700.1General Description
This work includes preparing the ground, furnishing, planting, seeding, fertilizing, sodding, and mulching disturbed areas within the Right-of-Way limits and easement areas adjacent to the right-of-way as shown on the plans except as designated by the Engineer to remain natural. 700.1.01 Definitions General Provisions 101 through 150. 700.1.02 Related References
Section 163—Miscellaneous Erosion Control Items Section 718—Wood Fiber Section 822—Emulsified Asphalt Section 882—Lime Section 890—Seed and Sod Section 891—Fertilizers Section 893—Miscellaneous Planting Materials Section 895—Polyacrylamide
QPL 33 QPL 84 700.1.03 Submittals Submit manufacturer’s product expiration date along with written instructions to ensure proper application, safety, storage, and handling of Polyacrylamide products used in the work.
700.2Materials
Use materials that meet the requirements of the following specifications: Material Section Wood Fiber Mulch 718.2 Agricultural Lime 882.2.01 Seed 890.2.01 Sod 890.2.02 Fertilizer 891.2.01 Plant Topsoil 893.2.01 Mulch 893.2.02 Inoculants 893.2.04 1338 1338 1338 1338
Material Section Tackifiers QPL 33 Anionic Polyacrylamide QPL 84 & Section 895
Whenever seeds are specified by their common names, use the strains indicated by their botanical names.
Obtain the water for grassing from an approved source. Use water free of harmful chemicals, acids, alkalies, and other substances that may harm plant growth or emit odors. Do not use salt or brackish water.
Agricultural lime rates will be based on a laboratory soil test report. The Contractor is responsible for ensuring the tests are performed by an approved laboratory. Provide a copy of test results to the Engineer. Refer to Section 882 Lime and GSP 18 of the Sampling and Testing Inspection manual for additional information on rates, use, handling and sampling procedures.
Fertilizer analysis and rates will be based on a laboratory soil test report. The Contractor is responsible for ensuring the tests are performed by an approved laboratory. Provide a copy of test results to the Engineer. Refer to Section 891 Fertilizer and GSP 18 of the Sampling and Testing Inspection manual for additional information on rates, use, handling and sampling procedures.
Use straw or hay mulch according to Subsection 700.3.05.G. Use wood fiber mulch in hydroseeding according to Subsection 700.3.05.F.1. 700.2.01 Delivery, Storage, and Handling General Provisions 101 through 150.
700.3Construction Requirements
700.3.01 Personnel General Provisions 101 through 150. 700.3.02 Equipment Use grassing equipmentable to produce the required results. Never allow the grading (height of cut) to exceed the grassing equipment’s operating range.
Use mulching equipment that uniformly cuts the specified materials into the soil to the required control depth.
For hydroseeding equipment, see Subsection 700.3.05.F. 700.3.03 Preparation General Provisions 101 through 150. 700.3.04 Fabrication General Provisions 101 through 150. 1339 1339 1339 1339
700.3.05 Construction Follow the planting zones, planting dates, types of seed, seed mixtures, and application rates described throughout this Section. The Engineer has the authority to alter the planting dates as set forth by a period of 2 weeks. This 2-week period may be applied to either the beginning of the specified planting and/or to the end of the end of the specified planting season. In general: • Obtain the Engineer’s approval before changing the ground cover type. • Do not use annual rye grass seeds with permanent grassing. • Follow the planting zones indicated on the Georgia State Planting Zone Map, below. • Sod may be installed throughout the year, weather permitting. • For permanent grassing, apply the combined amounts of all seeds for each time period within each planting zone and roadway location listed in the Seeding Table, below. Do not exceed the amounts of specified seed. 1340 1340 1340 1340
1341 1341 1341 1341
NON-NATIVE GRASS SEEDING TABLE 1 (Temporary and Permanent Seed Types for Shoulders, Medians and Slopes 3:1 or Flatter) Common Name Botanical Name Class/Type Rate/Acre Planting Zone Planting Dates Common Bermuda Grass (Hulled) Cynodon dactylon Required Permanent Grass 10 (11) 1 April 16 – August 31 Common Bermuda Grass (Unhulled) 10 (11) Common Bermuda Grass (Hulled) Cynodon dactylon Required Permanent Grass 10 (11) 2,3,4 April 1 – October Common Bermuda Grass (Unhulled) 10 (11) Bahaia Grass Paspalum motatum 10 (11) Rye Grass, Millet, Cereal Grass (Oats) Lolium penne spsp. Multiflorum, Echinochloa cursgalli, Avena sativa Temporary Grass 50 (56) 1 September 1- April 15 Rye Grass, Millet, Cereal Grass (Oats) Lolium penne spsp. Multiflorum, Echinochloa cursgalli, Avena sativa Temporary Grass 50 (56) 2,3,4 October 16- March 31 1342 1342 1342 1342
NON-NATIVE SEEDING TABLE 2 (Temporary and Permanent Seed Types for back slopes, fill slopes and areas which will not be subject to frequent mowing, slopes steeper than 3:1) Common Name Botanical Name Class/Type Rate/Acre Planting Zone Planting Dates Interstate Lespedeza Lespedeza sericea Permanent Grass 50(56) 1,2 March 1 – August 31 Weeping Lovegrass Eragrostis curvula Temporary Grass 10(11) Interstate Lespedeza Lespedeza sericea Permanent Grass 75(84) 1,2 September 1- February 28 Tall Fescue Festuca arundinacea Temporary Grass 50(56) Interstate Lespedeza Lespedeza sericea Permanent Grass 50(56) 3,4 April 1 – October 31 Weeping Love Grass Eragrostis curvula Temporary Grass 10(11) Interstate Lespedeza Lespedeza sericea Permanent Grass 50(56) 3,4 November 1 – March 31 Weeping Love Grass Eragrostis curvula Temporary Grass 10(11) 1343 1343 1343 1343
NATIVE GRASS SEEDING TABLE 3 For Non-mowable Slopes or Areas Designated as Permanent Native Grass Plots. (Plant native seed mixes on back slopes, fill slopes and areas which will not be subject to frequent mowing (slopes steeper than 3:1). See plans heets/plant lists for detailed native restoration and riparian mitigation seed mix combinations to be applied at a minimum rate total of 10 (11) lbs. per acre (kg/hectare) for each combined mix. If the mix is not provided in the plan sheets, use a minimum of 3 species based on planting dates shown above. Common Name Botanical Name Class/Type Rate/Acre Planting Zone Planting Dates Canada Wild Rye Elymus canadensis Cool Season Minimum 2 (2) 1,2,3,4 October 31 - March 31 Virginia Wild Rye Elymus virginicus Cool Season Minimum 2 (2) 1,2,3,4 October 31 - March 31 Bottle-brush Grass Hystrix patula Cool Season Minimum 2 (2) 1,2,3,4 October 31 - March 31 Little Bluestem Schizachyrium scoparium (Andropogon scoparius) Warm Season Minimum 2 (2) 1,2,3,4 March31- August 31 Indiangrass Sorghastrum nutans Warm Season Minimum 2 (2) 1,2,3,4 March 31- August 31 Eastern Gama Grass Tripsacum dactyloides Warm Season Minimum 2 (2) 1,2,3,41,2,3,4 March 31- August 31 Rice Cut Grass Leersia oryzoides Warm Season Minimum 2 (2) 1,2,3,4 March 31- August 31 Deertongue Panicum clandestinum Warm Season Minimum 2 (2) 1,2,3,4 March 31- August 31 Switchgrass Panicum virgatum Warm Season Minimum 2 (2) 1,2,3,4 March 31- August 31 Woolgrass Scirpus cyperinus Cool Season Minimum 2 (2) 1,2,3,4 October 31 - March 31 River Oats Chasmanthium latifolium Cool Season Minimum 2 (2) 1,2,3,4 October 31 - March 31 Purple Top Tridens flavus Warm Season Minimum 2 (2) 1,2,3,4 March 31- August 31 1344 1344 1344 1344
HERBACEOUS PLANT SEEDING TABLE 4 (Approved for Riparian Mitigation or for Seed Mixes on Slopes Steeper than 3:1-Requiring Permanent Planting) Common name Botanical name Class/type Rate/Acre Planting Zone Planting Dates Joe Pye Weed Eupatorium fistulosum Herbaceous Perennial Minimum 2 (2) 1,2,3,4 September – May 1 Ironweed Vernonia novaboracensis Herbaceous Perennial Up to 10(11) 1,2,3,4 March 1 - August 31, White snakeroot Ageratina altissima (Eupatorium rugosum) Herbaceous Perennial Up to 10(11) 1,2,3,4 September – May 1 Swamp milkweed Asclepias incarnata Herbaceous Perennial Up to 10(11) 1,2,3,4 March 1 - August 31, Frost aster Aster pilosus (Symphyotrichum pilosum) Herbaceous Perennial Up to 10(11) 1,2,3,4 September – May 1 Partridge pea Chamaecrista fasciculata (Cassia fasciculata) Herbaceous Perennial Up to 10(11) 1,2,3,4 March 1 - August 31, Lance-leaf coreopsis Coreopsis lanceolata Herbaceous Perennial Up to 10(11) 1,2,3,4 September – May 1 Tall coreopsis Coreopteris tripteris Herbaceous Perennial Up to 10(11) 1,2,3,4 September – May 1 Boneset Eupatorium perfoliatum Herbaceous Perennial Up to 10(11) 1,2,3,4 September – May 1 Sneezeweed Helenium autumnale Herbaceous Perennial Up to 10(11) 1,2,3,4 September – May 1 Swamp sunflower Helianthus angustifolius Herbaceous Perennial Up to 10(11) 1,2,3,4 March 1 - August 31, Fringed loosestrife Lysimachia ciliata Herbaceous Perennial Up to 10(11) 1,2,3,4 September – May 1 1345 1345 1345 1345
For native restoration and riparian mitigation seed mix combinations, use Table 4 for approved native herbaceous seed types in combination with Table 3 of native grass seeds. Native restoration and riparian seed mixes should incorporate a mix of 60% native grass types (see Table 3) and 40% native herbaceous types (see Table 4) applied at a minimum rate total of 10 (11) lbs. per acre (kg/hectare) for each combined mix. TABLE 5: TEMPORARY GRASS - SPECIES, SEEDING RATES AND PLANTING DATES When stage construction or other conditions prevent completing a roadway section continuously, apply temporary grassing to control erosion. Temporary grassing is used to stabilize disturbed areas for more than sixty (60) calendar days. Temporary grass may be applied any time of the year, utilizing the appropriate seed species and application rate as shown in the chart above. Apply mulch to areas planted in temporary grass at the rate of ¾ inch to 1.5 inches. Do not place slope mats on areas planted in temporary grass. Wild bergamot Monarda fistulosa Herbaceous Perennial Up to 10(11) 1,2,3,4 September – May 1 Mountain mint Pycnanthemum tenuifolium Herbaceous Perennial Up to 10(11) 1,2,3,4 September – May 1 Black-eyed susan Rudbeckia hirta Herbaceous Perennial Up to 10(11) 1,2,3,4 September – May 1 Goldenrod Solidago nemoralis Herbaceous Perennial Up to 10(11) 1,2,3,4 September – May 1 Butterfly Weed Aesclepias tuberose Herbaceous Perennial Up to 10(11) 1,2,3,4 March 1 - August 31, Species Rates per 1000 sq. ft. Rates per Acre Planting Date By Zone 1 & 2 2 3 & 4 Rye (Grain) 3.9 lbs 168 lbs 8/1 - 11/30 8/15 - 12/1 9/1 - 2/28 Ryegrass 0.9 lbs 40 lbs 8/1 - 11/30 9/1 - 12/15 9/15 - 1/1 Rye & Annual Lespedeza 0.6 lbs 0.6 lbs 28 lbs 24 lbs 3/1 - 4/1 2/1 - 3/1 2/1 - 3/1 Weeping Lovegrass 0.1 lbs 4 lbs 3/15 - 6/15 3/15 - 7/15 3/15 - 7/15 Sudangrass 1.0 lbs 60 lbs 4/1 - 8/31 4/1 - 8/31 3/15 - 8/1 Browntop Millet 1.1 lbs 50 lbs 4/1 - 6/30 4/1 - 7/15 4/1 - 7/15 Wheat 3.9 lbs 168 lbs 9/1 - 12/31 9/1 - 12/31 9/15 - 1/31 1346 1346 1346 1346
Prepare the ground by plowing under any temporary grass areas and preparing the soil as follows:
On slopes 3:1 or flatter, plow shoulders and embankment slopes to between 4 in. and 6 in. (100 mm and
150 mm) deep.
Plow front and back slopes in cuts to no less than 6 in. (150 mm) deep. After plowing, thoroughly disk the area
until pulverized to the plowed depth.
Serrate slopes steeper than 3:1 according to plan details when required.
On embankment slopes and cut slopes not requiring serration (sufficient as determined by the Engineer),
prepare the ground to develop an adequate seed bed using any of the following methods as directed by
the Engineer:
• Plow to a depth whatever depth is practicable.
• Use a spiked chain.
• Walk with a cleated track dozer.
• Scarify.
Disking cut slopes and fill slopes is not required.
Remove boulders, stumps, large roots, large clods, and other objects that interfere with grassing or may
slide into the ditch.
Spread topsoil stockpiled during grading evenly over cut and fill slopes after preparing the ground.
Push topsoil from the top over serrated slopes. Do not operate equipment on the face of completed
serrated cuts.
Mitigation Areas.
For Permanent Grassing in native restoration areas, multitrophic native planting areas, riparian areas, stream
restoration areas, and wetland and stream mitigation areas, provide the minimum ground preparation
necessary to provide seed to soil contact. Riparian areas may also be seeded using the no-till method. The
no-till method is defined by planting permanent grass seeds using a drill-type seeder over existing vegetation
without plowing or tilling soil. Ensure that existing vegetation is less than 3 inches in height (this may be
achieved by mowing or using a mechanical string trimmer).
When grassing areas adjacent to residential or commercial lawns, the Engineer shall change the plant material
to match the type of grass growing on the adjacent lawn. The Contract Unit Price will not be modified for
this substitution.
Apply temporary grassing according to Subsection 163.3.05.F. Determine lime requirements by a laboratory soil
test. Refer to seeding Table 5 for species, amounts of seed and planting dates.
In March or April of the year following planting and as soon as the weather is suitable, replace all areas of
temporary grass with permanent grass by plowing or overseeding using the no-till method. If the no-till method is
used, ensure that temporary grass is less than 3 in. in height (this may be achieved by mowing). Additional mulch
will be required only if the temporary grass does not provide adequate mulch to meet the requirements of
Subsection 700.3.05.G, Mulching.
Temporary grass, when required, will be paid for according to Section 163.
Projects that consist of asphalt resurfacing with shoulder reconstruction and/or shoulder widening: Type II Wood
Fiber Blanket is used to stabilize disturbed areas, no till seeding will be used when permanent grassing is applied
and the areas will not be re-disturbed. 1347134713471347
Apply and mix lime and fertilizer as follows:
Uniformly spread agricultural lime on the ground at the approximate rate determined by the laboratory
soil test.
agricultural lime as filler material is to be shown on the fertilizer bag or invoice from the supplier. Do not
deduct any amount of fertilizer when lime is used as filler.
Uniformly spread the fertilizer selected according to Subsection 700.2.D over the ground or by use
of hydroseeding.
For bid purposes base estimated quantities on an initial application of 400 lb./acre of 19-19-19.
Before proceeding, uniformly work the lime and fertilizer into the top 4 in. (100 mm) of soil using harrows,
rotary tillers, or other equipment acceptable to the Engineer.
On cut slopes steeper than 3:1, other than serrated slopes, reduce the mixing depth to the maximum practical
depth as determined by the Engineer.
Omit mixing on serrated slopes.
Wetland and Stream Mitigation Areas
Omit the application of lime and fetilizer within riparian areas.
Prepare seed and sow as follows:
Inoculate each kind of leguminous seed separately with the appropriate commercial culture according to the
manufacturer’s instructions for the culture.
When hydroseeding, double the inoculation rate.
Protect inoculated seed from the sun and plant it the same day it is inoculated.
Weather permitting, sow seed within 24 hours after preparing the seed bed and applying the fertilizer and
lime.
Sow seed uniformly at the rates specified in the seeding tables. Use approved mechanical seed drills, rotary
hand seeders, hydroseeding equipment, or other equipment to uniformly apply the seed. Do not distribute
by hand.
To distribute the seeds evenly sow seed types separately, except for similarly sized and weighted seeds. They
may be mixed and sown together.
Do not sow during windy weather, when the prepared surface is crusted, or when the ground is frozen, wet, or
otherwise non-tillable.
Temporary grass areas that were prepared in accordance with Subsection 700.3.05.A, may be overseeded
using the no-till method. The no-till method is defined by planting permanent grass seeds using a drill-type
seeder over existing temporary grass without plowing or tilling soil and in accordance with Subsection
700.3.05.C.
Table 3 (Native Grasses) and at least two (2) species from Seeding Table 4 (Approved Riparian Mitigation -
Herbaceous Plants). The seed, shall be applied as Permanent Grassing within those areas designated on the
plans. The kinds of seed, shall be used according to the appropriate Planting Dates given in the tables. 1348134813481348
Hydroseeding may be used on any grassing area. Under this method, spread the seed, fertilizer, and wood fiber
mulch in the form of a slurry. Seeds of all sizes may be mixed together. Apply hydroseeding as follows:
Apply wood fiber mulch at approximately 500 lbs./acre (560 kg/ha).
prevent an even application.
Native Restoration Areas, Multitropic Native Planting Areas, Riparian Areas, Stream Restoration Areas, and
Wetland and Stream Mitigation Areas may be hydroseeded. When hydroseeding in these areas only use
water, seed and wood fiber mulch.
Except as noted in Subsection 700.3.05.B and Subsection 700.3.05.C, apply mulch immediately after seeding
areas as follows:
Areas with permanent grass seed and covered with slope mats or blankets will not require mulch.
Evenly apply straw or hay mulch between 3/4 in. and 1-1/2 in. (20 mm and 40 mm) deep, according to the texture
and moisture content of the mulch material.
Mulch shall allow sunlight to penetrate and air to circulate as well as shade the ground, reduce erosion, and
conserve soil moisture. If the type of mulch is not specified on the plans or in the Proposal, use any of the
following as specified.
Apply mulch with tackifier regardless of whether using ground or hydroseeding equipment for seeding.
using a blower, thoroughly loosen baled material before feeding it into the machine so that it is broken up.
enough to prevent new grass from emerging (if required).
Do not apply mulch on windy days.
If distributing the mulch by hand, immediately apply the tackifier uniformly over the mulched areas.
• Tackifier: Use a tackifier listed in the Laboratory Qualified Products Manual and apply at the
manufacturer’s recommended rates.
Apply walked-in-mulch on slopes ranging in steepness from 5:1 to 2:1 and treat as follows:
slope.
Mitigation Areas after they have been seeded. The wheat straw mulch is to be applied with a maximum
thickness of 1 in. 1349134913491349
Furnish and install sod in all areas shown on the plans or designated by the Engineer.
Use only Common Bermudagrass (Cyndon dactylon) or one of the following Bermudagrass varieties:
Tifway 419
Tifway II
Tift 94
Tifton 10
Midlawn
Midiron
GN-1
Vamont
No dwarf Bermuda types shall be used. Sod shall be nursery-grown and be accompanied with a Georgia
Department of Agriculture Live Plant License Certificate or Stamp. Sod shall consist of live, dense, well-rooted
material free of weeds and insects as described by the Georgia Live Plant Act.
Furnish either big roll or block sod. Ensure that big roll sod is a minimum of 21 in. wide by 52 ft. long.
Minimum dimensions for block sod are 12 in. wide by 22 in. long. Ensure all sod consists of a uniform soil
thickness of not less than 1 in.
Excavate the ground deep enough and prepare it according to Subsection 700.3.05.A to allow placing of sod.
Spread soil, meeting the requirements of Subsection 893.2.01, on prepared area to a depth of 4 in.
Apply lime and fertilizer according to Subsection 700.3.05.D within 24 hours prior to installing sod.
Do not place sod on frozen ground or where snow may hinder establishment.
Install Sod as follows:
• Place sod by hand or by mechanical means so that joints are tightly abutted with no overlaps or gaps.
Use soil to fill cracks between sod pieces, but do not smother the grass.
• Stake sod placed in ditches or slopes steeper than 2:1 or any other areas where sod slipping
can occur.
• Use wood stakes that are at least 8 in (200 mm) in length and not more than 1 in. ( 25 mm) wide.
• Drive the stakes flush with the top of the sod. Use a minimum of 8 stakes per square yard (meter) to
hold sod in place.
• Once sod is placed and staked as necessary, tamp or roll it using adequate equipment to provide good
contact with soil.
• Use caution to prevent tearing or displacement of sod during this process. Leave the finished surface of
sodded areas smooth and uniform.
After the sod has been placed and rolled or tamped, water it to promote satisfactory growth. Additional
watering will be needed in the absence of rainfall and during the hot dry summer months. Water may be
applied by Hydro Seeder, Water Truck or by other means approved by the Engineer.
Dormant Bermuda grass sod can be installed. However, assume responsibility for all sod through
establishment and until final acceptance.
1350135013501350
Apply nitrogen at approximately 50 lbs./acre (56 kg/ha) when specified by the Engineer after plants have grown to
2 in. (50 mm) in height.
One application is mandatory and must be applied before Final Acceptance.
Apply nitrogen with mechanical hand spreaders or other approved spreaders capable of uniformly covering the
grassed areas. Do not apply nitrogen on windy days or when foliage is damp.
Do not apply nitrogen between October 15 and March 15 except in Zone 4.
Wetland and Stream Mitigation Areas
Do not apply nitrogen to these areas.
areas including waters of the state.
laboratory (1-hour storm duration, 3 in. (75 mm) rainfall per hour).
cut and fill slopes, permanently grassed or temporarily grassed, either prior to grassing or in conjunction with
hydroseeding operations. Mulch will not be eliminated.
Stream Mitigation Areas
700.3.06 Quality Acceptance
The Engineer may require replanting of an area that shows unsatisfactory growth for any reason at any time.
Except as otherwise specified or permitted by the Engineer, prepare replanting areas according to the specifications
as if they were the initial planting areas. Use a soil test or the Engineer’s guidance to determine the fertilizer type and
application rate, then furnish and apply the fertilizer.
700.3.07 Contractor Warranty and Maintenance
Before Final Acceptance, provide plant establishment of the specified vegetation as follows:
Preserve, protect, water, reseed or replant, and perform other work as necessary to keep the grassed areas in
satisfactory condition.
Water the areas during this period as necessary to promote maximum growth.
Mow seeded areas of medians, shoulders, and front slopes at least every 6 months. Avoid damaging
desirable vegetation. 1351135113511351
In addition, mow as necessary to prevent tall grass from obstructing signs, delineation, traffic movements,
sight distance, or otherwise becoming a hazard to motorists.
Do not mow lespedezas or tall fescue until after the plants have gone to seed.
Apply fertilizer based on the initial soil test report at half the recommended rate each spring after initial plant
establishment. For bid purposes apply 200 lbs./acre of 19-19-19. Continue annual applications until Final
Acceptance. This additional fertilizer will be measured and paid for at the Contract Unit Price for fertilizer
mixed grade.
Do not apply additional fertilizer to Native Restoration Areas, Multitropic Native Planting Areas, Riparian Areas,
Stream Restoration Areas, and Wetland and Stream Mitigation Areas.
Provide satisfactory growth and coverage, ensuring that vegetation growth is satisfactory with no bare spots
larger than1 ft.² (0.1 m²). Bare spots shall comprise no more than 1 percent of any given area. An exception is
given for seed not expected to have germinated and shown growth at that time.
When all Items of the work are ready for Final Acceptance except for newly planted repaired areas or other areas
with insufficient grass, the Contractor may fill the eroded areas or treat bare areas with sod obtained, placed, and
handled according to Subsection 700.3.05.H.
Carefully maintain the line and grade established for shoulders, front slopes, medians, and other critical areas.
Sod as described above will not be paid for separately but will be an acceptable substitute for the satisfactory
growth and coverage required under this specification. These areas treated with sod are measured for payment
under the Item for which the sod is substituted.
700.4Measurement
Permanent Grassing will be measured for payment by the acre (hectare).
Straw or hay mulch applied to permanent grassing areas will be measured by the ton (megagram). Wood fiber
mulch furnished by the Contractor for permanent grassing is not measured for separate payment.
Sod is measured for payment by the number of square yards (meters) , surface measure, completed
and accepted.
Water furnished and applied to promote a satisfactory growth is not measured for payment.
Lime and fertilizer are measured by the ton (megagram). Lime used as a filler in fertilizer is measured by the ton
(megagram).
Nitrogen is measured in pounds (kilograms) based on the weight of fertilizer used and its nitrogen content.
No measurement for payment is made for any materials or work required under Subsection 700.3.06 and
Subsection 700.3.07. 1352135213521352
Temporary grass is measured for payment by the acre (hectare) according to Section 163.
and Wetland and Stream Mitigation Areas
Seeded Native Restoration Areas, Multitropic Native Planting Areas, Riparian areas, Stream Restoration area, and
Wetland and Stream Mitigation areas will be measured by the acre (hectare). and included under the pay item
Native Restoration and Riparian Seeding.
700.4.01 Limits
General Provisions 101 through 150.
700.5Payment
As grassing and planting progress, the Contractor will receive full measurement and payment on regular monthly
estimates provided the work complies with the specifications.
Permanent grassing will be paid for at the Contract Price per acre (hectare), complete and in place. Payment is full
compensation for preparing the ground, seeding, wood fiber mulch, polyacrylamide, and providing plant
establishment, soil tests and other incidentals.
Straw or hay mulch required for Permanent Grassing will be paid for according to Section 163.
Fertilizer mixed grade will be paid for at the Contract Price per ton (megagram). Payment is full compensation for
furnishing and applying the material.
Lime will be paid for at the Contract Price per ton (megagram). Lime used as filler in fertilizer will be paid for per
ton (megagram). Payment is full compensation for furnishing and applying the material.
Nitrogen will be paid for at the Contract Price per pound (kilogram) of nitrogen content. Payment is full
compensation for furnishing and applying the material.
is full compensation for ground preparation, including addition of topsoil, furnishing and installing live sod, and
for Plant Establishment.
viable at the inspection made at the end of the first spring after installation.
viable at the Final Acceptance.
Temporary Grass will be paid for under Section 163. 1353135313531353
and Wetland and Stream Mitigation Areas
Seeded Native Restoration Areas, Multitropic Native Planting Areas, Riparian areas, Stream Restoration area, and
Wetland and Stream Mitigation areas will be paid for at the Contract Price per acre (hectare), complete and in
place. Payment is full compensation for preparing the ground, seeding, and providing plant establishment and
other incidentals. and included under the pay item “Native Restoration and Riparian Seeding”.
Payment will be made under:
Item No. 700 Permanent grassing Per acre (hectare)
Item No. 700 Agricultural lime Per ton (megagram)
Item No. 700 Fertilizer mixed grade Per ton (megagram)
Item No. 700 Fertilizer nitrogen content Per pound (kilogram)
Item No. 700 Sod Per square yard (meter)
Item No. 700 Native Restoration and Riparian Seeding Per acre (hectare)
700.5.01 Adjustments
General Provisions 101 through 150.. 1354 1354 1354 1354
Grassing in other states