22 FINISHING ROADWAY
22-1.01 General
Perform finishing activities after completing al l other construction activities.
22-1.02 Materials
Not Used
22-1.03 Construction
Trim and shape graded areas without surfacing to smooth and uniform cross sections and slopes:
1.Between edge of shoulder and hinge point of slopes
2.At medians For a graded roadbed without surfacing or pavement, trim and shape the entire roadbed to uniform cross sections and slopes. Trim slopes of gutters without lining or surfacing to the required grade and cross section. Do not stockpile material on finished pavement or allow material to drift across pavement. Clean finished pavement of dirt and foreign material. Clear debris and obstructions from ditches and channels constructed under the Contract. Clean out sewers, culverts, and other drainage facilities and appurte nant structures constructed under the Contract. Remove debris and excess material adjacent to culverts, headwalls and endwalls, bridge ends, poles, posts, trees, or other objects and leave in a neat and orderly condition. Remove from slopes any exposed mat erial that might become loose such as rocks and roots. Remove loose rock larger than 2 -1/2 inches in maximum dimension from:
1.Between the edge of shoulder and hinge point of slopes
2.Medians
3.Finished roadbed Dispose of material resulting from finish ing activities. If authorized, soil and rock resulting from finishing activities may be used along the roadway.
22-1.04 Payment
Not Used