30 CFR Part 56Public Domain
§ 56.6401 — Shunting
Subpart E — Explosives
Except during testing—
(a)Electric detonators shall be kept shunted until connected to the blasting line or wired into a blasting round;
(b)Wired rounds shall be kept shunted until connected to the blasting line; and
(c)Blasting lines shall be kept shunted until immediately before blasting.
Public Domain: 30 CFR Part 56 (MSHA Safety and Health Standards — Surface Metal and Nonmetal Mines) is a U.S. government publication and is not subject to copyright. Text extracted from the official source ↗. Figures are served from the eCFR; if one does not load, use the link in its place.