116 ALASKA 2020 SECTION 307 EMULSIFIED ASPHALT T REATED BASE COURSE
307-1.01 DESCRIPTION . Construct an emulsified asphalt treated base (EATB) course on a
prepared foundation to the lines, grades, and depths shown on the Plans.
307-2.01 MATERIALS. Use materials that conform to the following:
Aggregate Subsection 703- 2.03 Asphalt Section 702, for the type and grade shown on the bid schedule Use PG 52 -28 if no Grade is specified Anti-Strip As required by the approved Job Mix Design Portland Cement Section 701 (Type I)
307-2.02 COMPOSITION OF MIXES. At least 15 days in advance of the production of EATB
material, furnish a representative 300- pound sample of the base aggregate proposed for the project, and a representative 3- gallon sample of the asphalt binder, and a one- pint sample of antistrip additive if used in the mix. The Engineer will determine the job mix design. Changes in aggregate gradation or aggregate sources will require a new job mix design. Submit samples in the same manner as the original submittal. Use anti -strip agents in the proportions determined by ATM 414 and included in the approved Job Mix Design. At least 70 percent of the aggregate must remain coated when tested by ATM 414. CONSTRUCTION REQUIREMENTS
307-3.01 Mixing.
307-3.02 WEATHER LIM ITATIONS. Do not mix or place EATB material until the aggregate
temperature is above 40 °F and the air temperature as measured in the shade and a way from any heat source is 45 °F and rising. Do not place the EATB material on a wet or frozen surface, or when weather conditions will prevent proper handling, compacting, finishing, or curing of the mixture.
307-3.03 OPERATIONAL LIMITATIONS. Coordinate the various portions of the work to conform
to the traffic maintenance requirements of Section 643. Place EATB materials only on an accepted subgrade. Ensure that the subgrade surface is substantially true to line and grade, firm and reasonably smooth, an d free of loose or objectionable material, before placement of EATB materials.
307-3.04 Equipment.
307-3.05 SPREADING A ND FINISHING. Spread EATB material in single lifts not to exceed 6
inches. If the single lift cannot be compacted sufficiently to conform to Subsec tion 307- 3.06, spread and compact in multiple lifts of equal thickness.
307-3.06 COMPACTION. The Engineer will use ATM 412 to determine the density standard.
Make each control strip at least 12 feet by 300 feet. Compact the remainder of the project to not less than 98 percent of the density standard, in accordance with ATM 411. The Engineer will designate the location of test strips. Compact the EATB using at least one pneumatic roller and one vibratory roller. Use vibratory compactors, applying a minimum dynamic force of 50,000 pounds per vibration at a minimum frequency of 1,000 vibrations per minute. Adjust working speed in order to apply 8 to 12 impacts per foot. In areas inaccessible to rollers, use mechanical tampers until thoroughly compacted.
307-3.07 SURFACE TEST. After rolling has been completed, the surface will be tested for
smoothness and accuracy of grade, crown, superelevation, and width. Limit surface deviations to 3/8 inch, as measured from the testing edge of a 10- foot straightedge between two contacts with the surface parallel with, and at right angles to, the centerline.
307-3.08 THICKNESS R EQUIREMENTS. Limit deviations in thickness to 1/2 inch.
307-4.01 Method of M Easurement.
308-1.01 DESCRIPTION . Construct a base course, using pulverized asphalt pavement, to the
grades shown on the Plans. Add emulsified asphalt to the base course mixture, when shown on the plans.
308-2.01 MATERIALS. Use materi als that conform to the following:
Asphalt Concrete Existing asphalt pavement material Aggregate Base Course Subsection 703- 2.03 Emulsified Asphalt Section 702 (CSS -1) CONSTRUCTION REQUIREMENTS
308-3.01 PULVERIZING AND MIXING. Crush or process the existing asphalt pavement so that
100 percent by weight passes the 2- inch sieve and 95- 100 percent by weight passes the 1- 1/2- inch sieve. Use self -propelled pulverizing and mixing equipment capable of processing to full depth in a single pass. If emulsified asphalt is called for on the Plans, the mixing equipment must also be capable of adding the emulsion, through a metered system during mixing. Add crushed aggregate base course to the base course mixture as needed to conform to the design grade.
308-3.02 WEATHE R LIMITATIONS. Do not use any frozen material or compact on a frozen
base.
308-3.03 SHAPING AND GRADING. Use a finish grader that is equipped with an automatic
grade and cross slope control system. Maintain longitudinal grade control, based on either stri ng line or the existing roadway surface, as determined by the Engineer.
308-3.04 COMPACTION AND COMPACTION EQUIP MENT. The Engineer will use ATM 412 to
determine the density standard. Make each control strip at least 12 feet by 300 feet. Compact the remainder of the project to not less than 98 percent of the density standard, in accordance with ATM 411. The Engineer will designate the location of test strips. Compact the base course using vibratory compactors, applying a minimum dynamic force of 50,000 pounds per vibration at a minimum frequency of 1,000 vibrations per minute. Adjust working speed in order to apply 8 to 12 impacts per foot. In areas inaccessible to rollers, use mechanical tampers until thoroughly compacted.
308-3.05 SURFACE TEST. The finished surface will be tested for smoothness and accuracy of
grade, crown, superelevation, and width. Limit surface deviations to 3/8 inch, as measured from the testing edge of a 10- foot straightedge between two contacts with the surface parallel with, and at r ight angles to, the centerline.