General Provisions (00100-00999)

643TRAFFIC MAINTENANCE

AK · 2020 Standard SpecificationsBook pages 429448View official source ↗

401 ALASKA 2020 SECTION 643

643-1.01 DESCRIPTION . Protect and control traffic during the contract. Furnish, erect, maintain,

replace, clean, move and remove the traffic control devices required to ensure the traveling public’s safety. Perform all administrative responsibilities necessary to implement this work. Maintain all roadways and pedestrian and bicycle f acilities affected by the work in a smooth and traversable condition. Construct and maintain approaches, crossings, intersections, and other necessary features throughout the project for the life of the contract. Illuminate construction activities listed i n Table 643- 4 during hours of night work on roads open to the public within project limits.

643-1.02 DEFINITIONS . These definitions apply only to Section 643.

ATM . When used in this Section, ATM stands for the Alaska Traffic Manual , which is comprised of the Manual on Uniform Traffic Control Devices (MUTCD), the Alaska Traffic Manual Supplement, any adopted revisions or interim addenda to either document issued subsequently, and corrections to known errors to either document. BALLOON LIGHT. Light surround ing by a balloon- like enclosure kept inflated by pressurized air or helium, and producing uniform light through 360 horizontal degrees. CONSTRUCTION PHASING PLAN . A plan for each phase of the project showing how to accommodate traffic. Show the sequence of work by segment or phase, if required. FIXED OBJECTS. Private vehicles, parked flagger vehicles, idle construction equipment, construction material stockpiles, culvert ends, individual trees, power poles, utility poles and appurtenances, and other items deemed by the Engineer to present a hazard to motorists, pedestrians, or bicyclists traveling through the work zone. NIGHT WORK. Work occurring between sunset and sunrise on all days except the “No Lighting Required” period shown in the Table 643- 1 below: TABLE 643 -1 PROJECT LOCATIONS – NIGHT TIME ILLUMINAT ION EXCLUSION Latitude (degrees) No Lighting Required Nearby Cities Start End South of 61 Lighting Required All Year Everything South of Hope 61 June 11 July 1 Anchorage, Valdez, Girdwood 62 June 2 July 13 Wasilla, Palmer, Glennallen, Talkeetna 63 May 27 July 17 Cantwell, Paxson, McGrath 64 May 22 July 21 Tok, Delta, Nome 65 May 18 July 25 Fairbanks 66 May 14 July 29 Circle City 67 May 10 August 2 Coldfoot, Kotzebue 68 May 7 August 6 Galbraith Lake 69 May 3 August 9 Happy Valley 70 April 30 August 12 Deadhorse 71 April 27 August 15 Barrow 72 April 24 August 19 402 ALASKA 2020 TRAFFIC . The movement of vehicles, pedestrians, and bicyclists through road construction, maintenance operations, utility work, or similar operations. TRAFFIC CONTROL PLAN (TCP) . A drawing or drawings indicating the method or scheme for safely guiding and protecting motorists, pedestrians, bicyclists, and workers in a traffic control zone. The TCP depicts the traffic control devices and their placement and times of use. TRAFFIC CONTROL ZONE . A portion of a road construction project, maintenance operation, utility work or similar operation that affects traffic and requires traffic control to safely guide and protect motorists, pedest rians, bicyclists, or workers.

643-1.03 TRAFFIC CON TROL PLAN . Implement an approved TCP before beginning work within

the project limits. The TCP includes, but is not limited to, signs, barricades, traffic cones, plastic safety fence, sequential arrow pane ls, portable changeable message board signs, special signs, warning lights, portable concrete barriers, crash cushions, flaggers, pilot cars, interim pavement markings, temporary lighting, temporary roadways and all other items required to direct traffic t hrough or around the traffic control zone according to these Specifications and the ATM. Address in the TCPs placement of traffic control devices, including location, spacing, size, mounting height and type. Include code designation, size, and legend per t he ATM and the Alaska Sign Design Specification (ASDS). Include longitudinal buffer space for the posted speed limit, according to Table 6C -2 of the ATM unless project conditions or geometric features prohibit including all or a portion of the buffer lengt h. When a TCP is included in the Plans, use it, modify it, or design an alternative TCP. When a TCP is omitted from the Plans, provide one according to this Section and the ATM. Submit new or modified TCPs to the Engineer for approval. All TCPs must incl ude the following information:

1.Project name and number.
2.A designated TCP number and name on each page.
3.For TCPs more than one page, each page must be numbered.
4.The posted speed limit for each roadway.
5.Existing striping width, lane width, and road surfacing.
6.Construction lane widths, striping layout, and temporary pavement marker layout.
7.Provisions for Pedestrian, Bicycle, and ADA travel through the work zone.
8.Dates and times the TCP will be in effect and why it is being used.
9.The Worksite Traffic Supervisor ’s signature certifying that all TCPs conform with the ATM and the Contract.
10.The Project Superintendent’s signature confirming the TCP is compatible with the work plan.
11.The name(s) of the Worksite Traffic Supervisor, his/her alternate and their 24 hour tel ephone number(s).
12.Signs to be used and the ASDS designation number and size.
13.Location and spacing of all devices and signs.
14.A plan to address any possible slopes, drop offs, paving joints, or similar temporary features that may occur during use of the TCP.
15.For TCPs proposed to be used at night, note how the requirements will be met for the required lighting and retroreflective material. TCPs submitted for approval without all the required information will be rejected. Allow 7 days for review of each TCP submittal. All required modifications to a TCP require a new submission and an additional 7 days for review. 403 ALASKA 2020 A minor revision to a previously approved TCP during construction requires 48 hours for review and approval by the Engineer. The TCPs, Plans, and Alas ka Standard Plans show the minimum required number of traffic control devices. If unsafe conditions occur, the Engineer may require additional traffic control devices. Use of oversize and overweight equipment within the project must conform to an approved TCP, including all traffic control devices these operations require.

643-1.04 WORKSITE TR AFFIC SUPERVISOR. Provide a Worksite Traffic Supervisor

responsible for maintaining 24- hour traffic operations.

1.Qualifications. The Worksite Traffic Supervisor shall be knowledgeable and experienced regarding the requirements of the ATM and the implementation of those requirements. The Worksite Traffic Supervisor shall be familiar with the Plans, the Specifications, proposed operations, and certified as one of the fol lowing:
a.Traffic Control Supervisor, American Traffic Safety Services Association (ATSSA)
b.Work Zone Temporary Traffic Control Technician, or Work Zone Safety Specialist, International Municipal Signal Association (IMSA) Certify according to Form 25D -124 that the Worksite Traffic Supervisor has a minimum 4000 hours of temporary traffic control work experience, is competent and capable, and has the authority to perform the duties and responsibilities in accordance with this section.
c.Temporary traffic control work experience shall demonstrate an understanding of concepts, techniques, and practices in the installation and maintenance of traffic control devices, and skill in reading, interpreting, implementing, and modifying TCPs.
d.Temporary traffic control work experience includes: flagging; installing traffic control devices in accordance with TCPs; monitoring traffic control devices and TCP performance; and recognizing and reporting deficiencies in traffic control devices and TCPs for correction.
e.Temporary traffic control work experience is gained while serving as a Worksite Traffic Supervisor -in-training, temporary traffic control support personnel, and Flagger.
f.Four thousand hours of experience serving solely as a Flagger does not satisfy these requirements. Worksite Traffic Supervisors shall maintain current certification and be able to show their certification anytime they are on the project.
2.Duties.
a.Prepare the TCPs and public notices and coordinate traffic control operations between the Project Superintendent and the Engineer.
b.Physically inspect the condition and position of all traffic control devices used on the project at least twice each day and at approximately 12 hour intervals. Ensure that traffic control devices work properly, are clean and visibl e, and conform to the approved TCP. Complete and sign a detailed written report of each inspection within 24 hours. Use Traffic Control Daily Review Form 25D -104.
c.Supervise the repair or replacement of damaged or missing traffic control devices.
d.Review a nd anticipate traffic control needs. Make available proper traffic control devices necessary for safe and efficient traffic movement. 404 ALASKA 2020 e. Review work areas, equipment storage, and traffic -safety material handling and storage.
f.Hold traffic safety meetings with superintendents, foremen, subcontractors, and others as appropriate before beginning construction, prior to implementing a new TCP, and as directed. Invite the Engineer to these meetings.
g.Supervise all traffic control workers, flaggers, and pilot car drivers.
h.Certify that all flaggers are certified as required by Subsection 643- 3.04.4. Submit a copy of all flagger certifications to the Engineer.
i.Supervise lighting for night work.
3.Authority. The Worksite Traffic Supervisor shall have the Contractor’s author ity to stop work and implement immediate corrective action to unsafe traffic control, in locations where unsafe traffic control is present.

643-1.05 CONSTRUCTIO N PHASING PLAN. Submit a Construction Phasing Plan for approval

no less than 5 working days prior to the preconstruction conference. Include the following:

1.Form 25D -124 designating the Worksite Traffic Supervisor, providing the 24- hour telephone number, and certifying minimum 4,000 hours of work experience as described in 643- 1.04 Worksite Traffic Su pervisor.
2.A construction phasing plan for each phase or segment of the project.
3.TCPs for the first phase of the project. Show permanent and temporary traffic control measures, including the times each TCP will be used. Submit any changes to the Engineer f or approval 7 days before proposed implementation.

643-1.06 TRAFFIC MAI NTENANCE SETUP. When shown on the bid schedule, Traffic

Maintenance Setup items are site specific and are detailed as individual TCPs on the plan sheets. They depict the method or schem e required to route traffic safely and efficiently when any of the following restrictions occur:

1.Lane Closure. The closure of one or more lanes on a roadway.
2.Detour. The redirection of traffic through or around a traffic control zone.
3.Road Closure. The closure of a roadway with or without a specified detour route.
4.One Lane Road. A two- way roadway reduced to a single- lane roadway with flaggers, pilot cars, traffic signals, stop signs, or yield signs.

643-2.01 MATERIALS. Provide traffic control devices meeting the following requirements:

1.Signs. Use signs, including sign supports, that conform to Section 615, the ATM, and ASDS.
a.Construction Signs: Regulatory, guide, or construction warning signs designated in the ASDS.
b.Permanent Construction Signs: As designat ed on the Plans or an approved TCP.
c.Special Construction Signs: All other signs are Special Construction Signs. Neatly mark the size of each sign on its back in 3- inch black numerals. 405 ALASKA 2020 2. Portable Sign Supports. Use wind -resistant sign supports with no external ballasting. Use sign supports that can vertically support a 48 X 48 inch traffic control sign at the height above the adjacent roadway surface required by the ATM.
3.Barricades and Vertical Panels . Use barricades and vertical panel supports that conform t o the ATM. Use Type III Barricades at least 8 feet long. Use retroreflective sheeting that meets ASTM D4956 Type II or III.
4.Portable Concrete Barriers . Use portable concrete barriers that conform to the Contract. For each direction of traffic, equip each 12.5 -foot section of barrier with at least two side- mounted retroreflective tabs placed approximately 6 to 8 feet apart, or a continuous 4- inch wide horizontal retroreflective stripe mounted 6 inches below the top of the barrier. Use yellow tabs or stripe w hen barriers are placed at centerline. Use white tabs or stripe when barriers are placed on the roadway shoulder. Use retroreflective sheeting that meets ASTM D4956 Type III, IV or V.
5.Warning Lights . Use Type A (low intensity flashing), Type B (high intens ity flashing) or Type C (steady burn) warning lights that conform to the ATM.
6.Drums . Use plastic drums that conform to the requirements of the ATM. Use retroreflective sheeting that meets ASTM D4956 Type II or III.
7.Traffic Cones and Tubular Markers . Use re flectorized traffic cones and tubular markers that conform to the requirements of the ATM. Use traffic cones and tubular markers at least 28 inches high. Use retroreflective sheeting that meets ASTM D4956 Type II or III.
8.Interim Pavement Markings . Apply ma rkings according to Section 670 and the manufacturer's recommendations. Use either:
a.Paint meeting Subsection 708- 2.03 with glass beads meeting Subsection 712- 2.08,
b.Preformed Marking Tape (removable or non- removable) meeting Subsection 712- 2.14, or
c.Tempo rary Raised Pavement Markers meeting Subsection 712- 2.15 or 712- 2.16, as appropriate.
9.High-Level Warning Devices . Use high- level warning devices that conform to the ATM.
10.Temporary Crash Cushions . Use retroreflective sheeting that meets ASTM D4956 Type III , IV or V. Application of crash cushion must be appropriate for the intended use and be installed per manufacturer’s recommendation. Temporary crash cushions that are barrels or barricade filled with sand or water may only be used when the forecasted temperature during their use is above 32 degrees Fahrenheit.
11.Sequential Arrow Panels . Use Type A (24 X 48 inch), Type B (30 X 60 inch) or Type C (48 X 96 inch) panels that conform to the ATM.
12.Portable Changeable Message Board Signs . Use truck or trailer mounted portable changeable message board signs with a self -contained power supply for the sign and with the following features:
a.Message sign panel large enough to display 3 lines of 9 inch high characters
b.Eight character display per message line
c.Fully programmable message module
d.The capacity to create, preview, and display new messages and message sequences 406 ALASKA 2020 e. A waterproof, lockable cover for the controller keyboard
f.An operator’s manual, a service manual, and a wiring diagram
g.Quick release attachments on the display panel cover
h.Variable flash and sequence rates
i.Manual and automatic dimming capabilities on lamp bulb matrix models
j.Locate the bottom of the sign panel at least 7 feet above the pavement
k.Operate with a battery pack a minimum of 2 hours under full load
l.Powe r cords shall comply with the National Electrical Code (NEC) Article 600.10 Portable or Mobile Signs, paragraphs 600.10(C)(1) Cords and 600.10(C)(2) Ground- Fault Circuit Interrupter (GFCI). The cord will have integral GFCI protection located in either the attachment plug or 12- inches or less from the plug.
13.Plastic Safety Fence. Use 4 foot high construction orange fence manufactured by one of the following companies, or an approved equal:
a.“Safety Fence” by Jackson Safety, Inc., Manufacturing and Distribution Center, 5801 Safety Drive NE, Belmont, Michigan, 49306. Phone (800) 428- 8185.
b.“Flexible Safety Fencing” by Carsonite Composites, LLC, 19845 U.S. Highway 76, Newberry, South Carolina, 29108. Phone (800) 648- 7916.
c."Reflective Fencing" by Plastic Safety Sy stems, Inc., 2444 Baldwin Road, Cleveland, Ohio 44104. Phone (800) 662- 6338.
14.Temporary Sidewalk Surfacing. Provide temporary sidewalk surfacing as required by an approved TCP and the following:
a.Use plywood at least 1/2 inch thick for areas continuously su pported by subgrade. Use plywood at least 1 inch thick for areas that are not continuously supported.
b.Do not use unsupported 1- inch plywood longer than 30 inches.
c.Use plywood with regular surfaces. Do not overlap plywood joints higher than 1/2 inch. Bevel overlap joints so the maximum slope of the overlapping edge is 2 horizontal to 1 vertical.
d.Fasten so wind and traffic will not displace temporary surfacing.
15.Temporary Guardrail . Use temporary guardrail that meets Section 606, except that posts may requir e placement under special conditions, such as in frozen ground.
16.Flagger Paddles . Use flagger paddles with 24 inches wide by 24 inches high sign panels, 8 inch Series C lettering (see ASDS for definition of Series C), and otherwise conform to the ATM. Use retroreflective sheeting that meets ASTM D4956 Type VIII, IX, or XI. Use background colors of fluorescent orange on one side and red on the other side.
17.Truck Mounted Attenuator , TMA. The TMA shall be mounted on a vehicle with a minimum weight of 15,000 po unds and a maximum weight per the manufacturer’s recommendations.
18.Portable Steel Barriers. Use portable steel barriers that conform to the contract. For each direction of traffic, equip each section of barrier with side- mounted retroreflective tabs place d 407 ALASKA 2020 approximately 6 to 8 feet apart, or a continuous 4- inch wide horizontal retroreflective stripe mounted 6 inches below the top of the barrier. Use yellow tabs or stripe when barriers are placed at centerline. Use white tabs or stripe when barriers are pl aced on the roadway shoulder. Use retroreflective sheeting that meets ASTM D4956 Type III, IV or V.

643-2.02 CRASHWORTHI NESS. Temporary Work Zone devices, including portable barriers,

manufacturered after December 31, 2019, must have been successfully test ed to the 2016 edition of Manual for Assessing Safety Hardware (MASH). Such devices manufacturered on or before this date, and successfully tested to National Cooperative Highway Research Program (NCHRP) Report 350 or the 2009 edition of MASH, may continu e to be used throughout their normal service lives. Submit documentation, by the method indicated on Table 643- 2, that the following devices comply with Test Level 3 requirements of NCHRP Report 350 or MASH. Submit documentation of compliance to the Engineer before installing devices on the project. TABLE 643 -2 WORK ZONE TRAFFIC CO NTROL DEVICE AND BARRIER CRASH TESTIN G COMPLIANCE 1 The Engineer will determine whether a device is in serviceable condition. Serviceable means the device will function equivalent to a new device of the same manufacture. 2 When no test level is specif ied in an FHWA Eligibility letter; it is implied that the tests were run for Test Level 3. In Table 643- 2, Category 1 devices that exceed the following weights and heights require certification that they meet the evaluation criteria of NCHRP Report 350 or MASH, Test Level 3. Category Devices Devices Manufactured Before Dec. 31, 2019 1 Devices Manufactured After Dec. 31, 2019 1 Method of Documentati on 1 Low-mass single -piece devices w/o attachments: traffic cones, tubular markers, single piece drums, delineators NCHRP 350, MASH 2009, or MASH 2016 MASH 2016 Manufacturer's Certification for devices exceeding height and weight limits 2 Category 1 dev ices with attachments, barricades, portable sign supports, drums w/lights, other devices weighing less than 100 pounds but not included in category 1 NCHRP 350, MASH 2009, or MASH 2016 MASH 2016 FHWA eligibility letter, if available, at Test Level 3 2, or DOT&PF eligibility determination 3 Fixed sign supports, truck mounted attenuators, temporary crash cushions, bridge railing, bridge and guardrail transitions, and guardrail and barrier end treatments. NCHRP 350, MASH 2009, or MASH 2016 MASH 2016 FHWA el igibility letter, if available, at Test Level 3 2, or DOT&PF eligibility determination Portable concrete and steel barriers NCHRP 350, MASH 2009, or MASH 2016 MASH 2016 FHWA eligibility letter, if available, at Test Level 3, or DOT&PF eligibility determination, unless otherwise required in the contract. 408 ALASKA 2020 This certification may be a one- page affidavit signed by the vendor. Documentation supporting the certification (crash tests and/or engineering analysis) must be kept on file by the certifying organization. No certification is required for devices less than or equal to both the weight and height on the schedule below:

643-3.01 GENERAL CON STRUCTION REQUIREMENTS . Keep the work, and portions of the

project affected by the work, in good condition to accommodate traffic safely. Provide and maintain traffic control devices and services inside and outside the project limits, day and night, to guide traffic safely. Unless otherwise provided in this Section, keep all roadways, business accesses, and pedestrian facilities within the project l imits open to traffic. Obtain the Engineer’s approval before temporarily closing residential, commercial, or street approaches. Provide access through the project for emergency vehicles and school and transit buses. Properly sign and/or flag all locations where the traveling public is redirected or stopped. Organize construction operations so the total of all construction related stoppages experienced by a vehicle traveling through the project does not exceed 20 minutes except when indicated otherwise in the Contract. Stop equipment at all points of intersection with the traveling public unless an approved TCP shows otherwise. Continue to operate all illumination and signalization according to the requirements of Subsection 660-3.09. When moving approach lanes, realign signal heads as necessary according to the ATM. Coordinate any modifications to existing traffic signals with the agency that maintains and operates them. Operate flood lighting at night according to the ATM. Adjust flood lighting so that it does not shine into oncoming traffic. Provide and maintain safe routes for pedestrians and bicyclists through or around traffic control zones at all times, except when regulations prohibit pedestrians or bicyclists. Immediately notify the Engineer of any tr affic related accident that occurs within the project limits as soon as an employee, or a subcontractor becomes aware of the accident.

643-3.02 ROADWAY CHA RACTERISTICS DURING CONSTRUCTION. Obtain an approved

TCP before reducing existing roadway lane and sh oulder widths and before starting construction. Maintain a clear area with at least 2 feet between the edge of traveled way and the work area. Use barricades, traffic cones, or drums to delineate this area. Place traffic control devices on the work side of the clear area. Space them according to the ATM. If maintaining traffic on an unpaved surface, provide a smooth and even surface that public traffic can use at all times. Properly crown the roadbed surface for drainage. Before beginning other grading oper ations, place sufficient fill at culverts and bridges to permit traffic to cross smoothly and unimpeded. Use part -width construction techniques when routing traffic through roadway cuts or over embankments under construction. Excavate the material or place it in layers. Alternate construction activities from one side to the other. Route traffic over the side opposite the one under construction. Device Composition Weight Height Cones Rubber 20 lb. 36 in. Plastic 20 lb. 48 in. Candles Rubber 13 lb. 36 in. Plastic 13 lb. 36 in. Drums Hi Density Plastic 77 lb. 36 in. Lo Density Plastic 77 lb. 36 in. Delineators Plastic or Fiberglass N/A 48 in. 409 ALASKA 2020 Detour traffic when the Plans or an approved TCP allows. Maintain detour routes so that traffic can proceed safely . When detours are no longer required, obliterate the detour. Topsoil and seed appropriate areas. If two -way traffic cannot be maintained on the existing roadway or detour, you may use half -width construction or a road closure if it is shown on an approved TCP. Make sure the TCP indicates closure duration and conditions. Schedule roadway closures so you do not delay school buses or peak -hour traffic. For road closures, post closure- start and road- reopen times at the closure site, within view of waiting traf fic.

643-3.03 PUBLIC NOTI CE. Give notice at least 3 days before major changes, delays, lane

restrictions, or road closures to local officials and transportation organizations, including but not necessarily limited to:

1.Alaska Trucking Association
2.Alaska Sta te Troopers
3.Division of Measurement Standards
4.Local Police Department
5.Local Fire Department
6.Local Government Traffic Engineer
7.School and Transit Authorities
8.Local Emergency Medical Services
9.Local Media (newspapers, radio, television)
10.Railroads (where appli cable)
11.U.S. Postal Service
12.Major Tour Operators Provide local traffic enforcement and maintenance agencies 24 hour notice before shutting down a traffic signal system. Provide notice as required by utility companies before repairing or replacing a utility. Provide the Alaska State Troopers, local police and fire department with the radio frequencies used on the project and the 24- hour telephone numbers of the Worksite Traffic Supervisor and the Project Superintendent. These telephone numbers are used to alert construction employees when emergency vehicles must pass through the project. When notified of emergencies make every necessary effort to expedite rapid passage. Additional notices may be given through the Navigator or 511 System for selected projects. Check the special provisions for those requirements.

643-3.04 TRAFFIC CON TROL DEVICES. Before starting construction, erect permanent and

temporary traffic control devices required by the approved TCPs. The Engineer will determine advisory speeds when nec essary. For lane closures on multilane roadways, use sequential arrow panels. During hours of darkness when required by the approved TCP use flashing warning lights to mark obstructions or hazards and steady -burn lights for channelization. Use only one typ e of traffic control device in a continuous line of delineating devices, unless otherwise noted on an approved TCP. Use drums or Type II barricades for lane drop tapers. During non- working hours and after completing a particular construction operation, rem ove all unnecessary traffic control devices. Store all unused traffic control devices in a designated storage area which does not present a nuisance or visual distraction to traffic. If sign panels are post mounted and cannot be readily removed, cover them entirely with either metal or plywood sheeting. Completely cover signal heads with durable material that that fully blocks the view of signal head and will not be damaged or removed by weather. 410 ALASKA 2020 Keep signs, drums, barricades, and other devices clean at all times. Use only traffic control devices that meet the requirements of the “Acceptable” category in ATSSA (American Traffic Safety Services Association) “Quality Guidelines for Temporary Traffic Control Devices” and meet crashworthiness requirements per Section 643- 2.02. Immediately replace any devices provided under this Section that are lost, stolen, destroyed, inoperable or deemed unacceptable while used on the project. Stock repair parts for each Temporary Crash Cushion used on the project. Repair damaged crash cushions within 24 hours. Maintain pre- existing roadside safety hardware at an equivalent or better level than existed prior to project implementation until the progress of construction necessitates removing the hardware. All existing hazards that are currently protected with roadside safety hardware or new hazards which result from project improvements shall be protected or delineated as required in the plans, specifications, and approved TCPs until permanent roadside safety hardware is installed. All temporary roadside safety hardware shall meet crashworthiness requirements of 643- 2.02. All items paid under this Section remain the property of the Contractor, unless noted otherwise in the contract. Remove them after completing the project.

1.Embankm ents. Install portable concrete or steel barrier, plastic drums, barricades, tubular markers, plastic safety fence, and cones as specified on the Plans or TCPs to delineate open trenches, ditches, other excavations and hazardous areas when they exist along the roadway for more than one continuous work shift.
2.Adjacent Travel Lane Paving. When paving lifts are 2 inches or greater and you cannot finish paving adjacent travel lanes or paved shoulders to the same elevation before the end of the paving shift, ins tall: W8 -11 (Uneven Lanes), W8- 9 (Low Shoulder), W8- 17 (Shoulder Drop- Off), W14 -3 (No Passing Zone), R4- 1 (Do Not Pass), R4- 2 (Pass with Care), and W8- 1 (Bump) signs as appropriate. Place additional signs every 1500 feet if the section is longer than 1/2 m ile.
3.Fixed Objects And Construction Vehicles And Equipment Working On Or Next To The Traveled Way . Do not park equipment in medians. Locate fixed objects at least 30 feet from the edge of traveled way. Fixed objects that exist prior to construction activ ity are not subject to this requirement unless the proposed temporary traffic routing moves the edge of traveled way closer to the pre- existing fixed object. Vehicles and other objects within parking lots in urban environments are considered preexisting f ixed objects regardless of whether they are or are not present continuously throughout the day. When worksite restrictions, land features, right of way limitations, environmental restrictions, construction phasing, or other construction conditions allow no practicable location meeting the preceding requirements, the Engineer may approve alternate locations for fixed objects. Alternate locations shall be as far as practicable from the edge of traveled way. When the alternate location provides 15 feet or more separation from the edge of traveled way, the Engineer may verbally approve the alternate location. When the alternate location provides less than 15 feet separation, written approval is required. When the Engineer determines a fixed object or fixed objec ts present unacceptable hazard, use drums or Type II barricades with flashing warning lights, or use portable concrete or steel barriers, or temporary crash cushion to delineate or shield the hazard, as approved by the Engineer.
4.Flagging. Furnish trained and competent flaggers and all necessary equipment, including lighting of the flagging position during nighttime operations, to control traffic through the traffic control zone. The Engineer will approve each flagging operation before it begins and direct adjustments as conditions change. 411 ALASKA 2020 a. Flaggers must be certified as one of the following:
b.Flagging Level I Certification by IMSA
c.Flagger Certification by ATSSA
d.Traffic Control Supervisor, ATSSA
e.Work Zone Safety Specialist, IMSA
f.ATSSA Flagging Instructor Flagg ers shall maintain current flagger certification. Flaggers must be able to show their flagger certification anytime they are on the project. Flaggers must maintain their assigned flagging location at all times, unless another qualified flagger relieves t hem, or the approved traffic control plan terminates the flagging requirements. Remove, fully cover, or lay down flagger signs when no flagger is present. Keep the flaggers’ area free of encumbrances. Keep the flagger’s vehicle well off the roadway and aw ay from the flagging location so the flagger can be easily seen. Provide approved equipment for two- way radio communications between flaggers when flaggers are not in plain, unobstructed view of each other. Obtain the Engineer’s written approval before flagging signalized intersections. When flagging a signalized intersection, either turn off and cover the traffic signal or place it in the All-Red Flash mode. Coordinate changing traffic signal modes and turning off or turning on traffic signals with the agency responsible for signal maintenance and operation and the Engineer. Get their written approval in advance. Only uniformed police officers are permitted to direct traffic in an intersection with an operating traffic signal.
5.Pilot Cars . You may use pilot cars when part of an approved TCP, if the Engineer determines one-way traffic is necessary, or if the route through the traffic control zone is particularly hazardous, involved, or frequently altered to preclude adequate signing, Do not use pilot cars to avoid localized traffic control at several locations. Pilot car operators may not control Automated Flagger Assistance Devices while operating a pilot car. Organize construction operations so the total of all stoppages experienced by a vehicle traveling t hrough a project does not exceed 20 minutes. However, this does not imply that you may allow 20 minutes in all cases. Coordinate multiple pilot -car operations within a project or adjoining projects to minimize inconvenience to the traveling public. Two or more pilot cars may be used to provide two- way traffic through the traffic control zone to reduce the waiting period. The flagger or pilot car operator must record each pilot car’s departure time in a bound field book furnished by the Engineer. Whenever pr actical, the flagger should tell the motorist the reason for and approximate length of the delay. Make every reasonable effort to yield right -of-way to the public and prevent excessive delay. Use an automobile or pickup as the pilot car, with the company logo prominently displayed. Equip the pilot car with a two- way radio for contact with flaggers and other pilot cars. Mount a G20- 4 sign (Pilot Car Follow Me) on the rear at least 5 feet above the driving surface. Use high intensity flashing strobe lights, oscillating beacons, or rotating beacons on all Pilot Cars. Vehicle hazard warning lights may supplement but are not permitted to be used instead of high intensity flashing strobe lights, oscillating beacons, or rotating beacons. Identify the last vehicl e in the column. When pilot car operations are approved, establish all required pilot car traffic control devices before beginning work. Continue pilot car operations until no longer necessary and an 412 ALASKA 2020 approved TCP is in place for operations without pilot c ar, including all required traffic control devices.
6.Street Sweepin g. Use a street sweeper that collects material to keep the project and affected areas free of loose material. Include paved portions of the roadway within project limits, haul routes open t o the public, and sections of roadway outside of project limits where your operations have deposited loose material.
7.Watering. Furnish, haul, and place water for dust control and pavement flushing, as directed. Use water trucks that can provide a high- pressure water stream to flush the pavement and a light-water spray to control dust. If the flushing operations contaminate or fill adjacent catch basins, clean and restore them to their original condition. This requirement includes sections of roadway off the project where flushing is required. The Engineer will control water application. Obtain an Alaska Department of Natural Resources permit for water removal before taking water from a lake, stream, or other natural water body. Comply with the Alaska Departm ent of Fish and Game screening requirements for all water removal operations.
8.Portable Changeable Message Board Signs . Furnish Changeable Message Signs when approved on a TCP. Display only messages approved on the TCP. Follow application guidelines in the ATM.
9.Truck Mounted Attenuator (TMA.) TMAs are mounted on the rear of work vehicles. Impact attenuators shall meet crashworthiness requirements of 643- 2.02. TMAs shall be mounted on a vehicle with a minimum weight of 15,000 pounds and a maximum weight in ac cordance with the manufacturer’s recommendations. TMAs shall have an adjustable height so that it can be placed at the correct elevation during usage and to a safe height for transporting. Approach ends of TMAs shall have impact attenuator markings in accordance with the ATM. Do not use a damaged attenuator in the work. Replace any damaged TMA at your expense.
10.Traffic Control Vehicles. Use high intensity flashing strobe lights, oscillating beacons, or rotating beacons on the Work Zone Supervisor’s vehicle and on vehicles being used to transport and set -up traffic control devices. Vehicle hazard warning lights may supplement but are not permitted to be used instead of high intensity flashing strobe lights, oscillating beacons, or rotating beacons.

643-3.05 AUTHORITY OF THE ENG INEER . The Engineer will provide written notice when

conditions may adversely affect the traveling public’s safety and/or convenience. The notice will state the defect(s), the corrective action(s) required, and the time required to com plete the corrective action(s). If corrective action(s) are not completed within the specified time, the Engineer may immediately suspend work on the offending operations until the defect(s) are corrected. The Engineer may require outside forces to correct unsafe conditions. The cost of work by outside forces will be deducted from any monies due under the terms of this Contract.

643-3.06 TRAFFIC PRI CE ADJUSTMENT . A Traffic Price Adjustment, under Item

643.0023.____, will be assessed for unauthorized lane cl osures or reductions. Unauthorized lane reductions will be assessed as one full lane closure, for each lane reduced without authorization Authorized lane closures and/or lane reductions are those shown in the Contract, an approved TCP, or authorized in wri ting. Unauthorized lane reductions include unacceptable roadway, pedestrian walkway or route, and bicycle route or pathway surfaces, such as severe bumps, ruts, washboarding, potholes, excessive dust or mud, and non- conforming or out of place traffic cont rol devices. Failure to install temporary crash cushions or barriers, when required according to the Contract or TCP, is 413 ALASKA 2020 also considered an unauthorized lane reduction. The Engineer will make the sole determination whether unauthorized lane reductions or c losures are present. Adjustment Rates are listed in Table 643- 3. These rates are liquidated damages which represent highway user costs, based on Average Daily Traffic (ADT). The Engineer will use the rate shown for the current ADT for this project, as pub lished in the Regional Traffic Volume Report prepared by the Department's Planning Section. Adjustment rates for unauthorized reduction or closure of each lane of pedestrian walkways or route, and bicycle route or pathway, are the same as for one full road way lane closure. TABLE 643 -3 ADJUSTMENT RATES

643-3.07 MAINTENANCE OF TRAFFIC DURING S USPENSION OF WORK . Approximately one

month before work is suspended for the season, schedule a preliminary meeting with the Engineer and Maintenance & Operations to outline the anticipated roadway condition and the work expected to be completed before shutdown. Schedule a field review with the Department for winter maintenance acceptance. At the field review the Engineer will prepare a punch list for implementation before acceptance. To be relieved of winter maintenance responsibility, leave all roads with a smooth and even surface for public use at all times. Properly crown the roadbed surface for drainage and install adequate safety facilities. Make sure all illumination and signals, including vehicle detectors, are in good working order. After the project is accepted for winter maintenance and until you are ordered to resume construction operations, the Department is responsible for maintaining the facility. The Department will accept maintenance responsibility only for portions of the work that are open to the public, as determined by the Engineer. The Department will not accept maintenance responsibility for incomplete work adjacent to accepted roads. You are responsible for maintaining all other portions of the work. The Engineer will issue a letter of “Acceptance for Winter Maintenance” that lists all portions of the work that the Department will maintain during a seasonal work suspension. You retain all contractually required maintenance responsibilities until receipt of this letter. If you suspend work due to unfavorable weather (other than seasonal) or due to your failure to correct unsafe conditions, carry out Contract provisions, or carry out the Engineer’s orders, you must bear all costs for traffic maintenance during the suspended period. When you resume work, replace or rene w any work or materials lost or damaged during temporary use. If the Department caused damage during winter suspension, payment will be made for repairs by unit pay item or in accord with Subsection 109- 1.05, Compensation for Extra Work. When the Engineer directs, remove any work or materials used in the temporary maintenance. Complete the project as though work has been continuous.

643-3.08 CONSTRUCTIO N SEQUENCING . The construction sequencing detailed in these

provisions, the Special Provisions, and the Pl ans is suggested only. You may propose alternative construction sequencing. Published ADT Dollars/Minute of Unauthorized Lane Reduction or Closure Less than 1,000 $2 1,000 -4,999 $10 5,000 -9,999 $30 10,000+ $40 414 ALASKA 2020 Throughout the project, maintain the existing roadway, pedestrian walkway or route, and bicycle route or pathway configuration (such as the number of lanes and their respective wi dths) except for restrictions to traffic allowed in the Special Provisions or on the Plans, and addressed through approved TCPs. A restriction to traffic is any roadway surface condition, work operation, or traffic control setup that reduces the number of lanes or impedes traffic. Obtain an approved TCP before restricting traffic. Do not restrict traffic or shut down signals during the times listed in the Special Provisions.

643-3.09 INTERIM PAV EMENT MARKINGS . Place permanent or interim pavement markings

according to this Subsection, details shown on the Plans, approved TCPs, and Parts III and VI of the ATM before opening existing paved roadways, temporary paved roadways, detours, interim paving lifts, and roadways with seal coats and surface treatments for more than one continuous work shift. This work may include restriping the existing roadway before beginning construction, before seasonal suspension, and/or after seasonal suspension. Remove conflicting pavement markings according to Subsection 670- 3.04, P aint Removal. Pavement markings that are temporarily conflicting (markings that will be restored when construction is complete) may be removed according to Subsection 670- 3.04 or covered with black removable preformed marking tape. Mark existing roadway s ections that will be opened to traffic during the winter. Mark over the existing lines and markings, unless shown otherwise on the Plans or an approved TCP. Maintain all interim pavement markings for their intended life including reapplication when necessary. There will be no compensation to upgrade interim pavement markings required for work operations lasting up to 2 weeks. Use only temporary raised pavement markers or removable preformed retroreflective marking tape as interim pavement markings on final pavement surfaces. Completely remove and dispose of them when placing the final markings. Completely remove any residual adhesive that might misguide motorists. Place final pavement markings on finished pavement surfaces and interim pavement surfaces befor e suspending work for the winter. Stage construction to avoid routing traffic over conflicting markings for more than one continuous workshift. If traffic is routed over conflicting markings during a work shift, delineate the roadway with a complement of w arning signs, channelizing devices, and flaggers as required by the ATM. Use only temporary raised pavement markers meeting Subsection 712- 2.16 as interim markings on seal coat and surface treatment pavements. Install the markers according to the manufacturer’s instructions before applying the asphalt surface material and cover coat. Remove the vinyl protective covers after applying the asphalt pavement. On multicourse surface treatments, install the temporary raised pavement markers after applying the full width of the first layer of cover coat. Install the markers on each day's completed surface before removing the pilot car operations and allowing unescorted traffic on the surface treatment. Do not place final pavement markings until traffic has traveled over the seal coat or surface treatment for at least 14 days. Apply final pavement markings within 10 days of completing the final sweeping or brooming of the mainline seal coat or surface treatment.

643-3.10 LIGHTING FO R NIGHT WORK. Illuminate the night work areas according to Table

643-4. Table 643- 4 does not provide a comprehensive list of operations that require lighting. Provide lighting for other operations when necessary. 415 ALASKA 2020 Use balloon lighting as the main light sources. Do not use floodlights with out prior approval by the Engineer. When approved, install floodlighting in a manner that minimizes glare for motorists, workers, and residents living along the roadway. Locate, aim, louver, and/or shield light sources to reduce glare. The Engineer sh all be the sole judge of when glare is unacceptable, either for traffic or for adjoining residences. When notified of unacceptable glare, modify the lighting system to reduce glare to an acceptable level. TABLE 643 -4 NIGHT WORK ILLUMINAT ION EQUIPMENT AND L OCATION REQUIREMENTS If the Contractor fails to provide required lighting equipment or pro vides lighting that creates unacceptable glare, the Contractor shall cease all construction activities that require illumination, including flagging operations, until the condition or conditions are corrected. Use lighting equipment in good operating condi tion and that complies with applicable state and local adopted codes and standards, and OSHA, NEC, and NEMA requirements. Provide suitable brackets and hardware to mount lighting fixtures and generators on machines and equipment. Design mountings so lights can be aimed and positioned as necessary to reduce glare. Locate mounting brackets and fixtures so they don’t interfere with the equipment operator or overhead structures. Connect fixtures securely in a manner that minimizes vibration. Ensure ground, trai ler, and equipment -mounted light towers or poles are sturdy and freestanding without the aid of guy wires. Towers shall be capable of being moved as necessary to keep pace with the construction operation. Position ground and trailer -mounted towers and trai lers to minimize the risk of being impacted by traffic on the roadway or by construction traffic or equipment. Raise trailer or equipment mounted lights to maximum height, except do not exceed the clearance required for overhead objects such as overhead si gnals, overhead signs, trees, aerial utilities, or bridges. Aim and adjust lights to provide the required light levels. Provide uniform Type of Work or Equipment Lighting Configuration Paving, Milling, Striping, Pavement Marking Removal, Rumble Strip Installation At least one machine -mounted balloon light of at least 2000 watts. Provide additional lights or wattage if necessary to provide complete coverage. Rolling, pavement sweeping At least 4 sealed beam halogen lamps in the front and four in the back. Each should be at least 55 watts. Flagging One balloon light of at least 2000 watts, located within 30 feet of the flagger location. Locate so the flagger and the flagging location are illuminated. Provide additional lights or wattage if necessary to provide complete coverage of the flagging location. Truck Crossings where haul vehicles cross or enter a road wit h more than 10,000 ADT, or where the haul vehicle crossing or entering location is controlled by portable traffic signals or flaggers At least one balloon light of at least 2000 watts, located on the main road on the far right side of the intersection. Loc ate light within 30 feet of the edge of the side street. If there is a flagger at the crossing, locate the lights or lights so the lighting requirements for Flagging are also satisfied. 416 ALASKA 2020 illumination on the hopper, auger, and screed areas of pavers. Illuminate the operator’s controls on all machines unifor mly. Furnish each side of non -street legal equipment with a minimum of 75 square inches high intensity retroreflective sheeting in each corner, so at least 150 square inches of sheeting is visible from each direction. Provide red sheeting on the rear of t he equipment and yellow sheeting elsewhere. Existing street and highway lighting and conventional vehicle headlights may supplement but do not relieve the Contract requirement to provide lighting for night work, according to the requirements of Table 643- 4. Provide sufficient fuel, spare lamps, spare generators, and qualified personnel to ensure that all required lights operate continuously during nighttime operations. Ensure generators have fuel tanks of sufficient capacity to permit operation of the lighting system for a minimum of 12 hours. In the event of any failure of the lighting system, discontinue the operation that requires illumination until the required level and quality of illumination is restored. Maintain a supply of at least twenty emergenc y flares for use in the event of emergency or unanticipated situations. Comply with local noise ordinances. Install all post -mounted electroliers located within the clear zone, on NCHRP 350 or MASH compliant breakaway bases.

643-3.11 HIGH VISIBI LITY GARMEN TS. Ensure all workers within project limits wear outer

garments that are highly visible and comply with the following requirements:

1.Standards . Use high visibility garments conforming to the requirements of ANSI/ISEA 107- 2004, Class 2 for tops or Class E for bottoms, and Level 2 retroreflective material.
2.Labeling. Use garments labeled in conformance with Section 11.2 of ANSI/ISEA 107- 2004 or ANSI/ISEA 107 -2010.
3.Tops . Wear high visibility vests, jackets, or coverall tops at all times.
4.Bottoms . Wear high visibility pants or coverall bottoms during nighttime work (sunset to sunrise). Worksite traffic supervisors, employees assigned to traffic control duties, and flaggers wear high visibility pants or coverall bottom at all times.
5.Outer Raingear. Wear raingear tops and bottoms conforming to the requirements of this Subsection 643- 3.11.
6.Exceptions . When workers are inside an enclosed compartment of a vehicle, they are not required to wear high visibility garments.
7.Condition. Furnish and maintain all vests, jackets, coveralls, rain gear, hard hats, and other apparel in a neat, clean, and presentable condition. Maintain retroreflective material to Level 2 standards. Payment for high visibility garments for workers is subsidiary to other traffic contrac t items.

643-4.01 METHOD OF M EASUREMENT . See Section 109 and as follows. Quantities will not be

measured during winter suspension of work.

1.Traffic Maintenance. Calendar Day: Every day shown on the calendar, beginning and ending at midnight. Measurement beg ins on the day following receipt of the Notice to Proceed or on the first day of work at the project site, whichever is later, and ends on the date of project completion. 417 ALASKA 2020 2. Traffic Control Device Items. By the number of units of each bid item shown on the bi d schedule (or the Traffic Control Rate Schedule, if item 643.0025.____, Traffic Control, is included) that are installed, accepted, and operational. Incomplete or unsatisfactory devices will not be measured. Special Construction Signs are measured by the total area of legend- bearing sign panel, as determined under Subsection 615- 4.01. Items measured by the day are for each item per 24- hour period.
3.Traffic Maintenance Setup Items. By each lane closure or one- lane road in place per hour. By each detour or road closure in place per 24- hour period.
4.Portable Concrete Barrier. By each nominal 12.5 foot section placed according to the approved TCPs, for the initial placement and for each subsequent relocation when moved more than 10 feet in any direction. Each tra nsition piece (sloping end) will be measured as a single section.
5.Temporary Crash Cushion. By each acceptable installation.
6.Interim Pavement Marking. By the single- stripe station. A single stripe is a marking or a temporary raised pavement marker 4 inches wide. Wider striping is measured in multiples of 4 inches. Centerline gaps are not deducted from measurements.
7.Flagging and Pilot Car. By the number of approved hours, supported by certified payroll.
8.Street Sweeping. By the number of operated hours, supported by certified payroll and approved by the Engineer.
9.Watering. By the 1,000 gallons (M- Gallon) of water applied. The Engineer may specify measurement by weight or volume. If by weight, convert to gallons at 8.34 pounds per gallon. If by volume, convert to gallons at 7.48 gallons per cubic foot.
10.Traffic Price Adjustment. By each minute that any lane of traffic is not open to full use by the traveling public, measured to the nearest minute. The Engineer will determine whether the roadway is opened to full use.
11.Traffic Control. By the units specified in the Special Provisions.
12.Portable Changeable Message Board Sign. By the 24- hour period for each sign, as shown on an approved TCP and displaying an approved message.
13.Plastic Safety Fence. By the linear foot, as placed, to protect or channelize pedestrian traffic as shown on an approved TCP. Any adjustments in configuration of the fence at the same location that does not result in an increased amount of fence is not measured. Opening and closing the fence to gain access to and from the worksite is not measured.
14.Temporary Sidewalk Surfacing. By the square yard as shown on an approved TCP.
15.Temporary Guardrail. By the linear foot, including end treatments, as shown on an approved TCP.
16.Portable Steel Barrier . By the linear foot placed according to the manufacturer’s recommendation and approved TCPs, for the initial placement, and for each subsequent relocation when moved more than 10 feet in any direction.

643-5.01 Basis of Pa Yment .

1.Traffic Maintenance. The cont ract price includes all resources required to provide the Worksite Traffic Supervisor, all required TCPs and public notices, the Construction Phasing Plan, and the maintenance of all roadways, approaches, crossings, intersections and 418 ALASKA 2020 pedestrian and bicycle facilities, as required. This item also includes any Traffic Control Devices required but not shown on the bid schedule. Items required by the Contract that are not listed on the bid schedule or not included in other items are subsidiary to Item 643.0001. ____ or 643.0002.____ Traffic Maintenance, except the following:
a.Traffic Price Adjustment
b.Traffic Maintenance Setup
2.Traffic Control Device Items. The contract price includes all resources required to provide, install, maintain, move, and remove the specifi ed devices. Warning lights, high- level warning devices, vertical panels, and sign supports required for traffic control devices are subsidiary.
3.Traffic Maintenance Setup Items. Each setup consists of all traffic control devices, flaggers, pilot cars, and s ubsidiary items necessary to implement the TCP shown on the Plans. Warning lights, high- level warning devices, vertical panels, and sign supports required for traffic control devices are subsidiary. Construction and obliteration of temporary roadways, whe n required on the Plans or approved TCP under a traffic maintenance setup item, is paid for under their respective roadway pay items. When topsoil or seeding is required for detours, payment will be made under Sections 620 and/or 618.
4.Portable Concrete Barrier. The contract price includes all resources required to provide, install, maintain, and remove each barrier section.
5.Temporary Crash Cushion. The contract price includes all resources required to provide, install, maintain, repair, and remove each crash cushion.
6.Interim Pavement Marking. The contract price includes all resources required to provide, install, maintain, and remove the specified markings. Installation of word and symbol markings are subsidiary. The No- Passing Zone signing, described in S ubsection 643- 3.04, is subsidiary.
7.Flagging and Pilot Car. The contract price includes all required labor, vehicles, radios, flagger paddles and pilot car signs, and transportation to and from the worksite.
8.Street Sweeping. The contract price includes all resources required to keep the roadway free of loose material.
9.Watering. The contract price includes all resources required to provide watering, as directed.
10.Traffic Price Adjustment. If Item 643.0023.____, Traffic Price Adjustment, is shown on the bid schedule, the total value of this contract will be adjusted, for unauthorized lane reductions or closures, at the rates listed in Table 643- 3.
11.Traffic Control. Payment for Item 643.0025.____, Traffic Control, will be made at the unit rate value contained in the Traffic Control Rate Schedule shown in the Special Provisions for the accepted units of traffic control devices.
12.Portable Changeable Message Board Sign. The contract price includes all resources required to furnish, move, and operate the sign. 419 ALASKA 2020 13. Plastic Safety Fence. The contract price includes all resources required to install, maintain, and remove the fence.
14.Temporary Sidewalk Surfacing. The contract price includes all resources required to construct, maintain, and remove the surfacing.
15.Temporary Guardr ail. The contract price includes all resources required to construct, maintain, and remove the guardrail.
16.Portable Steel Barrier . The contract price includes all resources required to provide, install, maintain, move and remove each barrier.
17.Lighting for Night Work. Payment for illuminating night work areas and any required adjustments to work zone illumination is subsidiary to other items. Traffic control devices, barriers, and crash cushions required to delineate or shield fixed objects will not be meas ured or paid for separately, but will be subsidiary Traffic control devices, barriers, and crash cushions required to delineate or shield guardrail posts or non- crashworthy ends will not be measured or paid for separately, but will be subsidiary, when required for failure to meet completion timelines in subsection 606- 3.01. Payment will be made under: PAY ITEM Item Number Item Description Unit 643.0001.____ Traffic Maintenance CDAY 643.0002.____ Traffic Maintenance LS 643.0003.____ Permanent Constructi on Signs LS 643.0004.____ Construction Sign DAY 643.0005.____ Type II Barricade DAY 643.0006.____ Type III Barricade DAY 643.0007.____ Traffic Cone/Tubular Marker DAY 643.0008.____ Plastic Safety Fence LF 643.0009.____ Drum DAY 643.0010.____ Sequent ial Arrow Panel, Type C DAY 643.0011.____ Special Construction Signs SF 643.0012.____ Portable Concrete Barrier EACH 643.0013.____ Temporary Crash Cushion EACH 643.0014.____ Interim Pavement Marking STA 643.0015.____ Flagging HR 643.0016.____ Pilot C ar HR 643.0017.____ Street Sweeping HR 643.0018.____ Watering MGAL 643.0019.____ Lane Closure HR 643.0020.____ Detour DAY 643.0021.____ Road Closure DAY 643.0022.____ One Lane Road HR 643.0023.____ Traffic Price Adjustment CS 643.0024.____ Portable Changeable Message Board Sign DAY 643.0025.____ Traffic Control CS 643.0026.____ Temporary Sidewalk Surfacing SY 643.0027.____ Temporary Guardrail LF 643.0030.____ Portable Steel Barrier LF 643.0031.____ Interim Pavement Marking LS 420 ALASKA 2020 PAY ITEM Item Number Item Description Unit 643.0032.____ Flagging CS 643.0033.____ Detour LS 421 ALASKA 2020 SECTION 644 SERVICES TO BE FURNI SHED BY THE CONTRACT OR

644-1.01 DESCRIPTION . Furnish and maintain facilities and services specified in the Contract for

the Department’s project administrative personnel to use during the project. Services include heat, electrical power (NEC compliant), water and any others required to operate the facilities. All furnished facilities remain your property when you complete the work.

644-2.01 FIELD OFFIC E. Furnish and maintain a suitable off ice for the Engineer to use during

construction. If this office is part of your building, completely partition it from the rest of the structure and provide a separate outside door equipped with a lock. Provide a suitable stove or other heating device with fuel. Furnish adequate electrical lighting and 120- volt, 60 -cycle power. Construct the office with at least 500 ft 2 of floor space and at least 60 ft2 of window area, along with adequate ventilation. Provide at least 12 feet of shelf space. Equip the fiel d office with sanitary facilities. Provide janitorial services at least weekly. Furnish and install a high speed internet service and three telephones, with all necessary ancillary equipment. Unless approved in advance by the Engineer, the internet system shall consist of Digital Subscriber Line service, or better, and shall have a send and receive capability supporting 10.0 Mbps download speed or higher and 2.0 Mbps upload speed at all times. The internet system shall have an unlimited monthly data usage, or 50 GB minimum, if approved by the Engineer. Include a wireless router and an appropriately sized battery backup for the internet system. The system shall be for the exclusive use of the Engineer. The telephone system shall consist of commercially avai lable telephones with the necessary equipment for each line. Provide one telephone that includes a built in digital answering machine. Internet and telephone service shall be supplied and operational no more than two weeks after the field office has been set up on site. Service plans shall be provided and remain in effect for the duration of the use of the field office. All long distance calls made by State personnel will be paid by the State. Installation and maintenance fees, local calls, connection fees and internet service provider fees, and all other fees shall be paid by the Contractor. Provide at least one designated handicap parking space. Make the field office accessible according to the requirements of 2006 U. S. DOT ADA Standards for Transport ation Facilities. Make the field office available for occupancy 2 weeks before commencing work on the project through one week after project completion.

644-2.02 FIELD LABOR ATORY. Furnish and maintain a field laboratory for the Engineer to use

exclusively throughout the contract. Provide a completely functional installation 2 weeks before commencing construction work through one week after Project Completion.

1.Grade and compact a site for the lab acceptable to the Engineer. Locate and level the structure on this site. If subsequent ground movement causes an unlevel or unstable condition, re- level or re- locate the facility as directed.
2.Provide a weatherproof structure suitable to field test construction materials, with the following minimum functional requirem ents:
a.Floor space of 300 ft
b.Two 10- ft2 windows that open and lock
Source: Alaska Standard Specifications for Highway Construction, 2020 Edition. Pages 429448 of 584.