224.02 Materials.
Material furnished for use under this Section shall be of the quality and character noted on the plans or ordered by the Engineer, suitable for the purpose intended, and consistent with the requirements for such materials as may be noted in other parts of these Specifications.
224.04 Method of Measurement.
a.Lime Sink Excavation. Measurement for this item will be in cubic yards {cubic meters} computed from field measurements of the material actually removed as directed.
b.Special Backfill for Lime Sink. Special backfill material, furnished as directed, will be measured in cubic yards {cubic meters}, loose measurement, or per ton {metric ton} in the transporting vehicle. The boulder or plug will be measured for payment as an estimated number of cubic yards {cubic meters} or an estimated tonnage {metric tonnage}.
c.Concrete Seal. When the use of a concrete seal is ordered, measurement will be made in cubic yards {cubic meters} computed from field measurement of concrete actually placed. All reinforcement required will be measured in accordance with Section 502, Steel Reinforcement. SECTION 230 ROADBED PROCESSING 224.05 Basis of Payment.
1.The accepted volume of Lime Sink Excavation, measured as provided above, will be paid for at the contract unit price bid which shall be payment in full for the removal and disposal of the excavated material in a manner satisfactory to the Engineer, and for all equipment, tools, labor, and incidentals necessary to complete the work in accordance with the plans and this Specification.
2.The accepted volume of Special Backfill material, including the plug, measured as noted above in accordance with the method provided in the contract (cubic yard {cubic meter} or ton {metric ton}), will be paid for at the contract unit price bid which shall be payment in full for the item complete in place and shall include all costs incidental to procurement, excavating, hauling, dumping, spreading, and formation of the embankment and for all equipment, tools, labor, and incidentals necessary to complete the work in accordance with the plans and these Specifications.
3.The accepted volume of concrete for the seal, measured as noted above, will be paid for at the contract unit price bid which shall be full compensation for the preparation of the concrete bed, furnishing of all materials, mixing, hauling and placing, and for all labor, tools, equipment, and incidentals necessary to complete the item. Steel reinforcement will be paid for under Item 502, Steel Reinforcement. b.Payment will be made under Item No.: 224-A Lime Sink Excavation - per cubic yard {cubic meter} 224-B Special Backfill for Lime Sink, Type Material - per cubic yard {cubic meter} 224-C Special Backfill for Lime Sink, Type Material - per ton {metric ton} 224-D Concrete Seal for Lime Sink - per cubic yard {cubic meter} SECTION 230 ROADBED PROCESSING
230.01 Description.
This Section shall cover the operations required to provide a satisfactory roadbed for receiving a base or pavement structure layer. Roadbeds will be of two types: (1) Improved Roadbeds when designated on the plans or (2) Modified Roadbed whenever Improved Roadbed is not specified on the plans. This Section covers the additional work above that required for regular earthwork construction specified under Section 210. Improved Roadbed shall require the top layer, or layers, of the graded earth of both cuts and fills, with the upper surface at subgrade elevation, to be constructed of selected material from Unclassified Excavation or Borrow. Each layer of the plan designated thickness shall be processed and compacted as specified in Article 230.03. Modified Roadbed shall require that the existing top layer of the graded earth of both cuts and fills below subgrade elevation be processed and compacted as specified in Article 230.03. This procedure is to establish a proper subgrade before constructing an overlying layer.
230.04 Method of Measurement.
Measurement and payment for the materials used in the construction of improved roadbed and modified roadbed will be at the contract unit price for unclassified or Borrow Excavation as provided in the contract. No separate measurement will be made for reshaping of a roadbed constructed under a previous contract, such being considered incidental to the work covered by this Section; however, any additional material required to restore the roadbed to the typical section will be measured and paid for under the appropriate item of material ordered used.
a.Item 230-A. Measurement for the item of Roadbed Processing (which is the additional processing over and above that normally required by Section 210) will be in 100 foot {100 m} roadbed stations for each layer processed. The length of roadbed stationing will be in 100 foot {100 m} stations and fractions thereof to the nearest foot {meter} of any main roadbed in accordance with the following: on each roadbed separately for divided highways having more than one roadbed; on each half of a roadbed of a four lane facility constructed with a positive divider between opposing traffic; on ramps; on frontage, connecting, and crossing roads; and on widening work each roadbed as defined above whether widening is on one side or both sides. No measurement will be made for increased widths, lanes, turnouts, spurs, or crossovers when shown on the plans or for variations in widths due to changes in slopes. For additional areas over those shown on the plans, measurement will be allowed in the ratio of the increase in width to the standard width shown on the plans. The total measurement shall be the sum of the lengths measured along the center of the main roadbed or along each separate roadbed of divided highways, plus the measured ramps from where the ramp centerline crosses the edge of shoulders, plus (if any) the lengths of crossroads, connecting roads, and frontage roads. The length of modified roadbed or improved roadbed constructed under a previous contract and actually reprocessed will be measured for payment. Source: 2026 Standard Specifications for Highway Construction, 2026 Edition. Pages 149–152 of 826.