a technology fee of 2.5%, and a state-determined State Building Code fee also apply. === 2026-10-01 SUPERSESSION WATCH, RECORDED NOT WRITTEN IN: the cited schedule returns HTTP 200 and every stored figure re-reads verbatim in it, so this row is correct today, but the document itself announces its own replacement. Page 1 reads "Development Fee Schedule 2026 / Automatic Annual Adjustment / Effective January 1, 2026, and the first January of each year thereafter, the development fees shall be adjusted by the City of Spokane Building Official for an amount equal to the weighted average of the 2nd quarter Employment Cost Index for State and Local Government Workers (ECI GW) with a weight of 0.7 and the June to June Consumer Price Index for All Urban Consumers West Class BC (CPI-U West BC) with a weight of 0.3", with the adjustment capped at the three-year average of the weighted values, rounded to the nearest dollar above $100 and the nearest dime below, and requiring city council approval plus filing with the city clerk and building official before taking effect. SO EVERY SPOKANE DEVELOPMENT FEE IS SCHEDULED TO MOVE ON 2027-01-01 AND A NEW SCHEDULE WILL BE FILED. SEPARATELY AND MORE URGENTLY, the same page states "Building permit fees shall not be included in the annual automatic adjustment because updates occur semi-annually through the International Code Council (ICC) published updates" - so the building permit valuation figures on the Spokane building row turn over SEMI-ANNUALLY, not annually, and are the faster-decaying half of this jurisdiction. The stored filename carries its own revision date (2026-07-16), which makes a successor easy to spot: watch for a later-dated 2026- or 2027- development-services-fee-schedule file. METHOD NOTE: static.spokanecity.org returns HTTP 403 to a scripted client for bogus paths as well as real ones, so a 403 on a probed successor filename proves nothing here and the department page must be read in a browser context instead.

Source: published fee schedule · Verified 10/1/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, job value $1 to $2,000
Flat fee $73.00
$73.00
○Building permit fee, job value $2,001 to $25,000 - base
Flat fee $73.00
$73.00
○Building permit fee, job value $2,001 to $25,000 - variable per $1,000 over $2,000
Flat fee $13.00
$13.00
○Processing/application fee
Flat fee $65.00
$65.00
How this jurisdiction calculates the fee

Spokane publishes no deck-specific permit fee. A deck is permitted as a building permit and the fee is taken from the job value (valuation) table: $73.00 flat for job value of $1 to $2,000, then $73.00 plus $13.00 for each $1,000 (or fraction thereof) over $2,000 up to $25,000, with higher brackets above that. Plan review for SFR and duplex accessory structures and additions is 25% of the job value fee; the city building permit fee schedule lists decks explicitly in that 25% category. A $65.00 processing/application fee and a technology fee of 2.5% also apply, plus the state-determined State Building Code fee. === 2026-10-01 SUPERSESSION WATCH, RECORDED NOT WRITTEN IN: the cited schedule returns HTTP 200 and every stored figure re-reads verbatim in it, so this row is correct today, but the document itself announces its own replacement. Page 1 reads "Development Fee Schedule 2026 / Automatic Annual Adjustment / Effective January 1, 2026, and the first January of each year thereafter, the development fees shall be adjusted by the City of Spokane Building Official for an amount equal to the weighted average of the 2nd quarter Employment Cost Index for State and Local Government Workers (ECI GW) with a weight of 0.7 and the June to June Consumer Price Index for All Urban Consumers West Class BC (CPI-U West BC) with a weight of 0.3", with the adjustment capped at the three-year average of the weighted values, rounded to the nearest dollar above $100 and the nearest dime below, and requiring city council approval plus filing with the city clerk and building official before taking effect. SO EVERY SPOKANE DEVELOPMENT FEE IS SCHEDULED TO MOVE ON 2027-01-01 AND A NEW SCHEDULE WILL BE FILED. SEPARATELY AND MORE URGENTLY, the same page states "Building permit fees shall not be included in the annual automatic adjustment because updates occur semi-annually through the International Code Council (ICC) published updates" - so the building permit valuation figures on the Spokane building row turn over SEMI-ANNUALLY, not annually, and are the faster-decaying half of this jurisdiction. The stored filename carries its own revision date (2026-07-16), which makes a successor easy to spot: watch for a later-dated 2026- or 2027- development-services-fee-schedule file. METHOD NOTE: static.spokanecity.org returns HTTP 403 to a scripted client for bogus paths as well as real ones, so a 403 on a probed successor filename proves nothing here and the department page must be read in a browser context instead.

Source: published fee schedule · Verified 10/1/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○New Square Footage up to 5000 sq ft - Variable per 100 sq ft
Flat fee $5.00
$5.00
New Square Footage over 5,000 sq ft
$250.00 base plus $3.00 per 100 sq. ft.
see rule
○Alterations/Wiring of Existing Space (per circuit)
Flat fee $7.20
$7.20
○Service, 1-200 Amps
Flat fee $52.00
$52.00
○Service, 201-400 Amps
Flat fee $64.20
$64.20
○Service, 401-600 Amps
Flat fee $78.00
$78.00
○Service, 601-800 Amps
Flat fee $90.10
$90.10
○Service, 801-1,000 Amps
Flat fee $104.00
$104.00
Service, Over 1,000 Amps
$104.00 base plus $7.20 per 100 Amps over 1,000 Amps
see rule
○Service, Over 600V, Surcharge
Flat fee $62.10
$62.10
○Feeder or Subpanel
Flat fee $20.70
$20.70
○Temporary Service
Flat fee $46.60
$46.60
○Ground Work-Ground Ufer
Flat fee $31.10
$31.10
○Extensive Ground Work
Flat fee $109.00
$109.00
○Alarms, Telecommunications, and Other Low-Voltage Control Circuits and Systems (per 2,500 sq. ft.)
Flat fee $13.50
$13.50
○Load Test
Flat fee $46.60
$46.60
○Energy Storage Systems
Flat fee $52.00
$52.00
○Light Standard
Flat fee $10.40
$10.40
Transformer
$41.40 base plus $12.40 per 200 Amps or fraction thereof
see rule
Generator (emergency, standby, and resource recovery)
$41.40 base plus $12.40 per 200 Amps or fraction thereof
see rule
○Processing/Application Fee (except as otherwise identified)
Flat fee $65.00
$65.00
Technology Fee
2.5%
see rule
○Re-Inspection Fee
Flat fee $156.00
$156.00
How this jurisdiction calculates the fee

Electrical permit fees are charged by scope of work: by square footage for new construction, per circuit for alterations and wiring of existing space, and by service size in amps. Generators of 50 kW or less are considered equivalent to a 200 Amp service. | 2026-09-25 (lane B run 1754) RE-VERIFIED VERBATIM, all twenty-three stored figures, against the 2026 Development Services Fee Schedule dated 2026-07-16, which states "Effective January 1, 2026, and the first January of each year thereafter". That self-executing annual clause means the whole Spokane schedule is due to change on 2027-01-01.

Source: published fee schedule · Verified 10/23/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Fence permit fee, per 100 linear feet or fraction thereof
Flat fee $20.00
$20.00
○Processing/application fee
Flat fee $65.00
$65.00
How this jurisdiction calculates the fee

Spokane charges a flat fence permit fee of $20.00 per 100 linear feet of fence, or fraction thereof, so a run of any length up to 100 feet costs $20.00 and a 250-foot run counts as three increments. The fee is a standalone line item in the Development Fee Schedule and is not valuation based. The schedule also carries a $65.00 processing/application fee that applies except where otherwise identified, and a technology fee of 2.5%. Additional fees may apply for historically eligible or listed properties.

Source: published fee schedule · Verified 10/1/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Reroof construction valuation, per square - roof recover
Flat fee $250.00
$250.00
○Reroof construction valuation, per square - existing layers removed, new layer installed
Flat fee $350.00
$350.00
○Reroof construction valuation, per square - new sheathing required
Flat fee $400.00
$400.00
○Building permit fee, job value $1 to $2,000
Flat fee $73.00
$73.00
○Building permit fee, job value $2,001 to $25,000 - variable per $1,000 over $2,000
Flat fee $13.00
$13.00
○Processing fee
Flat fee $65.00
$65.00
○State Building Code fee, residential
Flat fee $6.50
$6.50
How this jurisdiction calculates the fee

Spokane has no flat reroof fee; a reroof is a building permit priced off the job value table, but the city fixes the valuation by roof area rather than by contract price. Valuation is $250 per square (100 square feet) for a roof recover, $350 per square when the existing roof layers are removed and a new layer installed, and $400 per square when new sheathing is required. That valuation is then run through the building permit fee table: $73.00 for job value of $1 to $2,000, and $73.00 plus $13.00 for each $1,000 (or fraction thereof) over $2,000 up to $25,000. A $65.00 processing fee, a technology fee of 2.5% of the building permit fee, and the $6.50 residential State Building Code fee (plus $2.00 per additional dwelling unit) are added. | 2026-09-14 (lane B run 1168) TWO-DOCUMENT SPLIT RECORDED. This is the only Spokane row still citing the 2025 Building Permit Fee Schedule; the other three Spokane rows cite the 2026 Development Fee Schedule (dated 2026-07-16, effective January 1, 2026). Both remain in force for different parts of this row and neither supersedes the other on its face - the 2026 schedule's only supersession-style clause is about the automatic annual CPI/ECI adjustment ("No other fee schedules shall be affected by such automatic adjustments unless expressly noted") and it expressly excludes building permit fees from that adjustment. Confirmed this pass: the reroof valuation rule ($250.00 per square for a roof recover, $350.00 when existing layers are removed and a new layer installed, $400.00 when new sheathing is required) appears ONLY in the 2025 Building Permit Fee Schedule, which static.spokanecity.org serves behind an Incapsula challenge to every curl header set tried (plain, full Safari browser set, same-origin and cross-site Referer) and which was therefore read with WebFetch, used only to CONFIRM figures present, never to conclude one changed or absent. The $73.00 and $13.00 job-value fees and the $65.00 processing fee were read directly from the 2026 Development Fee Schedule with curl + pdftotext -layout. ONE DIVERGENCE TO WATCH, NOT A CHANGE: this row carries "State Building Code fee, residential $6.50", which the 2025 schedule prints; the 2026 Development Fee Schedule replaces that printed amount with "State Building Code Fee - State Determined Fee" and prints no dollar figure. The two are consistent (the newer document defers to the state-set amount rather than contradicting it), so $6.50 was NOT changed. If a future pass finds the state amount published elsewhere, re-base this example on it.

Source: published fee schedule · Verified 10/1/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, job value $1 to $2,000
Flat fee $73.00
$73.00
○Building permit fee, job value $2,001 to $25,000 - variable per $1,000 over $2,000
Flat fee $13.00
$13.00
○Grading permit fee, 10,000 cubic yards or less
Flat fee $150.00
$150.00
○Grading permit fee, each additional 10,000 cubic yards or fraction thereof
Flat fee $31.10
$31.10
○Grading plan review, 1,000 cubic yards or less
Flat fee $78.00
$78.00
○Processing/application fee
Flat fee $65.00
$65.00
How this jurisdiction calculates the fee

Spokane publishes no retaining-wall-specific permit fee. A wall that does not meet one of the exemptions is permitted as a building permit, with the fee taken from the job value (valuation) table: $73.00 for job value of $1 to $2,000, then $73.00 plus $13.00 for each $1,000 (or fraction thereof) over $2,000 up to $25,000. Plan review for SFR and duplex accessory structures is 25% of the job value fee. Where the work involves earth moving, separate grading fees apply: a grading permit fee of $150.00 for 10,000 cubic yards or less plus $31.10 for each additional 10,000 cubic yards or fraction thereof, and grading plan review of $78.00 for 1,000 cubic yards or less. A $65.00 processing/application fee and a technology fee of 2.5% also apply.

Source: published fee schedule · Verified 9/14/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, job value $1 to $2,000
Flat fee $73.00
$73.00
○Building permit fee, job value $2,001 to $25,000 - base
Flat fee $73.00
$73.00
○Building permit fee, job value $2,001 to $25,000 - variable per $1,000 over $2,000
Flat fee $13.00
$13.00
○Processing/application fee
Flat fee $65.00
$65.00
How this jurisdiction calculates the fee

Spokane publishes no shed-specific permit fee. A detached accessory structure of 120 square feet or more needs a building permit, and the fee comes from the job value (valuation) table: $73.00 flat for job value of $1 to $2,000, then $73.00 plus $13.00 for each $1,000 (or fraction thereof) over $2,000 up to $25,000. Plan review for new accessory structures for single-family residences and duplexes is 25% of the job value fee; the city building permit fee schedule lists sheds, garages and pole buildings explicitly in that 25% category. A $65.00 processing/application fee and a technology fee of 2.5% also apply, plus the state-determined State Building Code fee.

Source: published fee schedule · Verified 9/14/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Water Heater
Flat fee $15.50
$15.50
○Hot Water Tank Heat Pump
Flat fee $15.50
$15.50
○Gas Piping: per outlet
Flat fee $4.10
$4.10
○Heating Equipment: 1 to 100,000 BTUs or 32 kW
Flat fee $17.60
$17.60
○Per Plumbing Fixture on a trap, including installs, relocations, replacements and rough-ins of backflow devices, dishwashers, garbage disposals, drains, showers, sinks, toilets, tubs and water softeners
Flat fee $13.50
$13.50
○Processing/Application Fee (except as otherwise identified)
Flat fee $65.00
$65.00
Technology Fee
2.5%
see rule
○Re-Inspection Fee
Flat fee $156.00
$156.00
State Building Code Fee
State Determined Fee
see rule
How this jurisdiction calculates the fee

Water heaters are covered within the mechanical permit fees, which are charged per item of equipment or per outlet; plumbing fixtures on a trap are charged separately under the plumbing permit fees.

Source: published fee schedule · Verified 10/23/2026

See the full write-up: Spokane building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.