Home / Calculators / Building Permit Fee Calculator

Vancouver, Washington Building Permit Cost Calculator

Estimates permit cost in Vancouver from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Valuation $1 to $500
Flat fee $30.93
$30.93
○Valuation $501 to $2,000
$30.93 for the first $500.00, plus 2,495 x $4.01 for $249,500.00 over (rounded up per "or fraction thereof") = $10,035.88
$10,035.88
○Valuation $2,001 to $25,000
$91.17 for the first $2,000.00, plus 248 x $18.43 for $248,000.00 over (rounded up per "or fraction thereof") = $4,661.81
$4,661.81
○Valuation $25,001 to $50,000
$515.55 for the first $25,000.00, plus 225 x $13.28 for $225,000.00 over (rounded up per "or fraction thereof") = $3,503.55
$3,503.55
○Valuation $50,001 to $100,000
$847.99 for the first $50,000.00, plus 200 x $9.21 for $200,000.00 over (rounded up per "or fraction thereof") = $2,689.99
$2,689.99
○Valuation $100,001 to $500,000
$1,308.37 for the first $100,000.00, plus 150 x $7.35 for $150,000.00 over (rounded up per "or fraction thereof") = $2,410.87
$2,410.87
○Valuation $500,001 to $1,000,000
$250,000.00 is within the first $500,000.00, so the base $4,250.93 applies
$4,250.93
○Valuation $1,000,001 and up
$250,000.00 is within the first $1,000,000.00, so the base $7,378.62 applies
$7,378.62
Single Permit Fee, where more than one trade is involved · add-on
160% of Building Only Permit Fee — select the permit fee line above to calculate
see rule
Building Plan Review · add-on
65% of Building Permit Fee (100% for deferred submittal / Fast Track review) — select the permit fee line above to calculate
see rule
Single Permit Plan Review · add-on
50% of Single Permit Fee (77% for deferred submittal / Fast Track review) — select the permit fee line above to calculate
see rule
○Issuance Fee
Flat fee $32.00
$32.00
○State Building Fee per RCW 19.27.085, each residential building permit
Flat fee $6.50
$6.50
○State Building Fee per RCW 19.27.085, each commercial building permit
Flat fee $25.00
$25.00
Mobile Home & Factory Built Structure Permit Fee
$189.61 per section or unit, $379.23 minimum
see rule
Re-inspection fee
$152.00 per hour, minimum $76.00 per inspection
see rule
How this jurisdiction calculates the fee

Building permit fees are read from a valuation-based table (Table I of the City of Vancouver fee schedule, VMC 17.08.130). For new construction and additions the valuation is the calculated value the city derives from gross square footage, type of construction and use of the building, not a submitted contract price. A permit covering structural work only is charged the table amount (Building Only Permit Fee); a permit involving more than one trade is charged 160% of that amount (Single Permit Fee). Plan review is added on top at 65% of the Building Only permit fee or 50% of the Single Permit fee, rising for deferred submittal review. An issuance fee is added to each building permit, along with a state building fee under RCW 19.27.085. Table I effective January 1, 2026 (revised December 15, 2025); Table V plan review and other fees effective July 31, 2026. NOTE ADDED 2026-09-07: Table I of the 2026 fee schedule is internally inconsistent about the issuance fee - the fee line reads "Issuance Fee $32.00" while footnote 17.08.130.G.8.e on the same page reads "There shall be a $31.00 issuance fee added for each permit identified in Tables I, VI and VII". Table V footnote 5 also states $32.00. The $32.00 figure is carried above as the majority statement; the discrepancy is recorded, not resolved. | INTERNAL INCONSISTENCY IN THE CITED DOCUMENT, NOTED NOT RESOLVED, FIGURES UNCHANGED, 2026-09-12 (lane B run 814): within Building-Permit-Fees-2026.pdf the Table I fee line reads "Issuance Fee $32.00", but the explanatory note 17.08.130.G.8.e printed on the same PDF reads "There shall be a $31.00 issuance fee added for each permit identified in Tables I, VI...". The separate Building-Plan-Review-and-Other-Fees-2026.pdf note 5 also says $32.00. Our stored $32.00 follows the fee table itself and the two-of-three agreement; the $31.00 appears to be a note the City did not refresh. Not treated as a supersession.

Source: published fee schedule · Verified 9/15/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Planning Review, Land Use Permit (DMO, OTC, RES) - Residential Appurtenances (i.e. shed, deck, fence, driveways)
Flat fee $134.00
$134.00
○Building permit fee, valuation $501 to $2,000 (Table I)
$30.93 for the first $500.00, plus 2,495 x $4.01 for $249,500.00 over (rounded up per "or fraction thereof") = $10,035.88
$10,035.88
○Building permit fee, valuation $2,001 to $25,000 (Table I)
$91.17 for the first $2,000.00, plus 248 x $18.43 for $248,000.00 over (rounded up per "or fraction thereof") = $4,661.81
$4,661.81
Single Permit Fee, where more than one trade is involved · add-on
160% of Building Only Permit Fee — select the permit fee line above to calculate
see rule
Building Plan Review · add-on
65% of Building Permit Fee — select the permit fee line above to calculate
see rule
Single Permit Plan Review · add-on
50% of Single Permit Fee — select the permit fee line above to calculate
see rule
○Issuance Fee
Flat fee $32.00
$32.00
○State Building Fee per RCW 19.27.085, each residential building permit
Flat fee $6.50
$6.50
Re-inspection fee
$152.00 per hour, minimum $76.00 per inspection
see rule
How this jurisdiction calculates the fee

A deck 18 inches or less above grade, outside an environmentally sensitive area, needs no permit. Where a permit is required, a deck is a residential appurtenance: it draws a flat planning review fee that the schedule applies to sheds, decks, fences and driveways, plus the valuation-based building permit fee from Table I of the City of Vancouver fee schedule (VMC 17.08.130), plan review at 65% of the Building Only permit fee or 50% of the Single Permit fee, a per-permit issuance fee, and the RCW 19.27.085 state building fee. Table V plan review and other fees effective July 31, 2026; Table I building permit fees effective January 1, 2026. NOTE ADDED 2026-09-07: Table I of the 2026 fee schedule is internally inconsistent about the issuance fee - the fee line reads "Issuance Fee $32.00" while footnote 17.08.130.G.8.e on the same page reads "There shall be a $31.00 issuance fee added for each permit identified in Tables I, VI and VII". Table V footnote 5 also states $32.00. The $32.00 figure is carried above as the majority statement; the discrepancy is recorded, not resolved. | INTERNAL INCONSISTENCY IN THE CITED DOCUMENT, NOTED NOT RESOLVED, FIGURES UNCHANGED, 2026-09-12 (lane B run 814): within Building-Permit-Fees-2026.pdf the Table I fee line reads "Issuance Fee $32.00", but the explanatory note 17.08.130.G.8.e printed on the same PDF reads "There shall be a $31.00 issuance fee added for each permit identified in Tables I, VI...". The separate Building-Plan-Review-and-Other-Fees-2026.pdf note 5 also says $32.00. Our stored $32.00 follows the fee table itself and the two-of-three agreement; the $31.00 appears to be a note the City did not refresh. Not treated as a supersession.

Source: published fee schedule · Verified 10/2/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Residential electrical service 0-200 amps with feeder (replacement or altered service)
Flat fee $88.20
$88.20
○Residential electrical service 201-600 amps with feeder
Flat fee $129.02
$129.02
○Residential electrical service 601 amps and greater
Flat fee $194.23
$194.23
○Additional feeders
Flat fee $63.18
$63.18
○Branch circuits, 1-4 circuits (calculated per panel board)
Flat fee $63.18
$63.18
○Each additional branch circuit
Flat fee $7.25
$7.25
○Maintenance or repair of mast or meter (limited to wind, weather, vehicular or terminal failure damage to existing systems)
Flat fee $48.05
$48.05
○Permit of record
Flat fee $32.00
$32.00
○Minimum fee
Flat fee $78.99
$78.99
How this jurisdiction calculates the fee

Electrical permit fees are charged for each item installed or altered, with residential replacement or altered services priced by amperage; except trip fees, which are calculated from the fee schedule, the permit fee is the calculated table amount or the minimum fee, whichever is greater. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). The Electrical, Mechanical and Plumbing schedule (7 pages) was read in full; every page is footed "Effective 1/1/2026; revised 12/15/2025, prepared 11/15/2025" and all sixteen stored figures across the two rows re-read verbatim. SCHEDULED SUPERSESSION CANDIDATE: this schedule is dated by calendar year, so a 2027 edition is expected around 2027-01-01.

Source: published fee schedule · Verified 11/11/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Planning Review, Land Use Permit (DMO, OTC, RES) - Residential Appurtenances (i.e. shed, deck, fence, driveways)
Flat fee $134.00
$134.00
○Building permit fee, valuation $1 to $500 (Table I)
Flat fee $30.93
$30.93
○Building permit fee, valuation $501 to $2,000 (Table I)
$30.93 for the first $500.00, plus 2,495 x $4.01 for $249,500.00 over (rounded up per "or fraction thereof") = $10,035.88
$10,035.88
○Building permit fee, valuation $2,001 to $25,000 (Table I)
$91.17 for the first $2,000.00, plus 248 x $18.43 for $248,000.00 over (rounded up per "or fraction thereof") = $4,661.81
$4,661.81
Building Plan Review · add-on
65% of Building Permit Fee — select the permit fee line above to calculate
see rule
○Issuance Fee
Flat fee $32.00
$32.00
○State Building Fee per RCW 19.27.085, each residential building permit
Flat fee $6.50
$6.50
Re-inspection fee
$152.00 per hour, minimum $76.00 per inspection
see rule
How this jurisdiction calculates the fee

A fence 6 feet or less in height, outside an environmentally sensitive area, needs no permit; regardless of height a fence may not block access to the city water meter. Where a permit is required, a fence is a residential appurtenance: it draws a flat planning review fee that the schedule applies to sheds, decks, fences and driveways, plus the valuation-based building permit fee from Table I of the City of Vancouver fee schedule (VMC 17.08.130), plan review at 65% of the Building Only permit fee or 50% of the Single Permit fee, a per-permit issuance fee, and the RCW 19.27.085 state building fee. Table V plan review and other fees effective July 31, 2026; Table I building permit fees effective January 1, 2026. NOTE ADDED 2026-09-07: Table I of the 2026 fee schedule is internally inconsistent about the issuance fee - the fee line reads "Issuance Fee $32.00" while footnote 17.08.130.G.8.e on the same page reads "There shall be a $31.00 issuance fee added for each permit identified in Tables I, VI and VII". Table V footnote 5 also states $32.00. The $32.00 figure is carried above as the majority statement; the discrepancy is recorded, not resolved. | INTERNAL INCONSISTENCY IN THE CITED DOCUMENT, NOTED NOT RESOLVED, FIGURES UNCHANGED, 2026-09-12 (lane B run 814): within Building-Permit-Fees-2026.pdf the Table I fee line reads "Issuance Fee $32.00", but the explanatory note 17.08.130.G.8.e printed on the same PDF reads "There shall be a $31.00 issuance fee added for each permit identified in Tables I, VI...". The separate Building-Plan-Review-and-Other-Fees-2026.pdf note 5 also says $32.00. Our stored $32.00 follows the fee table itself and the two-of-three agreement; the $31.00 appears to be a note the City did not refresh. Not treated as a supersession.

Source: published fee schedule · Verified 10/2/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, valuation $2,001 to $25,000
$91.17 for the first $2,000.00, plus 248 x $18.43 for $248,000.00 over (rounded up per "or fraction thereof") = $4,661.81
$4,661.81
○Building permit fee, valuation $501 to $2,000
$30.93 for the first $500.00, plus 2,495 x $4.01 for $249,500.00 over (rounded up per "or fraction thereof") = $10,035.88
$10,035.88
○Building permit fee, valuation $25,001 to $50,000
$515.55 for the first $25,000.00, plus 225 x $13.28 for $225,000.00 over (rounded up per "or fraction thereof") = $3,503.55
$3,503.55
Building Plan Review · add-on
65% of Building Permit Fee — select the permit fee line above to calculate
see rule
Single Permit Plan Review, where more than one trade is involved · add-on
50% of Single Permit Fee — select the permit fee line above to calculate
see rule
○Issuance Fee
Flat fee $32.00
$32.00
○State Building Fee per RCW 19.27.085, each residential building permit
Flat fee $6.50
$6.50
○Grading and erosion control, 10 to 50 c.y. - permit fee (no plan review fee)
Flat fee $30.93
$30.93
○Grading and erosion control, 51 to 100 c.y. or greater than 1 foot in depth - plan review $30.93 plus permit fee
Flat fee $48.71
$48.71
○Grading and erosion control, 101 to 1,000 c.y. - base for first 100 c.y., plan review $48.71 plus permit fee $48.71, plus per additional 100 c.y.
Flat fee $23.04
$23.04
○Planning grading fee, 51 to 100 c.y. or greater than 1 foot in depth
Flat fee $166.00
$166.00
Re-inspection fee
$152.00 per hour, minimum $76.00 per inspection
see rule
How this jurisdiction calculates the fee

Retaining walls are permitted as structural work and charged from the valuation-based building permit table (Table I of the City of Vancouver fee schedule, VMC 17.08.130), with plan review added at 65% of the Building Only permit fee or 50% of the Single Permit fee, plus a per-permit issuance fee and the RCW 19.27.085 state building fee. Where the wall involves earthwork, the separate grading and erosion control permit and plan review fees in Table VI are charged as well, priced by cubic yards moved, along with a planning grading fee. Table I effective January 1, 2026; Tables V and VI effective July 31, 2026. NOTE ADDED 2026-09-07: Table I of the 2026 fee schedule is internally inconsistent about the issuance fee - the fee line reads "Issuance Fee $32.00" while footnote 17.08.130.G.8.e on the same page reads "There shall be a $31.00 issuance fee added for each permit identified in Tables I, VI and VII". Table V footnote 5 also states $32.00. The $32.00 figure is carried above as the majority statement; the discrepancy is recorded, not resolved. | INTERNAL INCONSISTENCY IN THE CITED DOCUMENT, NOTED NOT RESOLVED, FIGURES UNCHANGED, 2026-09-12 (lane B run 814): within Building-Permit-Fees-2026.pdf the Table I fee line reads "Issuance Fee $32.00", but the explanatory note 17.08.130.G.8.e printed on the same PDF reads "There shall be a $31.00 issuance fee added for each permit identified in Tables I, VI...". The separate Building-Plan-Review-and-Other-Fees-2026.pdf note 5 also says $32.00. Our stored $32.00 follows the fee table itself and the two-of-three agreement; the $31.00 appears to be a note the City did not refresh. Not treated as a supersession.

Source: published fee schedule · Verified 9/15/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Planning Review, Land Use Permit (DMO, OTC, RES) - Residential Appurtenances (i.e. shed, deck, fence, driveways)
Flat fee $134.00
$134.00
○Building permit fee, valuation $501 to $2,000 (Table I)
$30.93 for the first $500.00, plus 2,495 x $4.01 for $249,500.00 over (rounded up per "or fraction thereof") = $10,035.88
$10,035.88
○Building permit fee, valuation $2,001 to $25,000 (Table I)
$91.17 for the first $2,000.00, plus 248 x $18.43 for $248,000.00 over (rounded up per "or fraction thereof") = $4,661.81
$4,661.81
○Building permit fee, valuation $25,001 to $50,000 (Table I)
$515.55 for the first $25,000.00, plus 225 x $13.28 for $225,000.00 over (rounded up per "or fraction thereof") = $3,503.55
$3,503.55
Single Permit Fee, where more than one trade is involved · add-on
160% of Building Only Permit Fee — select the permit fee line above to calculate
see rule
Building Plan Review · add-on
65% of Building Permit Fee — select the permit fee line above to calculate
see rule
Single Permit Plan Review · add-on
50% of Single Permit Fee — select the permit fee line above to calculate
see rule
○Issuance Fee
Flat fee $32.00
$32.00
○State Building Fee per RCW 19.27.085, each residential building permit
Flat fee $6.50
$6.50
Re-inspection fee
$152.00 per hour, minimum $76.00 per inspection
see rule
How this jurisdiction calculates the fee

A shed of 120 square feet or less, outside an environmentally sensitive area, needs no permit. Where a permit is required, a shed is a residential appurtenance: it draws a flat planning review fee that the schedule applies to sheds, decks, fences and driveways, plus the valuation-based building permit fee from Table I of the City of Vancouver fee schedule (VMC 17.08.130), where the valuation for an addition is the value the city calculates from gross square footage, type of construction and use. Plan review is added at 65% of the Building Only permit fee or 50% of the Single Permit fee, along with a per-permit issuance fee and the RCW 19.27.085 state building fee. Table V plan review and other fees effective July 31, 2026; Table I building permit fees effective January 1, 2026. NOTE ADDED 2026-09-07: Table I of the 2026 fee schedule is internally inconsistent about the issuance fee - the fee line reads "Issuance Fee $32.00" while footnote 17.08.130.G.8.e on the same page reads "There shall be a $31.00 issuance fee added for each permit identified in Tables I, VI and VII". Table V footnote 5 also states $32.00. The $32.00 figure is carried above as the majority statement; the discrepancy is recorded, not resolved. | INTERNAL INCONSISTENCY IN THE CITED DOCUMENT, NOTED NOT RESOLVED, FIGURES UNCHANGED, 2026-09-12 (lane B run 814): within Building-Permit-Fees-2026.pdf the Table I fee line reads "Issuance Fee $32.00", but the explanatory note 17.08.130.G.8.e printed on the same PDF reads "There shall be a $31.00 issuance fee added for each permit identified in Tables I, VI...". The separate Building-Plan-Review-and-Other-Fees-2026.pdf note 5 also says $32.00. Our stored $32.00 follows the fee table itself and the two-of-three agreement; the $31.00 appears to be a note the City did not refresh. Not treated as a supersession.

Source: published fee schedule · Verified 10/2/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Water heater (mechanical permit item, Table III)
Flat fee $14.46
$14.46
○Flue vent for water heater or gas fireplace
Flat fee $14.46
$14.46
○Fuel piping, 1-4 outlets
Flat fee $5.91
$5.91
○Water heater (plumbing permit item, Table IV)
Flat fee $15.14
$15.14
○Minimum fee, gas water heater (replacement in like kind requiring no new power/fuel source or venting system)
Flat fee $67.80
$67.80
○Minimum fee, electric water heater
Flat fee $67.80
$67.80
○Minimum fee, all other mechanical, plumbing and electrical permits
Flat fee $78.99
$78.99
How this jurisdiction calculates the fee

Trade permit fees are charged for each item installed or altered, and the permit fee is the calculated table amount or the applicable minimum fee, whichever is greater. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). The Electrical, Mechanical and Plumbing schedule (7 pages) was read in full; every page is footed "Effective 1/1/2026; revised 12/15/2025, prepared 11/15/2025" and all sixteen stored figures across the two rows re-read verbatim. SCHEDULED SUPERSESSION CANDIDATE: this schedule is dated by calendar year, so a 2027 edition is expected around 2027-01-01.

Source: published fee schedule · Verified 11/12/2026

See the full write-up: Vancouver building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.