515.1 General Description
This work consists of placing handrail and posts made of ferrous metal pipe. It shall include setting anchorages, preparing bearing areas, and painting or galvanizing the handrail, whichever the plans require.
515.1.01 Definitions
General Provisions 101 through 150.
515.1.02 Related References
A. Standard Specifications Section 500—Concrete Structures Section 501—Steel Structures Section 535—Painting Structures Section 645—Repair of Galvanized Coatings B. Referenced Documents ASTM A 123/A 123 M ASTM A 153/A 153 M
515.1.03 Submittals
General Provisions 101 through 150.
515.2 Materials
All materials shall meet the requirements of the following specifications. Material Section Structural Steel 851 Malleable Iron Castings 854.2.04 Steel Castings 854.2.05 Steel Pipe 847.2.01 Steel Bolts, Nuts, and Washers 852.2.01 Paint 870 Plain Steel Bars—Threaded Ends 852.2.02
515.2.01 Delivery, Storage, and Handling
Handle the rails and posts carefully to minimize damage to shop paint or galvanizing.
515.3 Construction Requirements
515.3.01 Personnel
General Provisions 101 through 150.
515.3.02 Equipment
General Provisions 101 through 150.
515.3.03 Preparation
General Provisions 101 through 150.
515.3.04 Fabrication
General Provisions 101 through 150.
515.3.05 Construction
A. Fabricate Handrail Fabricate handrail as follows. All fabrications shall meet the applicable Specifications of Subsections 501.3.04.H and 501.3.06.C, Welded Construction. 1. Fabrication Material. Fabricate handrail from plates, shapes, bars, pipe, castings, or from combinations of these materials as shown on the plan details. 2. Handrail Not Supported on Concrete Parapets. When erected bridge handrail will not be supported on a concrete parapet, fabricate the handrail so posts will be plumb. 3. Stairways on Grades. On handrail for stairways on grades, use adjustable malleable iron fittings where required or weld the handrails to the posts when specified on the Plans. 4. Welding Requirements. Welding shall meet the requirements of Subsections 501.3.04.H and 501.3.06.C, Welded Construction. Grind smooth all welds except fillet welds. Do not grind fillet welds; leave them as they are. 5. Galvanizing. Before galvanizing, complete all cutting, welding, and fabrication of rails, posts, bolts, set screws, and other components. Galvanize material according to the following standards: Material Standard All material except hardware ASTM A 123/A 123M Hardware ASTM A 153/A 153M 6. Shop Painting. If metal or pipe handrail, posts, and their component parts will not be galvanized, paint them with the type of shop paint required on the Plans. All painting shall meet the requirements of Section 535. B. Construct Handrails Construction shall meet the applicable specifications of Subsections 501.3.04.H and 501.3.06.C, Welded Construction. Construct handrail according to the Plan details and as follows: 1. Set Anchor Bolts. Set anchor bolts using these guidelines: • Set the anchor bolts according to the Plan details and ensure that the bolts have the correct spacing and projection. Projections shown on the Plans are for flat grades and assume no use of shims. • On other grades or where shims are needed, modify the projection shown on the plans so that after all shims, pads, posts, and washers have been placed, the anchor bolt nut can be screwed completely onto the anchor bolt. • If the projection is too short, lengthen or replace the bolt (at the Contractor’s expense) as directed by the Engineer. 2. Prepare Bearing Areas. Before placing the posts, prepare bearing areas using these guidelines to obtain full contact between the posts or shims and the concrete: • Remove all concrete protrusions. • Fill all depressions. • Ensure that bearing areas for posts are true to grade. • Finish concrete with the Type IV—Floated Surface Finish specified in Subsection 500.3.05.AB.5, Type IV—Floated Surface Finish. 3. Erect Handrail. Erect handrail using these guidelines: • Make all rails parallel to grade. • Where bridge rail will be supported on a concrete parapet, set handrail posts normal to grade. • Set other handrail posts and pipe standards plumb. If necessary, use shims under post bases and floor flanges to achieve plumb posts. • Tighten the set screws as detailed on the plans. • Tighten anchor bolt nuts to a snug fit with full bearing on the base of the post. • When posts and rails are completely bolted into place, ensure that they are true to line and grade. 4. Paint Handrail in the Field. Painting shall meet the Specifications of Section 535. If metal or pipe handrail, posts, and their component parts are not galvanized, paint them with the type of paint and number of coats required on the plans. 5. Repair Galvanized Coating. Repair damaged galvanized coatings (at the Contractor’s expense) according to Section 645.
515.3.06 Quality Acceptance
General Provisions 101 through 150.
515.3.07 Contractor Warranty and Maintenance
General Provisions 101 through 150.
515.4 Measurement
This work will be measured for payment in linear feet (meters) of accepted handrail. Handrail will be measured along the top rail from out-to-out of the ends of metal rail or from out-to-out of metal end posts, whichever is greater. No deductions will be made for openings at deck expansion joints or at light standards.
515.4.01 Limits
General Provisions 101 through 150.
515.5 Payment
This work will be paid for at the Contract Price per linear foot (meter) for metal or pipe handrail complete in place. Payment will be made under: Item No. 515 Ferrous Metal Handrail, Type Per linear foot (meter) Item No. 515 Galvanized Steel Pipe Handrail:_____ in. (mm) (Type) Per linear foot (meter) Item No. 515 Black Steel Pipe Handrail_____ in. (mm) (Type) Per linear foot (meter)
515.5.01 Adjustments
General Provisions 101 through 150.
Get an email when 515 changes