PROWAG (36 CFR 1190)

R212 — Passenger Loading Zones

PROWAG · Chapter 2: Scoping Requirements. Full current text with cross-references on BuildSpec.

R212 Passenger Loading Zones R212.1 General. Where permanently designated passenger loading zones other than transit stops are provided, at least one accessible passenger loading zone complying with R311 shall be provided in every continuous 100 feet (30 m) of loading zone space, or fraction thereof.

The rest of R212 — Passenger Loading Zones is for members

You're reading the opening of R212 — Passenger Loading Zones. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every PROWAG section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock R212 — Passenger Loading Zones — free for 14 daysSign in
PROWAG R212 — Passenger Loading Zones | BuildSpec