B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Division I — General Provisions

6CONTROL OF MATERIALS

CA · 2024 Standard SpecificationsBook pages 7380View official source ↗

6 CONTROL OF MATERIALS

6-1 General

6-1.01 General

Section 6 includes specifications related to the control of materials . Store materials and samples in a way that preserves the quality and facilitates prompt inspection. Material incorporated into the work must be new . Before the preconstruction conference, submit mate rial source information on a Notice of Materials to be Used form.

6-1.02 Department -Furnished Materials

Request Department -furnished materials except sign panels at least 15 days before their scheduled installation. Request sign panels at least 30 days before their scheduled installation. If the Department furnishes the material:

1.At the job site, unload and store the material
2.At a location other than t he job site, deliver the material to the job site and store it The Engineer orders the return and disposal of surplus Department -furnished material. This returning and disposing of material is change order work. You are responsible for the cost of replacing lost or damaged Department -furnished material. The Department deducts replacement costs. Department -furnished material not used in the work remains the property of the Department.

6-1.03 Local Materials

6-1.03A General

Local material must be rock, sand, gravel, earth, or mineral material other than local borrow, or selected material obtained or produced from a source in the work vicinity, specifically for use on the project. Local borrow must not be a material from an esta blished commercial source. Upon your request, the Department tests material for quality characteristics from an untested local source. If satisfactory material from that source is used in the work, the Department does not charge you for the tests; otherwise, the Department deducts the test costs.

6-1.03B Submittal s

Reserved

6-1.04 Buy America

6-1.04A General

Reserved

6-1.04B Crumb Rubber (Pub Res Code § 42703(d))

Furnish crumb rubber with a certificate of compliance. Crumb rubber must be:

1.Produced in the United States
2.Derived from waste tires taken from vehicles owned and operated in the United States

6-1.04C Steel and Iron Materials

Steel and iron materials must be melted and manufactured in the United States except:

1.Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic production of the steel and iron materials
2.If the total combined cost of the materials does not exceed the greater of 0.1 percent of the total bid or $2,500, materials produced outside the United States may be used if authori zed SECTION 6 CONTROL OF MATERIALS Furnish steel and iron materials to be incorporated into the work with certificates of compliance and certified mill test reports. Mill test reports must indicate where the steel and iron were melted and manufactured. All melting and manufacturing pro cesses for these materials, including an application of a coating, must occur in the United States. Coating includes all processes that protect or enhance the value of the material to which the coating is applied.

6-1.05 Specific Brand Or Trade Name and S Ubstitution

A reference to a specific brand or trade name establishes a quality standard and is not intended to limit competition. You may use a product that is equal to or better than the specified brand or trade name if authorized. Submit a substitution request with a time period that:

1.Follows Contract award
2.Allows 30 days for review
3.Causes no delay Include substantiating data with the substitution request that proves that substitution:
1.Causes no delay
2.Is of equal or better quality and suitability

6-1.06 Buy Clean California Act

6-1.06A Summary

For projects with a total bid over $1 million and 175 or more original working days, the materials or products shown in the following table are subject to the Buy Clean Calif ornia Act (Pub Cont Code § 3500 et seq. ): Material or product Material specifications Carbon steel rebara Section 52 -1.02B, "Bar Reinforcement" and Section 99, "Building Construction." Includes uncoated or ungalvanized bar reinforcement used in epoxy -coated or galvanized reinforcement application s. Structural steelb Section 55 -1.02D(1), "General," – Structural Steel and Other Materials tables , Section 56 -2.02B(1), "General," Section 56 - 2.02F, "P ipe Posts," and Section 99, "Building Construction." For hot -rolled, plate or hollow materials. Flat glassc Section 99, "Building Construction" Mineral wool board insulationd Section 99, "Building Construction" aFor each mill providing 20,000 pounds or more on the project . bFor each mill providing 5,000 pounds or more on the project . cFor each manufacturer providing 2,000 square feet or more on the project . dFor each manufacturer providing 4,000 square feet or more on the project . An informal -bid contract is not subject to Buy Clean California Act requirements. For carbon steel rebar and structural steel materials subject to Buy Clean California Act, the source mill s must be on the Authorized Material List s for Buy Clean California Act compliant steel mills. Identify source mills on Notice of Materials to be Used form submittals. For flat glass and mineral wool board insulation subject to Buy Clean California Act, submit an environmental product declaration for each applicable material or product at least 15 days before the scheduled installation. The global warming potential of each applicable material or product as evidenced by its environmental product declaration must not exceed the maximum acceptable global warming potential values established by the Department of General Services. Do not install the applicable material or product until the submittal has been authorized. The maximum acceptable global warming potential for each category of material or product is published on the Depar tment of General Services website at: SECTION 6 CONTROL OF MATERIALS https://www.dgs.ca.gov / For product category rules for flat glass or mineral wool board insulation , go to the METS website. Use the product category rule in effect on the date of bid opening unless otherwise authorize d. An environmental product declaration for flat glass or mineral wool board is not required for either of the following conditions:

1.Applicable product category rule has expired without replacement as of the bid opening date.
2.Applicable product categ ory rule was issued less than 100 days before the bid opening date. Upon each jobsite shipment receipt of materials or products subject to these Buy Clean California Act requirements, report the represented quantity information using the Department’s Data Interchange for Materials Engineering.

6-1.06B Definitions

environmental product declaration : Independently verified document created and verified under International Organization for Standardization (ISO) 14025 for Type III environmental declarations that identifies the global warming potential emissions of the facility -specific material or product through a product stage life cycle assessment . product category rule: Program operator established rule based on the science of life cycle assessment that gov erns the development of the environmental product declaration for the material or product. product stage: Boundary of the environmental product declaration that includes (1) raw material supply,

2.transportation processes, and (3) processing operations, including operations such as melting, mixing, milling, finishing, curing, cooling, trimming, packaging and loading for transport delivery. Commonly referred to as a "cradle -to-gate" life cycle assessment. program operator: Independent agency that supervise s and confirms the full environmental product declaration development process under ISO 14025. raw material supply: Upstream processes which can include allocations, extraction, refinement, reclamation, handling , and processing of the constituents used in producing the material or product. transportation processes: Includes transportation of raw, reclaimed or recycled material constituents from the supplier to the gate of the manufacturer, producer or fabricator. Includes transport of related waste products.

6-1.06C Submittals

You must register on the Department’s Data Interchange for Materials Engineering at least 15 days before submitting either of the following:

1.Represented quantity information for materials or products subject to Buy Clean California Act
2.Environmental product declarations for flat glass o r mineral wool board insulation Follow the registration process at: https://dime.dot.ca.gov / Submit environmental product declarations for flat glass and mineral wool board insulation to the Department’s Data Interchange for Materials Engineering and pro vide PDF copies to the Engineer. Submit certified mill test reports upon delivery of carbon steel rebar and structural steel materials to the project documenting their compliance. Fabricators of items containing carbon steel rebar or structural steel mater ials must have the certified mill test reports available for Department inspection prior to beginning fabrication. Do not incorporate these materials and products into the work until compliant documentation has been provided to the Engineer. For each material or product subject to Buy Clean California Act requirements, complete the represented quantity information on the Department’s Data Interchange for Materials Engineering within 5 business days of shipment receipt at the project site. SECTION 6 CONTROL OF MATERIALS Imme diately notify the Engineer if a program operator has determined their product category rule does not allow for development of a facility -specific environmental product declaration for flat glass or mineral wool board insulation . Include written correspond ence from the program operator. If the Engineer determines the development of a facility -specific environmental product declaration for flat glass or mineral wool board insulation cannot be achieved, an environmental product declaration will not be require d for that material or product .

6-1.06D Quality Assurance

Reserved

6-1.07 Prohibitions On Materials, Equipment, and Services

6-1.07A General

Reserved

6-1.07B Telecommunications and Video Surveillance Equipment or Services

Do not enter into, extend, or renew a contract to procure or obtain telecommunications and video surveillance equipment or services as described in 2 CFR 200.216 and 2 CFR 200.471. Furnish telecommunications and video surveillance equipment with a certificate of compliance. The certifi cate must state telecommunications and video surveillance equipment was not procured or obtained from manufacturers identified in section 889 of the National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115 -232).

6-1.07C 6-1.07G Reserved

6-2 Quality Assurance

6-2.01 General

6-2.01A General

Quality assurance includes all activities used to (1) provide an overall level of quality for the project and

2.determine compliance with the Contract documents. Quality control includes sampling, testing, and inspections performed under your QC program to (1) control material quality and (2) ensure the specified quality characteristics for the project are met. Department acceptance includes sam pling, testing, and inspections performed by the Department to verify compliance with the Contract. The Department's independent assurance program is described in the Department's Independent Assurance Manual: Procedures for Accreditation of Laboratories a nd Qualification of Testers . For the manual, go to the METS website. For a material specified to comply with a State Specification number, the material may comply with a later version of the specification. Obtain State Specifica tions from METS. For a material specified to comply with a requirement for a quality characteristic shown in the following table, the quality characteristic is tested under the corresponding California Test : California Tests Quality characteristic California Test Relative compaction 216 or 231 Sand equivalent 217 Resistance (R -value) 301 Gradation (sieve analysis) 202 Durability index 229

6-2.01B Authorized Facility Audit Lists

Section 6 -2.01B applies where a facility is specified to be on an Authorized Facility Audit List . SECTION 6 CONTROL OF MATERIALS An audit authorized by the Department not more than 3 years before completion of the fabrication process is acceptable if the Departmen t determines the audit was for the same type of work to be performed. For procedures to be included on an Authorized Facility Audit List, go to the Authorized Facility Audit List website .

6-2.01C Authorized Material Lists

Section 6 -2.01C applies where a m aterial is specified to be on an Authorized Material List . The material must be on an Authorized Material List before it is incorporated into the work. For procedures to be included on an Authorized Material List, go to the Authorized Material List website .

6-2.01D Authorized Material Source Lists

Section 6 -2.01D applies where a material is specified to be on an Authorized Material Source List . The material source must be on an Author ized Material Source List before the item from the source is incorporated into the work. For procedures to be included on an Authorized Material Source List, go to the Authorized Material Source List website .

6-2.01E Material Source Inspection and Testing

Section 6 -2.01E applies if a material is to be inspected or tested at the source . Submit an inspection request form:

1.At least 3 business days before the reque sted inspection date for a material source within California.
2.At least 5 business days before the requested inspection date for a material source outside California but within the United States.
3.50 days before the planned production start for a material source outside the United States. Notify the Engineer at least 20 days before the actual start. For the inspection request form and the procedure for its submittal, go to the METS website . Notify the Engineer of each submittal. For each item show n in the following table, the Department deducts the corresponding amount shown : SECTION 6 CONTROL OF MATERIALS Source Inspection Expense Deductions Item Distancea Deduction Steel pipe piling Prestressing system Tier 1 and tier 2 precast concrete members Epoxy -coated reinforcement Structural steel for sign structures Miscellaneous metal > 300 $5,000 > 3,000 $8,000 Extinguishable message signs Variable message signs Changeable message signs Service equipment enclosures Telephone demarcation cabinets Closed circuit television cabinets Weigh -in-motion cabinets Highway advisory radio cabinets > 300 $2,000 Poles for electrical systems > 300 $1,000 for ≤ 10 poles and $1,000 for every multiple of 10 poles thereafter Structural steel > 300 The greater of:
1.$5,000
2.$0.02/lb > 3,000 The greater of:
1.$8,000
2.$0.036/lb Structural steel paint > 300 The greater of:
1.$2,000
2.$0.01/sq ft > 3,000 The greater of:
1.$5,000
2.$0.015/sq ft Check samples > 300 $2,000 High mast poles > 300 $2,500 > 3,000 $5,000 PTFE bearings, ≤ 2 lots > 300 $5,000 > 3,000 $15,000 PTFE bearings, > 2 lots > 300 $10,000 > 3,000 $20,000 aDistance is air -line miles from both Sacramento and Los Angeles to the inspection source.

6-2.01F Test Samples

Section 6 -2.01F applies where a test sample is specified or if a test sample is requested. Notify the Engineer 10 days before taking a sample. Submit material to be tested with a Sample Identification Card. For the card, go to the METS website . Restore work immediately after sampling. If requested, obtain the Department's authorization for the material before incorporating the material represented by the test sample into the work.

6-2.01G 6-2.01K Reserved

6-2.02 Quality Control

6-2.02A General

Material production and testing equipment must measure accurately and precisely. SECTION 6 CONTROL OF MATERIALS

6-2.02B Quality Control Program

Develop, implement, and maintain a QC program. Prepare and maintain QC records, including:

1.Names and qualifications of: 1.1. Samplers 1.2. Testers 1.3. Inspectors
2.Testing laboratories' identification and certifications
3.Testing equipment calibrations and certifications
4.Inspection reports
5.Sampling an d testing records organized by date and type of material
6.Test results with comparison of quality characteristic requirements
7.Test results in relation to action and any suspension limits
8.Records of corrective actions and suspensions Within 24 hour s, notify the Engineer of any noncompliance identified by your QC program. Allow the Department access to all QC records. Submit QC test data and QC test results within 2 business days of test completion.

6-2.02C Quality Control Manager

The QC manager must be responsible directly to you for the quality of the work, including materials and workmanship performed by you and your subcontractors. Assign the QC manager before the start of the affe cted work. The QC manager must be the sole individual responsible for:

1.Receiving, reviewing, and approving all correspondence, submittals, and reports before they are submitted to the Department
2.Signing the QC plan
3.Implementing the QC plan
4.Main taining the QC records The QC manager must be your employee or must be hired by a subcontractor providing only QC services. The QC manager must not be employed or compensated by a subcontractor or by other persons or entities hired by subcontractors who w ill provide other services or materials for the project. Notify the Engineer of the name and contact information of the QC manager.

6-2.02D Quality Control Plans

Submit 7 copies of each authorized QC plan. Make 1 copy available at each location where work is performed.

6-2.03 Department Acceptance

6-2.03A General

The Department may use multiple acceptance methods for a material. Specifications in sections titled "Department Acceptance" do not include all requirements on which the Department makes its acc eptance. The Department may inspect, sample, and test materials for compliance with the Contract at any time. Allow the Department to record, including photograph and video, to ensure a material is produced to comply with the Contract. You may examine the records and reports of tests the Department performs. SECTION 6 CONTROL OF MATERIALS Schedule work to allow time for the Department's inspection, sampling, and testing. The Department deducts testing costs for work that does not comply with the Contract. The Department may retest materi al previously tested and authorized for use . If the Department notifies you of a retest, furnish resources for retesting.

6-2.03B Job Site Inspection and Testing

Section 6 -2.03B applies if a material is to be inspected or tested at the job site. The material must be authorized for use before it is incorporated into the work.

6-2.03C Certificates of Compliance

Section 6 -2.03C applies (1) where a certificate of compliance is specified or (2) if any material is produced outside the United States. Submit a certificate of compliance:

1.Before the material is incorporated into the work .
2.For each lot of the material. Identify the lot on the certificate .
3.Signed by the producer of the material and stating that the material complies with the Contract .
Source: California Standard Specifications, 2024 Edition. Pages 7380 of 1,372.