272 ALASKA 2020 SECTION 520
520-1.01 DESCRIPTION . For each site where public traffic uses a temporary crossing or a
Contractor uses a temporary crossing that is elevated over a public route, construct and maintain the temporary crossing. Remove temporary crossings after use and cleanup the site. Design temporary bridges, change the preliminary design of approach roads to accommodate temporary bridges, and have an independent design check performed. Inspect and perform quality acceptance on temporary bridges.
520-1.02 Definitions .
DESIGNER OF RECORD ( DOR). A civil engineer registered as a Professional Engineer in the State of Alaska, and in responsible charge of the work described. The DOR must have adequate and relevant prior bridge design and inspection experience. The DOR may delegate portions of design, quality acceptance, and inspection work, to qu alified technicians. The DOR and qualified technicians must not be supervised by, or under the direction of the Contractor’s temporary crossing superintendent and work crew. INDEPENDENT ENGINEER (IE). An engineer registered as a Professional Engineer in the State of Alaska, and in responsible charge of the independent design check. The engineer responsible for the check must have adequate and relevant prior bridge design experience. The engineer responsible for the check shall not be employed by the Contr actor or the same firm as the Designer of Record; or employed by a firm managed or owned by the Contractor or the Designer of Record; nor shall the engineer performing the work manage or own the Contractor or the firm employing the Designer of Record. INDEPENDENT DESIGN CHECK (IDC). An independent design check of the temporary bridge package including but not limited to: design, location and dimensions of the foundation, structural members, connections, erection plan and temporary bracing (when required), safety barrier, and independent calculations of design loads, member stress, material properties, hydraulic capacity and scour protection. TEMPORARY BRIDGE. A temporary bridge used by the public or over a public route, including abutments, piers, safety ba rrier and railing, foundation scour protection, and other incidentals. TEMPORARY BRIDGE PAC KAGE (TBP). Design calculations from the DOR and IE, working drawings, specifications, load rating, and all items identified on Form 25D -080, necessary to construct a temporary bridge. TEMPORARY CROSSINGS. A detour route that includes temporary bridges, approach roads and other incidentals. MATERIALS AND DESIGN
520-2.01 MATERIALS. New or used materials must meet the requirements of the design and the
Contract. The DOR must verify the quality of temporary bridge materials before incorporation into the project.
520-2.02 GEOTECHNICA L DATA AND HYDROLOGY REPORT. The Department may provide
records of geotechnical investigations. The Contractor is responsible for obtaining all additional geotechnical data necessary for design and construction of the temporary crossings. The Department may provide a preliminary hydrology and hydraulics report. The Contractor is responsible for obtaining all additional hydrology and hydraul ics data necessary for design and construction of the temporary crossings. 273 ALASKA 2020 520-2.03 TRAFFIC CON TROL PLAN. Submit a traffic control plan for temporary crossing according to the Plans and Section 643.
520-2.04 DESIGN REQU IREMENTS. Retain the services of a DOR to design temporary bridges,
and to provide a TBP. When the temporary bridges are used as a construction platform for the Contractor’s equipment or workers, then design and construct temporary bridges that are wide enough for traffic lanes and construc tion areas, and strong enough to support design traffic and construction loads. The Department will provide preliminary designs for approach roads. The DOR may change the design of approach roads to accommodate temporary bridges.
520-2.05 DESIGN SUBM ITTAL AND REVIEW. Comply with the following:
520-2.06 VALUE ENGIN EERIN G CHANGE PROPOSALS. Base your bid on supplying
temporary bridge structures according to the Contract documents. After Award you may submit construction value engineering change proposals to the Engineer. Proposals must include permitting requirements and t imelines for construction. The Department will consider value engineering change proposals in accordance with Subsection 104- 1.06. CONSTRUCTION REQUIREMENTS
520-3.01 TRAFFIC MAI NTENANCE. Protect and control traffic according to Section 643 and the
approved traffic control plan.
520-3.02 CONSTRUCTIO N AND MAINTENANCE RE QUIREMENTS. Construct temporary
crossings entirely within the right -of-way and within permitted areas. Construct the temporary bridge according to the approved TBP. Construct the approach roads according to the Plans and Specifications, as modified by the DOR and approved by the Engineer. Construct according to the Standard Specifications for Highway Construction with exceptions noted by the DOR and this Section 520. Bolted steel connections must use load indicating washers. Weld according to Subsection 504- 3.01.7 Welding. Maintain structure, safety appurtenances, and wearing surface of temporary crossings until substantial completion. Maintain temporary crossings in a safe and functional condition. Keep bracing and connections tight, and immediately replace any damaged members or damaged connections. Promptly remove debris caught against, under or inside, temporary bridges. Limit surface deviations to 3/8 inch, as measured from the testing edge of a 10- foot straightedge, between two contacts on the driving surface of the temporary crossings. SECTION 5 20 276 ALASKA 2020 520-3.03 WINTER MAIN TENANCE. The Department may accept the maintenance responsibility for winter snow and ice removal only. The Contractor retains responsibility for all repairs and maintenance, in accordance with Subsections 105- 1.13 and 107- 1.15.
520-3.04 INSPECTION. The Contractor is responsible for Quality Control, and for the
construction of temporary crossings, including temporary bridges and approach roads, to conform to the working drawings, specifications and the Contract requirements. The DOR is in responsible charge of Quality Acceptance and inspection, of temporary bridge materials and construction work. The DOR must verify in writing that the quality of bridge materials and construction work meet the design and Contract requirements. The DOR or qualified technician is required to be on- site and to inspect critical work including but not limited to abutments, piers, pile driving, welding, struc tural elements, fastening of structural elements, reinforcing steel placement, concrete pours, and foundation scour protection. The Engineer may sample and test materials, and may reject materials that do not meet the requirements of the design. The Engi neer may inspect the construction of temporary crossings at any phase of construction and reject unacceptable work. The Engineer will inspect the finished construction of temporary crossings before public use; however, inspection by the Engineer will not relieve the Contractor from any responsibility for defective work.
520-3.05 APPROVALS. Obtain the following written approvals from the Engineer:
520-3.06 CLEANUP. Remove temporary crossings, cleanup site, and stabilize site from erosive
forces before final completion. Return the site substantially to its original condition. Additional cleanup conditions may be listed in the permits. Remove piling to a minimum of one f oot below ground level.
520-4.01 METHOD OF M EASUREMENT. See Section 109.
520-5.01 Basis of Pa Yment.
Temporary Crossings . The lump sum payment is full compensation for all design, engineering, load rating, inspection, labor, equipment and materials neces sary to furnish, install, repair, 277 ALASKA 2020 maintain and remove temporary crossings in their entirety. The lump sum payment also includes all traffic control and traffic maintenance within the limits of the temporary crossings. Payment will be made under: PAY ITEM Item Number Item Description Unit 520.0001.____ Temporary Crossings LS 278 ALASKA 2020 SECTION 550 COMMERCIAL CONCRETE
550-1.01 DESCRIPTION . Furnish, place, finish, and cure Portland cement concrete for
manholes, inlets, sidewalk, curb, gutter and other minor structures and incidental construction as shown on the Plans.
550-2.01 MATERIALS. Use materials conforming to Subsection 501- 2.01.
550-2.02 COMPOSITION OF MIXTURE – JOB MI X DESIGN. Provide a Job Mix Design, JMD,
meeting the requirements of Table 550- 1 for each class of concrete included in the Contract. TABLE 550 -1 COMMERCIAL CONCRETE DESIGN REQUIREMENTS Class B W Water -Cement Ratio, lbs/lbs, maximum 0.45 0.50 Total Air Content, % 5.5 – 6.5 4.0 – 6.5 Coarse Aggregate Gradation, AASHTO M 43 No. 57 or 67 No. 7, 8, 57, or 67 Compressive Strength, psi, minimum 4,000 3,000 Alternative sizes of coarse aggregate, as shown in AASHTO M 43, may be used when approved in writing. Calculate the water -cement ratio based on the total weights of all water and all cementitious material. Portland cement, blended hydraulic cement, fly ash, ground granulated blast -furnace slag, and silica fume are cementitious materials. Fly ash, ground granulated blast -furnace slag, silica fume, and combinations of these materials may be used as a substitute for Portland cement provided the quantity meets the limits of Table
550-2 and the total combined quantity of fly ash, ground granulated blast -furnace slag, and silica
fume does not exceed 40 percent of the total cementitious materi al by weight. TABLE 550 -2 SUPPLEMENTARY CEMENT ITIOUS MATERIAL LIMI TS Material Max. Percent Fly Ash 35% Ground Granulated Blast -Furnace Slag 40% Silica Fume 10% Maximum percent includes initial quantities in blended cement plus supplementary cementitious materials.