Division 700 — Roadside Development

712Fiberglass Blanket

GA · 2021 Standard Specifications✓ Full text on BuildSpecBook pages 1398–1400 Save this section

Ask about Section 712

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

712.1 General Description

This work includes furnishing and placing fiberglass blankets over previously prepared and grassed areas according to the plans or as directed by the Engineer.

712.1.01 Definitions

General Provisions 101 through 150.

712.1.02 Related References

A. Standard Specifications Section 106—Control of Materials Section 700—Grassing Section 822—Emulsified Asphalt B. Referenced Documents General Provisions 101 through 150.

712.1.03 Submittals

Submit certification according to Subsection 106.05 stating that materials conform to the requirements of this Section.

712.2 Materials

A. Fiberglass Mat or Blanket Fiberglass mat is a machine-produced blanket consisting of a uniform layer of continuous, randomly oriented glass fiber strands. Use a mat that is at least 48 in. (1.2 m) wide and weighs the following: • At least 0.2 lbs./yd² (105 g/m²) when used on slopes • At least 0.4 lbs./yd² (215 g/m²) when used in waterways B. Anchoring Staples Use staples made of cold-drawn wire no smaller than 14 gauge (2 mm) in diameter, formed into a U shape with 6 in. (150 mm) long legs and a 1 in. (25 mm) wide crown. C. Asphalt Use asphalt emulsion for tying down the blanket that is grade SS-1h or SS1, conforming to Section 822.

712.2.01 Delivery, Storage, and Handling

General Provisions 101 through 150.

712.3 Construction Requirements

712.3.01 Personnel

General Provisions 101 through 150.

712.3.02 Equipment

General Provisions 101 through 150.

712.3.03 Preparation

Before placing the fiberglass mat, complete grassing, smooth the area, and clear it of stones, lumps, roots, or other material that would prevent the mat from laying snugly on the underlying soil.

712.3.04 Fabrication

General Provisions 101 through 150.

712.3.05 Construction

A. Placing Mat Place the fiberglass mat or blanket within 24 hours after the area has been planted but before any rain or watering. Place the mat as follows: 1. Dig a 9 in. (225 mm) deep anchor slot across the upgrade end of the site. 2. Place the initial 12 in. (300 mm) of blanket in the anchor slot. 3. Backfill and solidly tamp the slot. 4. Unroll the blanket in the direction of water flow, keeping the blanket in contact with the soil over the entire area. 5. Overlap adjacent strips at least 2 in. (50 mm). Overlap adjoining ends at least 6 in. (150 mm) with the upstream section on top. B. Stapling Drive staples vertically into the ground approximately 1 yd (1 m) apart on each side of the blanket. Drive one row in the center alternately spaced between each side staple. Place the edge staples in the 2 in. (50 mm) overlap. At the end of each mat, place staples in a row spaced approximately 12 in. (300 mm) apart. C. Steep Slopes The Engineer may specify additional staples or check slots in waterways where slopes are steep or large water volumes or velocities are anticipated. D. Asphalt Emulsion The Contractor may apply an asphalt emulsion instead of staples to anchor the blanket. Apply the bituminous material uniformly over the mat at approximately the following rates: • 0.12 gal to 0.15 gal/yd² (0.5 L to 0.7 L/m²) for slopes • 0.24gal to 0.30 gal/yd² (1 L to 1.4 L/m²) or waterways After the emulsified asphalt has broken and becomes tacky, apply a light layer of sand or pulverized soil to the treated areas, if directed by the Engineer. This application prevents the treated area from sticking to anything that contacts it. Do not apply sand or soil in quantities that would damage the newly planted areas.

712.3.06 Quality Acceptance

General Provisions 101 through 150.

712.3.07 Contractor Warranty and Maintenance

Maintain treated areas to the Engineer’s satisfaction until Final Acceptance.

712.4 Measurement

The quantity of fiberglass blanket being paid for is the number of square yards (meters), surface measured, completed and accepted. The 2 in (50 mm) side laps and the blanket in the anchor slot are not included in the measurement but are considered incidental to the work. Treated slopes and treated waterways are measured separately.

712.4.01 Limits

General Provisions 101 through 150.

712.5 Payment

This work will be paid for at the Contract Price per square yard (meter) for fiberglass blanket, complete in place and accepted. Payment is full compensation for furnishing and installing the blanket according to this specification and maintaining the blanket. Preparing the area and grassing will be paid for according to Section 700. Payment will be made under: Item No. 712 Fiberglass blanket, (slopes) Per square yard (meter) Item No. 712 Fiberglass blanket, (waterways) Per square yard (meter)

712.5.01 Adjustments

General Provisions 101 through 150.

Get an email when 712 changes

Georgia revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Construction of Transportation Systems, 2021 Edition. Pages 1398–1400 of 2,050. View official source ↗