B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Estimate & calculate
CalculatorsChecklists
PricingLog in
30 CFR Part 56Public Domain

§ 56.12028 — Testing grounding systems

Subpart K — Electricity

Continuity and resistance of grounding systems shall be tested immediately after installation, repair, and modification; and annually thereafter. A record of the resistance measured during the most recent tests shall be made available on a request by the Secretary or his duly authorized representative.

Public Domain: 30 CFR Part 56 (MSHA Safety and Health Standards — Surface Metal and Nonmetal Mines) is a U.S. government publication and is not subject to copyright. Text extracted from the official source ↗. Figures are served from the eCFR; if one does not load, use the link in its place.
MSHA Part 56 56.12028 — Testing grounding systems | BuildSpec