202Random Clearing and Grubbing Section 202

GA · 2021 Standard SpecificationsBook pages View official source ↗
SECTION 202 — Random Clearing and Grubbing

202.1General Description

This work includes clearing and grubbing borrow and material pits. See Subsection 107.23. It also includes such ditch inlets, outlets, channel changes, and easement areas where clearing and grubbing are required but not shown on the plans. 202.1.01 Definitions General Provisions 101 through 150. 202.1.02 Related References A.Standard Specifications

SECTION 107 — Legal Regulations and Responsibility to the Public
SECTION 201 — Clearing and Grubbing Right- of-Way

B.Referenced Documents General Provisions 101 through 150. 202.1.03 Submittals General Provisions 101 through 150.

202.2Materials

General Provisions 101 through 150. 202.2.01 Delivery, Storage, and Handling General Provisions 101 through 150.

202.3Construction Requirements

202.3.01 Personnel General Provisions 101 through 150. 202.3.02 Equipment General Provisions 101 through 150. 202.3.03 Preparation General Provisions 101 through 150. 202.3.04 Fabrication General Provisions 101 through 150. 202.3.05 Construction Perform the work according to Section 201. 202.3.06 Quality Acceptance General Provisions 101 through 150. 187 187 187 187 187 187 187 187 187 187

SECTION 202 — Random Clearing and Grubbing

202.3.07 Contractor Warranty and Maintenance General Provisions 101 through 150.

202.4Measurement

The area of completed and accepted clearing and grubbing is measured in acres (hectares). Only the area cleared and grubbed as shown on the Plans or as designated by the Engineer is measured. The Department will make no separate payment for removing grass, weeds, debris, small underbrush, other vegetation from cultivated lands, and isolated trees or stumps. Include the cost for removing these items in the price bid for other Pay Items. 202.4.01 Limits General Provisions 101 through 150.

202.5Payment

The Department will pay for Clearing and Grubbing and Clearing at the Contract Unit Price per acre (hectare), which is full compensation for all work specified. Payment will be made under: Item No. 202 Clearing and grubbing Per acre (hectare) Item No. 202 Clearing Per acre (hectare) 202.5.01 Adjustments General Provisions 101 through 150.

188 188 188 188 188 188 188 188 188 188

Source: Georgia Standard Specifications Construction of Transportation Systems, 2021 Edition. Pages of 2,050.