395 ALASKA 2020 SECTION 642 CONSTRUCTION SURVEYI NG AND MONUMENTS
642-1.01 DESCRIPTION . Perform surveying and staking essential for the completion of the
project and perform the necessary calculations required to accomplis h the work in conformance with the Plans and Specifications and standard engineering and survey practice. Furnish and install survey monuments and monument cases in conformance with the Plans or as directed. Adjust existing monuments and monument cases to conform to the new elevations.
642-1.02 Definitions .
642-2.01 Materials.
642-3.01 GENERAL. Use competent, qualified personnel and suitable equipment for the layout
work required and furnish traffic control, stakes, templates, straight -edges and other devices necessary for establishing, checking and maintaining the required points, lines and grades. 396 ALASKA 2020 Furnish computer services to accomplish the work. Check data received from the computer for completeness and accuracy. As soon as practical after completion of the work, and in no case later than acceptance of the project , deliver field books, computer forms and computer output data to the Engineer. This data becomes the property of the Department. Supervise construction surveying personnel. Correct errors resulting from the operations of said personnel at your expense. The Contractor is responsible for the accuracy of the work. Work classified as Land Surveying under AS 08.48, and work involving the location, control, and monumentation of construction centerline and right -of-way, must be performed by or under the responsi ble charge of a Professional Land Surveyor. Follow the Department’s Construction Surveying Requirements . The Department will provide sufficient centerline or reference thereto, and at least 2 benchmarks per mile to enable the establishment of planned eleva tions and centerline. Keep field notes in standard hardbound notebooks in a clear, orderly, and neat manner consistent with Departmental procedures, including titles, numbering, and indexing. Make field books available for inspection by the Engineer’s proj ect personnel at any time. Store the field books in the Engineer’s Project Office during periods of non- use. Perform the following:
642-3.02 CROSS -SECTI ON SURVEYS. When required, obtain right -angle cross sections to the
construction centerline at the interval detailed in the Department’s Constructi on Surveying Requirements . The Department will supply following:
642-3.03 MONUMENTS. Install primary and secondary monuments, as called for in the Plans, at
the positions determined by the Department. Reference property markers/corners, monuments, or accessories that may be disturbed or buried during construction. Prepare and record Monument Record Forms in the appropriate Recorder’s Office before disturbing monuments. Monument Record Forms may be obtained from the Engineer. Reestablish monuments in their original position before completion of the project. Prepare and file a Monument Record F orm for each reestablished monument. Keep records and report to the Engineer evidence that a monument has been disturbed and is no longer reliable or cannot be located and is presumed to be lost or obliterated. Establish a minimum of two in- line reference points, or three swing- tie reference points in situations where in- line referencing is not desirable. Set reference points outside of the construction limits. Measure distances from the monument to the nearest 0.01 foot. Record referencing of monuments i n a separate field book stamped by the Surveyor. Replace existing monuments disturbed by construction with Primary or Secondary Monuments meeting the requirements of subsection 642- 2.01. When it is impractical to establish a monument in its original position, install a witness corner (WC). Place the WC to a property corner on the property line when the other property corner that defines said line is existing or there has been sufficient retracement to define said line. In other cases, place a reference monu ment (RM) perpendicular to the centerline at the station of the original position and at a distance from the original position measured in whole feet. Replacing monuments not shown on the Plans will be considered additional work and paid by 642.0003.____, Three Person Survey Party. Those monuments found that are not shown on the Plans will be recognized by the Department when the Surveyor provides timely field notes identifying type and location of the monument, and a description of the point the monument marks, with the reason to preserve its location. 399 ALASKA 2020 The Surveyor must complete and stamp a State of Alaska Land Survey Monument Record form for each primary and secondary monument removed, installed, relocated, or replaced. Provide the required survey information on the form in accordance with statutory requirements, including section, township, and range. Meet requirements for recording at the District Recorder’s Office in which the project is located for each monument record. Deliver conforming copies of the recorded forms to the Engineer before monument removal or disturbance and after setting any final monuments requiring monument records. Set each monument and monument case accurately to lines established at the required location and in a manner as to ens ure being held firmly in place. Set existing monuments and monument cases to be adjusted to new elevations in the manner and at the elevations directed.
642-3.04 OFFICE ENGI NEERING. Calculate finish grades for the roadway as specified according
to Plans and/or Specifications. Use information available in the field, on as -builts, or as provided by the Engineer. Perform the work by, or under the responsible charge of, a person registered in the State of Alaska as a Professional Land Surveyor or a Professional Engineer.
642-3.05 FINAL TRAVE RSE. Within 30 days after the Engineer receives a letter stating that
construction activities that may disturb the monuments have ceased, the Surveyor shall run a final closed traverse to verify the positional accuracy of ins talled survey monuments. Begin and end this traverse at different Department -provided control points. Tie into the traverse the primary and secondary monuments placed or replaced and undisturbed Department -provided control points. Do not run the final trav erse more than 2.5 miles without a tie to a Department -provided monument/control point. Meet the requirements of a secondary monument for traverse points established during this work. Have the Surveyor sign and stamp a letter that lists each monument and i ts coordinates and certify that the monuments are each located within 0.2 feet of their proposed position based on the project survey control points provided by the Department. Deliver the certification letter and field notes for this work to the Engineer.
642-4.01 METHOD OF M EASUREMENT. See Section 109 and as follows:
Item 642.0002.____ Office Engineering. By the project mile along centerline for completed office engineering accepted. Item 642.0003.____ Three Person Survey Party . By the hour for extra, add itional, or unanticipated work made necessary by changes in the project, as directed, and as supported by certified payrolls. If staking for extra, additional or unanticipated work, as stated above, is performed by a two person survey party, measurement wi ll be made at 75 percent of the hours worked and paid under Item 642.0003.____, Three Person Survey Party. If a single person is required for additional office computations or other work requiring only one person, payment will be made at 32 percent of the hours worked and paid under Item 642.0003.____. Items 642.0004.____ through 642.0008.____. The actual number of monuments installed, replaced, or adjusted as shown on the “State of Alaska Land Survey Monument Record” forms delivered to and accepted by the Engineer. Item 642.0009.____ Reference Existing Monument . The actual number of monuments referenced as shown in the recorded Monument Record Forms delivered to and accepted by the Engineer. Items 642.0010.____ and 642.0011.____. The actual number of monum ent cases furnished and installed, or adjusted to new elevation, and accepted. Item 642.0013.____ Three Person Survey Party . Co ntingent sum work will be measured according to subsections 101- 1.03 and 109- 1.02 or 109- 1.05. This item, when appearing on the 400 ALASKA 2020 Bid Schedule, will be used only for additional or unanticipated work made necessary by changes in the Contract. Department personnel will perform calculations of pay quantities.
642-5.01 BASIS OF PA YMENT. Construction Surveying and Final Traverse includes f ield and
office work required to accomplish the work, including furnishing necessary personnel, equipment, transportation and supplies. Payment for Final Traverse is based on the Engineer’s acceptance of the Surveyor’s certification letter and field notes. When bid item 642.0009.____ Reference Existing Monument does not appear in the bid schedule, work necessary to reference existing monuments, and prepare and file Monument Record Forms is subsidiary to Item 642.0001.____ Construction Surveying. Five percent of the contract lump sum bid price for Item 642.0002.____ will be withheld until the Monument Record Forms are prepared and recorded in the local Recorder’s Office and accepted by the Engineer. When bid item 642.0009.____ Reference Existing Monument ap pears in the bid schedule, payment will be made after the Monument Record Forms are prepared and recorded in the local Recorder’s Office and accepted by the Engineer. Office Engineering when required is in addition to Construction Surveying. Both items wi ll appear on the bid schedule. Traffic control devices necessary for the survey parties are considered subsidiary. Survey monuments placed on bridges are subsidiary. Payment for Traffic Control Plans will be paid under Section 643, Traffic Maintenance. Payment will be made under: PAY ITEM Item Number Item Description Unit 642.0001.____ Construction Surveying LS 642.0002.____ Office Engineering MILE 642.0003.____ Three Person Survey Party HR 642.0004.____ Set Primary Monument EACH 642.0005.____ Set Secondary Monument EACH 642.0006.____ Replace Existing with Primary Monument EACH 642.0007.____ Replace Existing with Secondary Monument EACH 642.0008.____ Adjust Existing Monument EACH 642.0009.____ Reference Existing Monument EACH 642.0010.____ Monu ment Case EACH 642.0011.____ Adjust Existing Monument Case EACH 642.0012.____ Final Traverse LS 642.0013.____ Three Person Survey Party CS 401 ALASKA 2020 SECTION 643 TRAFFIC MAINTENANCE
643-1.01 DESCRIPTION . Protect and control traffic during the contract. Furnish, erect, maintain,
replace, clean, move and remove the traffic control devices required to ensure the traveling public’s safety. Perform all administrative responsibilities necessary to implement this work. Maintain all roadways and pedestrian and bicycle f acilities affected by the work in a smooth and traversable condition. Construct and maintain approaches, crossings, intersections, and other necessary features throughout the project for the life of the contract. Illuminate construction activities listed i n Table 643- 4 during hours of night work on roads open to the public within project limits.
643-1.02 DEFINITIONS . These definitions apply only to Section 643.
ATM . When used in this Section, ATM stands for the Alaska Traffic Manual , which is comprised of the Manual on Uniform Traffic Control Devices (MUTCD), the Alaska Traffic Manual Supplement, any adopted revisions or interim addenda to either document issued subsequently, and corrections to known errors to either document. BALLOON LIGHT. Light surround ing by a balloon- like enclosure kept inflated by pressurized air or helium, and producing uniform light through 360 horizontal degrees. CONSTRUCTION PHASING PLAN . A plan for each phase of the project showing how to accommodate traffic. Show the sequence of work by segment or phase, if required. FIXED OBJECTS. Private vehicles, parked flagger vehicles, idle construction equipment, construction material stockpiles, culvert ends, individual trees, power poles, utility poles and appurtenances, and other items deemed by the Engineer to present a hazard to motorists, pedestrians, or bicyclists traveling through the work zone. NIGHT WORK. Work occurring between sunset and sunrise on all days except the “No Lighting Required” period shown in the Table 643- 1 below: TABLE 643 -1 PROJECT LOCATIONS – NIGHT TIME ILLUMINAT ION EXCLUSION Latitude (degrees) No Lighting Required Nearby Cities Start End South of 61 Lighting Required All Year Everything South of Hope 61 June 11 July 1 Anchorage, Valdez, Girdwood 62 June 2 July 13 Wasilla, Palmer, Glennallen, Talkeetna 63 May 27 July 17 Cantwell, Paxson, McGrath 64 May 22 July 21 Tok, Delta, Nome 65 May 18 July 25 Fairbanks 66 May 14 July 29 Circle City 67 May 10 August 2 Coldfoot, Kotzebue 68 May 7 August 6 Galbraith Lake 69 May 3 August 9 Happy Valley 70 April 30 August 12 Deadhorse 71 April 27 August 15 Barrow 72 April 24 August 19