718.05 Submittal of Designs and Details.
Working drawings, including foundation details for sign structures when required, shall be submitted in accordance with Subarticle 105.02(c) “Working Drawings”. The details shall include fabrication requirements such as the welding requirements for sign frames and tensioning and detensioning procedures for prestressed concrete poles. The design computations shall address all members, connections (welds, bolts, etc.), anchor bolts, and foundations. The designer shall note on the design computations where the design of each member meets the design requirements and deflection tolerances. Design computations shall include all formulas used and a copy of all calculations for each structure that cover all members, connections (welds, etc.), footings and details necessary for a complete structure design. Where computer generated designs are used, the information shall include the applied loadings, structure geometry, effective wind area and location of attachments (sign panels, signals and light fixtures), component sizes, moments, shears, reactions, component forces, component stresses, allowable component stresses, combined stress ratios, and deflections for each group loading specified in the AASHTO Sign Specifications. VEHICULAR IMPACT ATTENUATOR ASSEMBLY
720.01 Description.
This Section shall cover the work of furnishing and installing vehicular impact attenuator assemblies of the design shown in the detailed plans at the locations designated by the plans, the proposals or directed.
720.02 Materials.
Materials furnished for use in the manufacture of the assemblies shall comply with the requirements noted in the detailed plans. Materials used in the actual installation of the attenuation in the work shall comply with appropriate provisions of these specifications.
720.03 Construction Requirements.
Any installation which is to be performed under traffic shall be provided with adequate warning and protective devices until such time as the assembly becomes usable. Once work begins, it shall be prosecuted diligently and continuously until the assembly is completely installed.
720.04 Method of Measurement.
Vehicular impact attenuators of the design designated by the plans or proposal will be measured in assembly installations, complete in place at the designated locations.
720.05 Basis of Payment.
726.01 Description.
This Section shall cover the work of furnishing and installing a portable concrete safety barrier and impact attenuators at the locations shown on the plans, designated in the proposal or directed, along with the satisfactory removal thereof, if so directed. This Section shall also cover the work of picking up State furnished portable concrete barrier units at a designated State storage yard, their installation at the designated location shown on the plans, and the returning of the units to the State storage yard. Portable Safety Barriers shall be classified as to "Type" which will designate the size, shape, height, etc., all in accordance with details shown in the plans. Unless specified otherwise, the type shall be optional, but once a type is selected it shall be used throughout the contract, unless otherwise approved by the Engineer. Portable Impact Attenuators shall be in accordance with details shown in the plans.
726.02 Materials.
All materials furnished for use shall conform to the appropriate requirements of Division 800, Materials, the details shown on the plans and the following:
726.03 Construction Requirements.
726.04 Method of Measurement.
The Portable Concrete Safety Barriers of the type designated will be measured in linear feet {meters} to the nearest 0.1 feet {0.1 m} along the top surface of the barrier. The Portable Impact Attenuators will be measured per each in accordance with the plan details for one complete attenuator and its accessories. State Furnished Portable Impact Attenuators will be measured per each.