30 CFR Part 57Public Domain
§ 57.12088 — Splicing trailing cables
Subpart K — Electricity
No splice, except a vulcanized splice or its equivalent, shall be made in a trailing cable within 25 feet of the machine unless the machine is equipped with a cable reel or other power feed cable payout-retrieval system. However, a temporary splice may be made to move the equipment for repair.
Public Domain: 30 CFR Part 57 (MSHA Safety and Health Standards — Underground Metal and Nonmetal Mines) is a U.S. government publication and is not subject to copyright. Text extracted from the official source ↗. Figures are served from the eCFR; if one does not load, use the link in its place.