232 ALASKA 2020 SECTION 507
507-1.01 DESCRIPTION. Construct concrete, timber, or steel bridge railing, pedestrian railing
and safety railing as shown on the Plans. Furnish and install bridge number plates as shown on the Plans.
507-2.01 MATERIALS. Use materials that conform to the following:
Steel Railing Section 722 Timber Railing Section 506 Concrete Section 501 Epoxy -Coated Reinforcing Bars Subsection 709- 2.01 Grout Section 701- 2.03 Cable Use ¼ inch galvanized wire rope with a minimum breaking force of 7,000 pounds. Bronze ASTM B98, UNS Alloys C65100 or C65500 or ASTM B584, UNS Alloy C92200 CONSTRUCTION REQUIREMENTS
507-3.01 Constructio N Requirements.
507-4.01 METHOD OF M EASUREMENT. See Section 109.
507-5.01 BASIS OF PA YMENT. The contract price includes all rail elements, rail posts, brackets,
spacers, fastenings and anchors required to attach the ra iling to the structure; concrete and associated reinforcing steel included or partially contained within the limits of the concrete rail section or within the limits of the concrete curb for the steel bridge rail section; and bridge number plates. 233 ALASKA 2020 Payment will be made under: PAY ITEM Item Number Item Description Unit 507.0001.____ Steel Bridge Railing,______ LF 507.0002.____ Pedestrian Railing LF 507.0003.____ Thrie Beam Bridge Railing LF 507.0004.____ Concrete Bridge Barrier LF 507.0005.____ Timbe r Bridge Railing LF 507.0006.____ Cable Safety Railing LF 234 ALASKA 2020 SECTION 508 WATERPROOFING MEMBRA NE
508-1.01 DESCRIPTION . Furnish and install waterproofing membrane system on concrete bridge
decks. Remove and dispose of waterproofing membrane systems on exist ing concrete bridge decks.
508-1.02 SUBMITTALS. Submit for approval a copy of the manufacturer’s latest data sheets,
installation procedure, curb and corner details, and manufacturer’s on- site representative’s name and experience. For low voltage electric field vector mapping (EFVM) acceptance methods, submit for approval an acceptance testing plan. Include a list of equipment to be used, a diagram showing installation locations, inspection method, inspector’s name and experience, and a letter from the mem brane manufacturer stating that the system is compatible with EFVM testing. The EFVM inspector must not be employed by the contractor, subcontractor, or installer. Provide one complete submittal not less than 30 days prior to installation of the waterproof ing membrane system.
508-1.03 MANUFACTURE R’S ON -SITE REPRESEN TATIVE. Install waterproofing membrane
system under the on- site supervision of a third- party representative from the manufacturer. The representative must not be employed by the contractor, subc ontractor, or installer. The representative must be on site for the full duration of installation, testing, and during placement of the first lift of pavement overlay material. Do not substitute manufacturer’s representative listed in the submittal without prior written approval from the Engineer.
508-2.01 MATERIALS. Use materials that conform to the following:
Spray -Applied Waterproofing Membrane Subsection 731- 2.01 Sheet Waterproofing Membrane Subsection 731- 2.02 Pavement Overlay Material Division 400 CONSTRUCTION REQUIREMENTS